STEP 19A: ROPE MOUNT
1: PLACE THE 4 X 4 X 8" ROPE MOUNTS ONTO THE FRONT OF THE ARCHED TOP PANEL BOARD FLUSH TO THE TOP.
EACH ROPE MOUNT SHOULD BE 8-3/4" FROM THE END OF THE ARCHED TOP PANEL BOARD AS SHOWN IN DETAIL B
BELOW.
YOU MAY CHOOSE TO USE 5/16" X 2-1/2" LAG SCREWS WITH WASHERS OR T-NUTS WITH BOLTS TO ATTACH THE
ROPE BLOCKS. IF YOU USE LAG SCREWS THEN CONTINUE READING BELOW. IF YOU USE BOLTS THEN GO TO 2
BELOW.
IF YOU CHOOSE THE LAG SCREW METHOD THEN PRE-DRILL 9/64" HOLES BY 1" DEEP USING THE ROPE MOUNT HOLES
AS A GUIDE. THEN ATTACH THE MOUNTS WITH 5/16" X 2-1/2" LAG SCREWS WITH WASHERS. DO NOT OVER-TIGHTEN.
2: USE THE HOLES AS A GUIDE TO DRILL 3/8" DIAMETER HOLES THROUGH THE ROPE LADDER SUPPORT. DRILL
CAREFULLY SO YOU DO NOT SPLINTER THE WOOD AS THE DRILL BIT EXITS THE OTHER SIDE. YOU MAY PLACE A
SCRAP BLOCK OF WOOD ON THE BACK SIDE OF WHERE YOU ARE DRILLING TO PREVENT SPLINTERING,
BUT DO
NOT PLACE YOUR HAND NEAR THE DRILLING AREA.
3: HAMMER IN 5/16" T-NUTS INTO THE BACK SIDE OF THE HOLES AS SHOWN. NOW ATTACH THE ROPE MOUNTS WITH
5/16" X 2-1/2" HEX BOLTS AND 5/16" WASHERS.
5/16" T-NUT
5/16" WASHER
LAG SCREW
(READ TEXT!)
OR
5/16" X 2-1/2"
DETAIL B
SCALE 1 : 12
5/16" X 2-1/2"
HEX BOLT
4 X 4 X 8"
ROPE MOUNTS
"
4
3
8
8 34 "
B
67
Содержание Pioneer Peak
Страница 64: ...PART 2 CLATTER BRIDGE ASSEMBLY 102...
Страница 94: ...APPENDIX 132...