1" TO 1-3/4"
CHAIN MUST GO THROUGH
TWO BOARDS
NO EXCEPTIONS
!!
A
QUICK LINK
DETAIL A
SCALE 1 : 6
NOTE: TO ACHIEVE THE CORRECT
GAP YOU MAY NOT BE CONNECTING
THE END LINK OF EACH CHAIN. FOR
EXAMPLE YOU MAY HAVE TO
CONNECT THE SECOND, THIRD OR
FORTH LINKS TOGETHER.
2: THERE SHOULD BE AT LEAST A 1" TO 1-3/4" GAP BETWEEN THE BRIDGE DECK BOARD AND THE BOTTOM
THREAD THEM THROUGH THE QUICK LINK TO KEEP THEM UP AND OUT OF THE WAY.
IN A MANNER TO ACHIEVE THE CORRECT GAP. GO UNDERNEATH THE TOWER DECK AND USE A QUICK
PANEL BOARD ON THE TOWER. THIS MEANS THAT YOU WILL HAVE TO CONNECT THE ENDS OF THE CHAINS
STEP 21: BRIDGE DECK/CHAIN INSTALLATION
LINK TO ATTACH THE CHAINS TOGETHER. IF YOU HAVE LOOSE ENDS OF THE CHAINS HANGING DOWN
1: LAY THE BRIDGE DECK/CHAINS ASSEMBLY BETWEEN THE PLAY SET AND THE TOWER WITH THE CHAINS
FACING THE GROUND. THREAD THE CHAIN ENDS IN THE BRIDGE DECK ASSEMBLY THROUGH THE HOLES IN
THE BOTTOM PANEL BOARD AND DECK SUPPORT BOARD ON THE TOWER.
3: REPEAT THIS PROCESS AT THE PLAY SET
TO ATTACH THE CHAINS. AT THE PLAY SET EACH
CHAIN MUST GO THROUGH TWO BOARDS.
NO EXCEPTIONS
.
123
Содержание Pioneer Peak
Страница 64: ...PART 2 CLATTER BRIDGE ASSEMBLY 102...
Страница 94: ...APPENDIX 132...