![Grace Continuum II Скачать руководство пользователя страница 51](http://html.mh-extra.com/html/grace/continuum-ii/continuum-ii_assembly-and-use_2249739051.webp)
51
Crib Frame Assembly
Step 7 - Leveling the Frame
Parts & Tools Needed:
Instructions
Leveling the frame ensures the machine doesn’t pull away when stitching.
Open-End Wrench
14 & 17 mm
14
17
(Box 1: Inner Box)
Move the machine and bottom carriage to one corner of the frame, and release. If the machine
rolls away from the corner, use the 14 & 17 mm open-end wrench to adjust the
leveling foot
at the bottom of the leg.
1
Leveling Foot
Содержание Continuum II
Страница 1: ...Copyright January 14 2021 Grace Company Reproduction Prohibited Version 1 1 Assembly Use ...
Страница 62: ...62 Crib Frame Assembly Repeat steps 6 9 for the other two rails Installing the Velcro Tape Continued 10 ...
Страница 65: ...65 Using Your Frame This section describes how to attach fabric and how to use the channel locks ...