STEP 17: CLIMBING RAMP
1: PLACE ONE 2 X 6 X 95-1/2" FLOOR BOARD AGAINST EACH OF THE RAMP SIDE BOARDS. FASTEN THE FLOOR
BOARDS TO THE RAMP SUPPORT BOARDS WITH TWO 2-1/2" WOOD SCREWS PER SUPPORT. THE BOARDS SHOULD BE
FLUSH AT THE SQUARE END OF THE RAMP SIDES.
2: PLACE THE 2 X 4 X 95-1/2" MIDDLE FLOOR BOARD ON THE CENTER OF THE RAMP. FASTEN THE FLOOR BOARD TO
THE RAMP SUPPORT BOARDS WITH TWO 2-1/2" WOOD SCREWS PER RAMP SUPPORT.
3: ABOVE EACH OF THE RAMP SUPPORTS PLACE ONE 2-1/2" WOOD SCREW THROUGH THE RAMP SIDE BOARDS
INTO THE 2 X 6 FLOOR BOARDS. BETWEEN EACH RAMP SUPPORT, INSTALL TWO MORE 2-1/2" WOOD SCREWS
THROUGH THE RAMP SIDE INTO THE FLOOR BOARD.
2-1/2"
WOOD SCREW
PLACE ONE 2-1/2" WOOD
SCREW ABOVE EACH OF THE
THREE RAMP SUPPORTS INTO
THE 2 X 6 FLOOR BOARDS.
NOW GO BACK AND ADD
2-1/2" SCREWS TO THE HOLES
BETWEEN THESE THREE HOLES.
2 X 6 X 95-1/2"
FLOOR BOARD
FLUSH
2 X 4 X 95-1/2"
MIDDLE FLOOR BOARD
NOTE SCREW HOLES SHOULD BE
APPROXIMATELY CENTERED OVER THE
RAMP SUPPORTS
55
Содержание 1500BWF
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 44: ...DESCRIPTION PICTURE QTY PAIR CLIP 07 0005 SPRING 11 5013 BRACKET GREEN 11 4003 4 9 90 SAFETY HANDLE 2pr 33 ...
Страница 45: ...09 1014 2 CHIMNEY 1530 BOX 1530 BOX 1 DORMER UNASSEMBLED UNASSEMBLED FLAG KIT 2 DESCRIPTION PICTURE QTY 34 ...
Страница 117: ...APPENDIX 106 ...
Страница 119: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...
Страница 120: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...
Страница 121: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...
Страница 158: ...7 ...