![Graco 16R955 Скачать руководство пользователя страница 26](http://html.mh-extra.com/html/graco/16r955/16r955_installation-operation-and-parts_2250891026.webp)
LL250 Compressor Installation
26
332230N
Bead Tank Mounting
1. When only one bead tank is being installed, it
should be placed on the side of the frame furthest
from the compressor to best distribute weight.
2. Place bead tank on supporting base with outlet
fittings facing compressor.
3. Place clamping band around tank and secure with
mounting hardware shown below. Tighten until
there is no movement between clamp and bead
tank.
NOTE:
The flats on the clamp are not intended
to touch when hopper bracket is tightened.
NOTE:
Position handle to best suit filling needs.
Loosen bolt (AA) to help swivel, then retighten.
4. Install 36 in. nylon air line (DD) from top of regulator
to swivel fitting on top of bead hopper. Cut air hose
to desired length. Push air line into fitting until end
touches bottom of fitting.
ti24483a
ti24485a
ti20704a
AA
ti20493a
DD
Содержание 16R955
Страница 33: ...Notes 332230N 33 Notes ...
Страница 34: ...Parts Model 25R268 34 332230N Parts Model 25R268 ...
Страница 36: ...Parts Model 25R270 36 332230N Parts Model 25R270 ...