LL250 Pressurized Bead System Kit 25R270
332230N
17
LL250 Pressurized Bead System Kit 25R270
Assemble Compressor Mounting
and Drive Components
1. Use rubber mallet or wood block to position right
frame mount (L) flush to LL250 frame.
2. Place right frame mount (L) onto LL250 frame in
location shown below (approximately 1 in. from
cross member of LL250 frame).
NOTE:
To ensure
flush sitting, scrape frame free of any raised debris
on frame surface.
3. Cut any existing tie wraps that interfere (they will be
replaced later with new tie straps).
4. Loosely install two screws (M) and two locknuts (N)
through bottom of frame mount. Use 9/16 in. wrench
to fully tighten.
5. Secure hydraulic lines with zip ties.
6. Position left frame mount (W) on LL250 frame.
Remove any zip ties in the way. Use a rubber mallet
to tap into place if needed.
7. Make sure left and right frame mounts are aligned.
The left leg should mirror the right leg location from
LL250 frame cross member.
L
Inches
Centimeter
ti20511a
L
ti20512a
ti20509a
N
M
ti20507a
ti20501a
W
Содержание 16R955
Страница 33: ...Notes 332230N 33 Notes ...
Страница 34: ...Parts Model 25R268 34 332230N Parts Model 25R268 ...
Страница 36: ...Parts Model 25R270 36 332230N Parts Model 25R270 ...