![Grace Continuum II Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/grace/continuum-ii/continuum-ii_assembly-and-use_2249739037.webp)
37
Step 13 - Installing Leader Cloth
Parts & Tools Needed:
Locate the
narrowest leader cloth
.
On all three leader cloths:
Fold each
cloth in half and mark the center-mark on
the front and back, top and bottom, with a
marker.
1
2
Instructions
The leader cloths attach the quit to the frame while maximizing the quilt surface that the machine
can reach.
Place the center of the
narrowest leader cloth
onto the Velcro tape in the center of the
take-up rail
, right side facing away from the frame.
3
Leader Cloth Set
Full Frame Assembly
Marker (not included)
Tape Measure (not included)
Narrowest Leader Cloth
(right side to the rear)
Narrowest
Leader Cloth
Take-up Rail
Содержание Continuum II
Страница 1: ...Copyright January 14 2021 Grace Company Reproduction Prohibited Version 1 1 Assembly Use ...
Страница 62: ...62 Crib Frame Assembly Repeat steps 6 9 for the other two rails Installing the Velcro Tape Continued 10 ...
Страница 65: ...65 Using Your Frame This section describes how to attach fabric and how to use the channel locks ...