STEP 30: IRON DUCTILES
1: LINE UP THE HOLES OF THE IRON DUCTILES WITH THE HOLES IN THE SWINGBEAM.
2: FASTEN THE SWING HANGER TO THE SWING BEAM USING 7" CARRIAGE BOLTS WITH TORQUE WASHERS, AND 3/8"
WASHERS WITH 3/8" LOCK NUTS.
3: PLACE BOLT CAPS OVER EXPOSED THREADS.
BOLT CAP
7" CARRIAGE BOLT
TORQUE WASHER
3/8" WASHER
3/8" LOCK NUT
IRON DUCTILE
66
Содержание Big Skye I
Страница 30: ...W CHAINS BAR SLIDE 1 10 WAVE TUBE SLIDE 1 RAD RIDE 1 W CHAINS TRAPEZE SWINGS 2 DESCRIPTION PICTURE QTY 30...
Страница 32: ...IRON DUCTILE SWING HANGERS TELESCOPE PERISCOPE 6 PICTURE DESCRIPTION QTY 1 1 32...
Страница 33: ...PICTURE DESCRIPTION QTY STEERING WHEEL ROPE LADDER STEPS SAFETY HANDLES PAIR 1 6 2 33...
Страница 34: ...90 GREEN BRACKET SPRING CLAMP 4 6 GLIDER SWING 1 PICTURE DESCRIPTION QTY 34...
Страница 36: ...1 1 2 TIC TAC TOE PANEL UNASSEMBLED CHIMNEY UNASSEMBLED DORMER FLAG KIT 2 PICTURE DESCRIPTION QTY 36...
Страница 118: ...1 ASSEMBLE AND INSTALL THE CHIMNEY AND DORMERS USING THE INSTRUCTIONS PROVIDED STEP 82 CHIMNEYAND DORMERS 118...