18
Loosely connect the
track supports
to the frame with the 4 mm Allen wrench and the sixteen
M6 x 10 mm connector bolts
removed in “Step 2 - Building the Frame Table” on page 11.
6
Installing the Tracks (Continued)
Full Frame Assembly
Track Support (x2)
Connector Bolts
M6 x 10 mm (x16)
Carefully place the bottom carriage onto the
frame.
8
Bottom Carriage
Line up the
front track support
as close
to the edge of the frame as possible and
tighten the connector bolts.
7
Front Track Support
Slowly slide the carriage from one side of
the frame to the other. Tighten each of the
connector bolts in the back as the bottom
carriage passes over them.
9
Содержание Continuum II
Страница 1: ...Copyright January 14 2021 Grace Company Reproduction Prohibited Version 1 1 Assembly Use ...
Страница 62: ...62 Crib Frame Assembly Repeat steps 6 9 for the other two rails Installing the Velcro Tape Continued 10 ...
Страница 65: ...65 Using Your Frame This section describes how to attach fabric and how to use the channel locks ...