BEFORE YOU START

Please ensure that you check all the component parts for quantity and quality before you commence 
building the product. Report any missing parts immediately. The manufacturer will not accept any 
responsibility for damaged items once any part of the product has been fitted or altered in any way.

Timber is a natural material and will react to varying levels of moisture content - ie. will swell or shrink. 
All of the Timber components are pressure treated green. However, should extra protection be required, 
they should be treated using a wood preservative treatment, following the manufacturers maintenance 
instructions.

HEALTH AND SAFETY

Do not overstretch when working from the step ladder.

Take care and follow the instructions when cutting the shingles.

No work should be carried out on the roof without the use of a board to distribute the load.

In order to reduce the risk of suffocation please keep all plastic bags and small parts away from children.

When you are ready to start, make sure you have the right tools to hand, plenty of space and a clean, dry 
area for assembly. 

Two people are required to carry out the work.

PREPARATION

Make sure the area where the Tea House is to be erected is clear and level for building the structure.

ASSEMBLY INSTRUCTIONS

STEP 1

Using the ‘footprint’ provided mark
out the area where the 
Tea House will be erected.
Prepare holes for the posts allowing
for the concrete. 
Each post should be at least 300mm
deep.

NB. The Tea House should only 
be erected with the posts 
concreted into the ground.

STEP 2

Take two Posts (

1

) and a Rafter (

2

).

Position the posts into two of the holes
and fix the rafter into the top of the
posts using the screws (

u

).

NB. It is preferable for Rafter (

2

) to be

in the same direction as the Apex
Rafter (

4

)

STEP 3

Take the remaining posts and Rafter
(

2

) and assemble in the same manner

in the opposing two holes.

STEP 4

Fix one of the Rafters (

3

) into the top

of each of the two assemblies to tie the
two together 

(as fig.3)

.

3

0

0

m

m

1

STEP 2

TEA HOUSE
FOOTPRINT

2

.4

9

5

m

 s

q

.

1

u

1

2

2

3

fig.3

DIRECTION
OF APEX
RAFTER

Содержание TEA HOUSE PERGOLA

Страница 1: ...l 01952 588088 Fax 01952 581522 Email sales grangefen co uk Web www grangefen co uk 3 36m 2 63m TOP VIEW ALL PRODUCTS ARE MEASURED TO THE HIGHEST AND WIDEST POINT AND ALL SIZES ARE APPROXIMATE By buyi...

Страница 2: ...for 4 posts PARTS LIST TIMBER POSTS 4 RAFTER LOWER 2 RAFTER UPPER 2 APEX RAFTER 1 CURVED BEAM 8 CURVED SUPPORT BEAM 2 LEFT HAND CURVED SUPPORT BEAM 2 RIGHT HAND CURVED FASCIA BEAM 2 LEFT HAND CURVED...

Страница 3: ...and small parts away from children When you are ready to start make sure you have the right tools to hand plenty of space and a clean dry area for assembly Two people are required to carry out the wor...

Страница 4: ...Take the Apex Rafter 4 and mark the position for the curved beams Measure from the centre STEP 11 Position one of the curved beam assemblies across one of the Rafters 3 as fig 6 STEP 12 Locate the Ape...

Страница 5: ...ed end to the apex beam 345mm from the curved beam Use two screws v to fix the lower end to the Rafter 3 STEP 21 Repeat the procedure for the remaining three support beams ROOFING The structure is now...

Страница 6: ...ne of the eave shingles and align the centre with the centre marked on the roof An overhang of 30mm should be allowed at the edge of the roof Remember to peel off the protective plastic on the back of...

Страница 7: ...shingles and equally spaced either side of the apex Use two Clout Nails y to fix it in place on the side where the next shingle will cover them Remember to remove the protective plastic from the back...

Страница 8: ...k when humidity rises It is nature at work and not considered a fault Its colour will also change with time A retreatment as required with a proprietary wood treatment is recommended CARE OF YOUR TEA...

Отзывы: