3" WOOD SCREW
ANGLE SUPPORT
2" WOOD SCREW
2 X 4 X 15"
UPPER LEVEL
2-1/2" WOOD SCREW
STEP 70: UPPER LEVEL ANGLE SUPPORTS
1: THE TWO 2 X 4 X 15" UPPER LEVEL ANGLE SUPPORTS ARE MOUNTED UNDER THE UPPER DECK ON THE BACK OF
THE FORT.
2: USE TWO 2-1/2" WOOD SCREWS ON TOP OF THE BRACE, AND ONE 2" AND ONE 3" WOOD SCREW TO FASTEN
THE ANGLE SUPPORTS TO THE CORNER POSTS.
106
Содержание Big Skye I
Страница 30: ...W CHAINS BAR SLIDE 1 10 WAVE TUBE SLIDE 1 RAD RIDE 1 W CHAINS TRAPEZE SWINGS 2 DESCRIPTION PICTURE QTY 30...
Страница 32: ...IRON DUCTILE SWING HANGERS TELESCOPE PERISCOPE 6 PICTURE DESCRIPTION QTY 1 1 32...
Страница 33: ...PICTURE DESCRIPTION QTY STEERING WHEEL ROPE LADDER STEPS SAFETY HANDLES PAIR 1 6 2 33...
Страница 34: ...90 GREEN BRACKET SPRING CLAMP 4 6 GLIDER SWING 1 PICTURE DESCRIPTION QTY 34...
Страница 36: ...1 1 2 TIC TAC TOE PANEL UNASSEMBLED CHIMNEY UNASSEMBLED DORMER FLAG KIT 2 PICTURE DESCRIPTION QTY 36...
Страница 118: ...1 ASSEMBLE AND INSTALL THE CHIMNEY AND DORMERS USING THE INSTRUCTIONS PROVIDED STEP 82 CHIMNEYAND DORMERS 118...