Service
10
308687L
4. Remove all gasket material from the metering unit
(4).
5. Assemble adhesive side of new gasket (2) to meter-
ing unit (4).
6. Replace battery (see Battery Replacement Proce-
dure, page 9).
7. Install the electronic control to the metering unit (4),
aligning the longer screws boss on the meter hous-
ing with the counter bore in the plastic housing.
8. Install the four screws (3) holding the electronic
control (1) to the metering unit (4) together. Torque
the screws to 15-20 in-lb (1.7 to 2.3 N•m) or until
no gap exists between the electronic control and
the metering unit.
NOTICE
To avoid pinching the battery wires, install the bat-
tery as shown in F
. 5. The battery wire should
extend to the far side of the battery compartment.
NOTICE
Closing the gap between the electronic control and
the metering unit is very important; it ensures that
no moisture can enter the electronics.