STEP 47: SWING BEAM PLATE
1: PLACE THE SWING BEAM PLATE ON TOP OF THE SWING BEAM MOUNT, LINING UP THE PILOT HOLES.
2: FASTEN THE SWING BEAM PLATE TO THE SWING BEAM MOUNT USING 3-1/2" CARRIAGE BOLTS ON TOP, AND 3/8"
LOCK NUTS WITH 3/8" WASHERS FROM UNDERNEATH, IN THE COUNTER-SUNK HOLES OF THE SWING BEAM MOUNT.
USE BOLT CAPS TO COVER ANY EXPOSED THREADS.
3: LEAVE THE MIDDLE HOLE EMPTY, IT WILL BE USED LATER.
4: IF NECESSARY USE LOCKING PLIERS TO HOLD CARRIAGE BOLTS IN PLACE WHEN INSTALLING.
3/8" WASHER
3/8" LOCK NUT
BOLT CAP
BOLT
3/8" X 3-1/2"
CARRIAGE
SWING BEAM PLATE
91
Содержание 1500GWF
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 41: ...5 4 X 6 X 10 ROOF PEAK SUPPORT 125 6 1000 RPS 2 PICTURE DESCRIPTION QTY 30 ...
Страница 143: ...APPENDIX 132 ...
Страница 145: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 146: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 147: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...