1. PRE-DRILL TWENTY 5/4 X 3 X 16" BRIDGE RAIL SLATS ON EACH END WITH A 1/8" DRILL BIT. (SEE TOP IMAGE BELOW)
2. PLACE THE BRIDGE RAIL SLATS 3" FROM THE FACE OF THE CORNER POSTS, AND ATTACH WITH 2" WOOD SCREWS.
THE SLATS WILL MOUNT ON THE OUTSIDE OF THE BRIDGE RAILS.
3. ATTACH THE REMAINING SLATS TO THE UNIT WITH 3" SPACING BETWEEN THE SLATS.
STEP 15: BRIDGE RAIL SLATS
SLAT
5/4 X 3 X 16"
BRIDGE RAIL
2" WOOD SCREW
5/4 X 3 X 16"
BRIDGE RAIL SLAT
3
4
"
"
1 16
5
5
16 "
"
4
1
1 3
1
2X
1
8 "
LEFT SIDE VIEW
3" SPACE OFF CORNER POST
3" SLAT SPACING
154
Содержание 1500IWR
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 52: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 1 1 PICTURE DESCRIPTION QTY 44 ...
Страница 59: ...PICTURE DESCRIPTION QTY SAFETY HANDLE 2 HANDLES ARE IN ONE BAG 07 0005 6 2 96 CHAIN SECTION 51 ...
Страница 147: ...PART II CLATTER BRIDGE 139 ...
Страница 176: ...APPENDIX 168 ...