Installation
26
333586E
4. Insert the power cord through the cord grip and into
the Power Junction Box (AJ).
5. Attach the ground wire to the ground lug inside the
Power Junction Box (AJ).
6. Refer to F
and connect the wires from the
power cord into terminals 4T2 and 6T3 on the Dis-
connect Switch terminal block.
NOTE:
Use a flat-head or Pozidriv screwdriver to tighten
the terminals to 7-10 in-lb (0.8-1.1 N•m).
7. Tighten the cord grip to securely hold the power
cord to the Power Junction Box (AJ).
8. Replace the Power Junction Box cover and secure it
with the six screws that were removed in step 2.
Heated Systems
1. Turn the Heat Control Box Disconnect Switch (AZ)
OFF.
2. Loosen the screws and remove the cover (350) on
the Heat Control Box (AX).
3. Insert the electrical cord through the electrical
enclosure strain relief bushing (SR).
4. Attach insulated ferrules to the end of each wire.
5. Connect the ground wire to the ground stud (GS).
6. Connect power wires to the Heat Control Box Dis-
connect Switch (AZ) as shown below.
NOTE:
Use a flat-head or Pozidriv screwdriver to tighten
the terminals to 7-10 in-lb (0.8-1.1 N•m).
7. Tighten the strain relief bushing (SR) around the
electrical cord.
8. Close the Heat Control Box door (350).
F
IG
. 14: Remove the Power Junction Box Cover
F
IG
. 15: Power Connection
F
IG
. 16: Disconnect Switch Terminal Block
Screws
AJ
Ground Lug
Cord Grip
Disconnect Switch
Terminal Block
1L1 3L2 5L3
2T1 4T2 6T3
F
IG
. 17
SR
350
GS
AZ
ti31214a
Содержание 333586E
Страница 96: ...Wiring Diagrams 96 333586E Wiring Diagrams...
Страница 97: ...Wiring Diagrams 333586E 97...
Страница 98: ...Wiring Diagrams 98 333586E...
Страница 99: ...Wiring Diagrams 333586E 99...