Before you begin take time to complete this check list.
Take inventory of all parts using the parts list at the back of this manual.
Instruction for the Back Door Transformation kit are noted in this manual.
Be cautious where you place the polycarbonate panels as they will burn grass
or plants if left on top of them in direct sunlight. Note that clear film side of
panels should always face the sun and opal film side faces inside greenhouse.
Panels may scratch easily so be very carful what you clean them with.
Plan out when and where you are going to place the greenhouse, we recom-
mend that you place it in an area that will receive direct sunlight and will be
protected from the wind as much as possible
It will take at least (2) people to put the greenhouse together.
Before your build, make sure you are allowed to build it! Consult all building
codes, as well as City or Municipality ordinances and HOA’s, as you may need
a permit or documentation before you build.
Contact your insurance company to make sure your Grandio Greenhouse will
be covered on your policy.
Call your local utilities companies before digging.
Do not attempt to begin construction on a windy day.
Your greenhouse should be built on a flat level surface allowing for drainage.
Read this entire manual to get familiar with all pieces and parts prior to
beginning assembly. Follow the steps outlined in the order presented!
Save this owner’s manual for future
reference and if you need our help.
CONTACT OUR CUSTOMER SERVICE
DEPARTMENT at:
1-866-448-8231
Hours: 8:30a.m.-5:00p.m. Monday through
Friday (Mountain Standard Time)
Backyard Living Source
9543 W. Emerald St., Suite 101
Boise, ID 83704
www.grandiogreenhouses.com
1.2
Slide the BA-C3 into the BA-S1, slide the BA-S2 into the BA-C3, align the holes and push together to an even and tight
position and use the BA-S03 bolt and BA-M03 collard nut combo, tighten the collard nut on the inside of the base kit using the
10mm wrench. Repeat this process on all corners. See and .
Note: Placement of BA-S1 will be at front and the back, while the BA-S2’ s will be the sides of your greenhouse base.
1.3
For ground installation only insert the (4) BA-A1’s and (4) BA-S03/ML01 combos to the four corners as shown in .
When all of the BA-A1’s are installed you can adjust the bolts to level the base. If you are installing on a flat mount surface see
page 9.
BASE KIT ASSEMBLY INSTRUCTIONS
8
STEP ONE
BA-S1
BA-S2
FRONT
SIDE
BA-C3
BA-A1
BA-S03
ML01
BA-C3
BA-S1
BA-S2
BA-S03
BA-M03 Collared Nut
BA-S03
BA-M03 Collared Nut
BA-A1
BA-S03