Service
308687L
9
Battery Replacement Procedure
(F
1.
Relieve Pressure
, (see procedure in previous sec-
tion).
2. Remove the four screws (3) holding the electronic
control (1) and metering unit (4) together.
3. Remove the battery.
4. Install the new battery.
NOTE:
See Technical Data, page 13 for recommended
batteries.
5. Install the electronic control to the metering unit (4),
aligning the longer screws boss on the meter hous-
ing with the counter bore in the plastic housing.
6. Install the four screws (3) holding the electronic
control (1) to the metering unit (4) together. Torque
the screws to 15-20 in-lb (1.7 to 2.3 N•m) or until
no gap exists between the electronic control and
the metering unit.
Electronic Control Replacement
Procedure (F
1.
Relieve Pressure
, (see procedure in previous sec-
tion).
2. Remove the four screws (3) holding the electronic
control (1) and metering unit (4) together.
3. Remove the battery. (See Battery Replacement
Procedure in the previous section).
F
IG
. 5
NOTICE
To avoid pinching the battery wires, install the bat-
tery as shown in F
. 5. The battery wire should
extend to the far side of the battery compartment.
NOTICE
Closing the gap between the electronic control and
the metering unit is very important; it ensures that
no moisture can enter the electronics.
F
IG
. 6