The GPS FC-3 is an air ionization system designed to be mounted inside of fan coils, heat pumps, ductless mini splits, 
and air handlers up to 3,200 CFM or 8 tons. There are Build Automation System (BAS) alarm contacts provided (orange 
wires) with the FC-3.

Hardware Provided by GPS

• FC-3 unit
• Fuse

Additional Hardware Provided by GPS with FC-3T model

• Power supply APV-12-24 (required for installations on voltages higher

than 24VAC)

Hardware Required by Installer

• Mounting screws
• Electrical connectors - Twist-on wire connectors or comp connectors
• Double sided tape

INSTALLATION LOCATION

GPS recommends the FC-3 be installed downstream from the filter blower and coil.

CAUTION:

 

MAKE SURE POWER IS DISCONNECTED TO THE HVAC EQUIPMENT BEFORE INSTALLATION

!

Figure 1

Figure 2

Содержание GPS-FC-3

Страница 1: ...Installation Operation Maintenance Manual GPS FC 3 3T BAS NOTICE This product is to be used only as directed Read entire manual before use Do not use unless properly installed ...

Страница 2: ...s with the FC 3 Hardware Provided by GPS FC 3 unit Fuse Additional Hardware Provided by GPS with FC 3T model Power supply APV 12 24 required for installations on voltages higher than 24VAC Hardware Required by Installer Mounting screws Electrical connectors Twist on wire connectors or comp connectors Double sided tape INSTALLATION LOCATION GPS recommends the FC 3 be installed downstream from the f...

Страница 3: ... will not damage refrigerant lines wires or other components When attaching the FC 3 to a grille or screen nylon ties may be used 3 The FC 3 ion emitters should not be touching any metal surface or wires Move and secure any wires that may come in contact with the ion emitters CAUTION THE NEEDLES MUST BE 2 INCHES AWAY FROM METAL SURFACES TO PREVENT ARCING NOTE Use Temperature Maximum Ambient temper...

Страница 4: ...ystem wires or terminals if present If no BAS system is present then insulate ends of wires and secure wires where they will not be damaged 120 VAC installation 1 Find a suitable location for the APV 12 24 Secure the APV 12 24 with self tapping screws or double sided tape 2 Route the wires so that they will not short abrade or damage other components 3 Connect the FC 3 to the low voltage side of A...

Страница 5: ...uld indicate voltage Maintenance CAUTION MAKE SURE POWER IS DICONNECTED BEFORE SERVICING The FC 3 requires very little maintenance Over time particles will accumulate on the ion emitters and they will need to be cleaned periodically In most applications annual cleaning will suffice 1 Turn power to the FC 3 off 2 Gently brush the ion emitters with a nylon brush toothbrush will work 3 Restore power ...

Страница 6: ...21 Global Plasma Solutions Inc To access a list of applicable patents please visit www gpspatents com GPS 041 16 R5 FC3 3T IOM ZERO OZONE EMISSIONS MEASURED OZONE EMISSIONS FROM GPS FC 3 BAS DURING USE PHASE DOES NOT EXCEED 0 005 PPM AS TESTED BY UL 867 UL COM ECV ...

Отзывы: