10. Priority
24
Switching commands with the data assignment can be occupied with
different priorities (block number 00 and priority 0 is defined for
switching commands without date assignment).
If you start with a date during programming, a new block number and
priority 2 are always offered = default for a single date.
If a date range is entered – with the key –, priority 1 is automatically
assigned. The priority can be changed between 1 and 9. The switching
command with the higher priority is executed first.
Example: Within a date range, e. g. 9.6 to 30.6 (priority 3),
it is possible to assign priority 4 or higher to a single day,
e. g. 22.6, but
only
in separate blocks.
Press the Prior. key step-wise.
The numbers change:
2 – 3 – 4 – … – 9 – 1 – 2 – …
etc.
1 – 2 – 3 – 4 – … – 9 – 1 – 2 – …
09.06 bis 30.06
etc.
Blank line
Switching commands
Switching commands
……………
Pulse switching commands
Cycle switching commands
etc.
Block 01
Priority 3
22.06
etc.
Blank line
Switching commands
Switching commands
……………
Pulse switching commands
Cycle switching commands
etc.
Block 02
Priority 4