TABLE OF CONTENTS
Safety Guidelines……………………………………….......……...........................Pages 4-7
Leveling Fort, General Information and Definitions…………………...................Pages 7-9
How to Install T-nuts, Board Identification, Predrill Lag Screw Directions and
Swing Beam Loading......................................................................................Pages 10-14
Site Plan, Required Tool List and Kit Contents...............................................Pages 15-16
Hardware, Lumber and Accessory Checklists.………………………………....Pages 17-44
Adding T-Nuts to Lower Level Corner Posts....…………………..………...…........... Step 1
Framing Lower Level Fort……………………..…………………………..……..... Steps 2-11
Mounting Deck…………………………....……………….…………...…................... Step 12
Rock Wall Assembly/Installation…………………...…..……..……...….…….... Steps 13-17
Ladder Assembly/Installation………………..……........................................... Steps 18-19
Rope Ladder Assembly/Installation…………………………….....…….........…....... Step 20
Adding T-Nuts to Upper Level Corner Posts......................................................... Step 21
Framing Upper Level Deck............................................................................. Steps 22-33
Mounting Upper Level Deck........................................................................... Steps 34-39
Assembling and attaching Rad Ride Tube Slide................................................... Step 40
Rear Bottom Panel Board, Center Post, Rear Posts...................................... Steps 41-43
Upper Level Steps................................................................................................. Step 44
Lower Level Panel Slats and Upper Level Panel Slats.................................... Step 45-46
Swing Beam Assembly…………….……………………..……........….............. Steps 47-54
Wood Roof Assemblies...................................…….....………………….…..… Steps 55-65
Hanging Swings and Safety Boards…………………………………………….. Steps 66-67
Picnic Table Assembly and Installation..…………………………......….…....... Steps 68-70
Sandbox Seats/Name Plate.................................................................................. Step 71
Tic Tac Toe Assembly/Installation………………………………..……............... Steps 72-73
2
Содержание 1500GWF
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 41: ...5 4 X 6 X 10 ROOF PEAK SUPPORT 125 6 1000 RPS 2 PICTURE DESCRIPTION QTY 30 ...
Страница 143: ...APPENDIX 132 ...
Страница 145: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 146: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 147: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...