17
Plugging In The Cables
Once all the components are connected,
you can attach the power cord to the
sewing machine, then connect the
power cord to an outlet.
When you are ready to begin sewing, turn
on the machine using the power switch
located on the back of the machine.
Below is a reference of how the machine
should be configured.
»
Encoder
»
Encoder
»
Foot Pedal
»
Quilt Motion Control
»
USB Connector Port
Off
On
Power
Adapter
Power
Cord
Quilt Motion
Tablet
Short
Encoder
Cable
Long
Encoder
cable
(For sit down system)
(Programming only)
(For optional Automation Accessory)
Содержание Q'nique 14+
Страница 1: ...Copyright Nov 15 2017 Jim M Bagley GraceWood Inc Reproduction Prohibited Version 3 7 ...
Страница 41: ......