![Grant External Vecta Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/grant/external-vecta/external-vecta_installation-and-servicing-instructions_2256729003.webp)
1 introduction
4
1.1 How the Condensing Wood Pellet Boiler Operates 5
1.2 Boiler Description
5
1.3 Access
5
1.4 Flue System
5
1.5 Boiler Components
6
1.6 Logo Indicator
7
1.7 Boiler Cleaning and Servicing
7
2 technical Data
8
2.1 Technical Specifications
8
2.2 Burner Settings
9
2.3 Flue Gas Analysis
9
2.4 Clearances and Dimensions
9
3 Pellet Specification
11
3.1 Pellet Specification
11
3.2 Biomass Suppliers List
11
4 installation information
12
4.1 Boiler Location
12
4.2 Regulations
12
4.3 Heating System
12
4.4 Pipework Materials
13
4.5 Connections
13
4.6 Wash System
14
4.7 Before you Commission
14
4.8 Completion
14
4.9 ‘Meter Ready’ Installations
14
5 Condensate Disposal
16
5.1 General Requirements
16
5.2 Connections
16
5.3 Pipework
16
5.4 External Pipework
16
5.5 Condensate Trap
17
5.6 Inspection and Cleaning of Trap
17
6 Sealed Systems
18
6.1 Sealed System Requirements
18
6.2 Filling the Sealed System
19
6.3 Venting the Pump
19
6.4 Pressure Relief (Safety) Valve Operation
19
7 Flue System and air Supply
20
7.1 Air Supply
20
7.2 Flue Terminal Position and Clearances
20
7.3 Flue System Specification
21
7.4 Flue System Assembly
22
7.5 Flue Testing
23
7.6 Flue Notice Plate
23
7.7 Typical Flue Systems
24
7.8 Flue System Component Dimensions
27
7.9 Flue System Components
28
8 Electrical
30
8.1 General Requirements
30
8.2 Boiler Electrical Connections
30
8.3 Remote Grant Logo Indicator Connections
31
8.4 Connecting the Power Supply
31
8.5 Heating System Controls
31
8.6 Frost Protection
31
8.7 S-plan
32
8.8 Y-plan
32
8.9 Boiler Wiring Diagram
33
9 Boiler Operation
34
9.1 General
34
9.2 Modulation
34
9.3 Automatic Cleaning
35
9.4 Boiler Control Panel
36
9.5 Boiler Setpoint Temperature
37
9.6 Service Menu (including Parameter Menu)
37
9.7 Parameter Menu
38
9.8 Boiler Operating Sequence
40
9.9 Boiler Operation Flow Chart
41
10 Side Pellet Store
42
10.1 General
42
10.2 Operation
42
10.3 Installation
43
10.4 Electrical Connections
46
10.5 Commissioning the Side Store
47
11 Commissioning
48
11.1 Equipment Required
48
11.2 Preliminary Inspection
48
11.3 Boiler
48
11.4 Hopper Lid Cut-out Switch
51
11.5 Control Settings
51
11.6 Priming the Pellet Feed Auger
51
11.7 Lighting the Boiler
51
11.8 Combustion Chamber Draught
52
11.9 Flue Gas Analysis
52
11.10 Customer Handover
52
11.11 Commissioning Report Form
52
11.12 Commissioning Check List
53
12 Servicing
54
12.1 General
54
12.2 Checks Before Servicing
54
12.3 Heating System
54
12.4 Flue System
55
12.5 Combustion Ventilation
55
12.6 Boiler
55
12.7 Burner
58
12.8 Ignition Element
59
12.9 Condensate Disposal System
60
12.10 Boiler Settings
60
12.11 Hopper Lid Cut-out Switch
60
12.12 Combustion Checks
60
13 Fault Finding
61
13.1 Fault Codes
61
13.2 Fault Details
62
14 Spare Parts
64
15 the Clean air act 1993 and
66
Smoke Control areas
16 Declaration of Conformity
67
17 Health and Safety information
68
18 Disposal and Recycling
69
19 Guarantee
70
Contents
Page 3
Contents