7.
Wipe each part with a medical grade cotton swab ensuring that there are no visible stains or debris.
8
. Once cleaned, completely dry all of the parts.
REPLACING THE CLEANED PRESSURE RELIEF VALVE:
9.
Place the stainless steel ball into the body of the valve and screw the plug onto the body by hand.
10.
With the 5mm hex key screw in the assembled pressure relief valve into the back bar until tight, making sure not
to exert too much force.
11.
Test the operation of the pressure relief valve ensuring that it relieves pressure at 5 cmH
2
O.
12.
If the pressure relief valve does not function correctly, replace it with a new one.
32
Содержание Universal Anaesthesia Machine
Страница 1: ...Universal Anaesthesia Machine Maintenance Manual...
Страница 14: ...12...
Страница 38: ...36 13 16 28 17 18 24 19 20A 20B 19A 30 47 10 11 12 14 16 13 24 1 44 3B 2A 26 7 21 9 8 31 42 43 3A 2B 20 B...
Страница 39: ...37 2 3 6 41 35 33 32 36 32 34 38 37 35 33 32 36 41 32 6 4 5 46 15 45 49 48 B B...
Страница 40: ...38 41 36 37 39 6 40...
Страница 41: ...39 25 27 29...
Страница 48: ...NOTES...
Страница 49: ......