
Section 10: Side Pellet Store
Page 45
store and into the boiler casing. Leave finger tight at this stage.
Refer to Figure 10-9.
Figure 10-9:
Refitting the two hex head screws
13. Fit the top joining channel between the boiler and side pellet
store with the V-shaped tongue facing towards the back of
the boiler/side store. Carefully slide the jointing channel in the
V-shaped groove formed between the two boilers. Refer to
Figure 10-10.
Figure 10-10:
Fitting the top joining channel
14. Push the channel as far back as possible – until the fixing holes
in the flat sections (on each side of the V) line up with the holes
in the top edges of the side panels on both the boiler and side
pellet store.
15. Secure the channel in place using the six screws previously
removed from the top edges of the side panels. Refer to Figure
10-11.
Figure 10-11:
Fitting the top joining channel screws
16. Re-fit the centre section of the grille inside the side pellet store
and secure with the single fixing screw previously removed. Refer
to Figure 10-7.
17. Finally, from inside the side pellet store; tighten the two hex head
screws to secure the bottom of the side pellet store to the boiler
casing.
the hinged lids on both the boiler and side pellet store are
each fitted with a cut-out switch and BOtH must be closed in
order for the boiler to operate.
nOtE
!