![GPS GPS-iMOD Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/gps/gps-imod/gps-imod_installation-operation-and-maintenance-manual_2248998003.webp)
www.globalplasmasolutions.com
Figure 1
Figure 2
Threaded
Post
Smooth
Post
Threaded
Receiver
Smooth
Receiver
Mechanical Installation
For standard applications, there should be a quantity of 1 GPS-iMOD bar assembly on each coil up to 60 inches in height.
The GPS-iMOD bar(s) should be spaced a maximum of 60 inches apart for appropriate ionization coverage on the coils.
iMOD bar shall cover the entire finned length of coil to the nearest 6” without exceeding the length of the coil. (see
FIGURE 13).
1. Determine which style of GPS-iMOD is being installed.
i. If using the screw-type iMOD, go to Step 1A (Refer to FIGURE 1 for GPS-iMOD screw-type with threaded
post).
ii. If using the snap-type iMOD, go to Step 1B (Refer to FIGURE 2 for GPS-iMOD snap-type without threads).
Step 1A – Assembly of screw-type GPS-iMOD
Once the mounting location has been verified, assemble the modular sections by inserting the male threaded post into
the female receiver of the first modular section already attached to the powerhead (see FIGURE 3) and tighten until the
modular housings are securely butted to each other. See FIGURE 4 below for correct assembly alignment. Please note,
it should take 3-4 complete revolutions to assemble properly. Continue process until all modules are assembled to the
desired length of the bar.
Not all the bars will screw together and line up with the brushes pointing in the same direction without using excessive
force that could damage the module. Below are directions to assemble the bars to ensure alignment.
iMOD ALIGNMENT
When the sections do not align properly after they have
been securely adjusted, as shown in FIGURE 5, disassemble
the section and place nylon spacer(s) provided by GPS
between the two sections as shown in FIGURE 6. Use
several if needed.