STEP 47: REST SWING BEAM ON FORT
1: REST THE SWING BEAM ASSEMBLY ON TOP OF THE UPPER RAILING BOARDS OF THE
FORT.
2: THE END OF THE SWING BEAM WITH 2 HOLES SHOULD OVERHANG THE SWING BEAM
SIDE OF THE FORT. IN THE NEXT STEP YOU WILL ATTACH THE SWING BEAM LEGS ONTO THIS
END OF THE SWING BEAM.
END WITH 2 HOLES
SWING BEAM WITH IRON DUCTILE SWING HANGERS ATTACHED
SWING BEAM SIDE OF FORT
99
Содержание 1500IWR
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 52: ...WAVE SLIDE 03 0013 RAD RIDE SLIDE 03 0002 1 1 PICTURE DESCRIPTION QTY 44 ...
Страница 59: ...PICTURE DESCRIPTION QTY SAFETY HANDLE 2 HANDLES ARE IN ONE BAG 07 0005 6 2 96 CHAIN SECTION 51 ...
Страница 147: ...PART II CLATTER BRIDGE 139 ...
Страница 176: ...APPENDIX 168 ...