Preparing ThermoLazer 200/200TC/300TC for Application
3A1319K
29
Preparing ThermoLazer 200/200
TC
/
300
TC
for Application
1. Secure the unit by chocking wheels and applying
parking brake.
2. Make sure kettle burners and screed box burners
are lit.
3. Allow kettle to heat up before adding material. If ket-
tle is completely empty, allow kettle to reach
300° - 350° F (149° - 177° C) before adding mate-
rial. If kettle has material, allow material to reach
380° F (193° C) before adding material.
4. Secure ThermoLazer by chocking wheels.
5. Add thermoplastic material to kettle.
6. Move Gate Valve Actuator (S) to raised position and
fill screed box with melted thermoplastic material.
NOTE:
The material gate is adjustable. The gate is
factory set at a 0.5 in. (1.3 cm) gap. You can
increase this gap for more material flow or decrease
the gap for less material flow.
7. Do not overfill material in kettle. Overfill would be
material higher than 5 in. (13 cm) below top of ket-
tle.
8. Close and latch cover access doors when applying
thermoplastic.
9. Avoid bumping or impacting Thermolazer to prevent
spillage or splashing of hot material.
BURN HAZARD
Keep all access covers closed and latched when equip-
ment is in use.
Always secure ThermoLazer by chocking wheels when
adding thermoplastic.
ti14603a
ThermoLazer 300
TC
shown
ti14122b
ti14123a
S
0.5 in.
ti14410a
5.0 in.
Overfill
Line
Содержание ThermoLazer
Страница 39: ...Notes 3A1319K 39 Notes ...