background image

2

07-0016-P

(PAIR)

07-0028-G

STAKE

04-0014

PLASTIC 

SUNBURST

1

TIC TAC TOE

TIRE SWING 

SWIVEL

11-4010

07-0010

(UNASSEMBLED)

07-0004

1

1

STEERING WHEEL

GROUND 

TIRE SWING 

W/CHAINS

1

2

PLASTIC 

DORMER 

SUNBURST

07-0031

1

PR

PICTURE

DESCRIPTION

QTY.

35

Содержание 1500BWF

Страница 1: ...0114 www gorillaplaysets com Frontier Treehouse with Fort Add On Model 1500BWF BOXES 1501 1503N 1510 1511 1523 1530 1525 1531 Tire Swing Box Slide Box Amber Post Option BOXES 1520 2bx 1522 1524 Timber Shield Post Option BOXES W 1 TSB 120 playsets playsets 51 0067 W 51 0067 W playsets playsets ...

Страница 2: ... Add On Kit Wood Accessory and Hardware Lists These lists for the Treehouse Add On Kit are in the Appendix at the end of your play set instruction manual or they are included with this sheet Steps to complete the Treehouse Add On Kit The instruction steps for the Treehouse Add On Kit are in the Appendix at the end of your play set instruction manual or they are included with this sheet If you are ...

Страница 3: ...hat are missing or damaged is to use our Quick Response Center located at www gorillaplaysets com support DO NOT RETURN THIS PRODUCT TO THE RETAILER OR CONTACT THE RETAILER DIRECTLY THE RETAILER DOES NOT STOCK COMPONENTS PLEASE RETAIN ALL INSTRUCTIONS FOR FUTURE REFERENCE KEEP THEM IN A SAFE PLACE WHERE YOU CAN REFER TO THEM AS NEEDED CHECK FOR REVISED INSTRUC TIONS AT www gorillaplaysets com manu...

Страница 4: ...nstructions for proper maintenance can be found on Gorilla s website Imperfections or conditions that develop because of a failure to properly maintain the swing set are not covered by this warranty Gorilla will at its discretion replace any above ground part within the stated warranty period that is defective in workmanship or materials This decision is subject to verification of the defect which...

Страница 5: ...ts and screw heads should be checked regularly for tightness The ground ladder rope ladder slide swings and other areas where children spend a majority of their playtime should be checked more frequently Gorilla shall not be liable for incidental indirect or consequential damages or injuries that result from building and or playing on our play sets Adult supervision is recommended anytime a play s...

Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...

Страница 7: ..._________ Address __________________________________________________________________________________________________ Comments ________________________________________________________________________________________________ ____________________________________________________________________________________________________________ ____________________________________________________________________...

Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...

Страница 9: ...ain sealant is available online here http www gorillaplaysets com Playground Sealant p 10 0003 htm Oil based stain or water based stain may be used Should you choose to use other stain we suggest asking the product covering specialists at any number of specialty paint stores or home improvement centers for a product that would work best for your local environment TIP while the set is new take a sm...

Страница 10: ... manuals html Click on your specific model http www gorillaplaysets com Warranty s 82 htm NOTE Your children s safety is our 1 concern Observing the following statements and warnings reduces the likelihood of serious injury Please review these safety rules regularly with your children WARNING Children must NOT use this play set until it has been completely assembled and inspected by an adult to en...

Страница 11: ...st read the 1525 Treehouse kit instructions in the appendix and the 1531 Fort Add On kit instructions packet BEFORE you construct the playset The 1525 and 1531 instructions will tell you how to deviate from the main manual Model 1500AWF with Fort Add On is shown on this page Your set may look different but the Fort Add On kit and the Treehouse kit are installed in the same locations ...

Страница 12: ...0 Tire Swing Box Slide Box 1525 only included with 1500BWF Treehouse model REV 9 17 2015 Amber Post Option BOXES 1520 2bx 1522 1524 Timber Shield Post Option BOXES W 1 TSB 120 Model 1500BW shown See cover of manual for the image of your model when it is completed ...

Страница 13: ... 16 19 Angle Supports Center Post and Panel Slat Installation Steps 20 22 Swing Beam Assembly Steps 23 30 Roof Assembly Steps 31 34 Hanging Swings Safety Board Steps 35 36 Picnic Table Assembly and Installation Steps 37 39 Tire Swing Assembly and Installation Steps 40 47 Rope Ladder Assembly and Installation Step 48 Slide Telescope Steps 49 50 Tic Tac Toe Assembly and Installation Steps 51 52 Safe...

Страница 14: ... children to never run up a slide as this increases their chances of falling The parents should have the children dress appropriately with well fitting shoes Loose clothing such as scarves and ponchos should not be worn Always take off tie up or tuck in cords and drawstrings on children s clothing These things can get caught on playground equipment and strangle a child Teach children not to climb ...

Страница 15: ...f excessive wear is found Contact us for warranted replacement parts Swing chains rings ropes etcetera should always be fastened to a rotating swing hanger NEVER attach a chain ring rope etcetera to a stationary hanger such as but not limited to an eye bolt Severe wear could occur leading to an injury For rusted areas on metallic members such as monkey bars hand supports brackets etc sand and repa...

Страница 16: ...loose fill surfacing materials are acceptable Surfacing materials are acceptable such as the types and depths shown in the table Fall Heights and Materials Type Of Material 6 in depth 9 in depth 12 in depth Double Shredded bark mulch 6 Fall Height 10 Fall Height 11 Fall Height Wood Chips 6 Fall Height 7 Fall Height 12 Fall Height Fine Sand 5 Fall Height 5 Fall Height 9 Fall Height Shredded Tires 1...

Страница 17: ...ore the ground around the outside edges of the sandbox boards on the high side of the fort This is the area that will be dug in Make sure to score deep enough the scored lines will be your digging template Push the frame off and away from the scored area far enough to dig and remove dirt to reach the appropriate depth Dig a channel along the scored line s for the base of the fort corner post and s...

Страница 18: ... parts that are structurally defective We use a high quality lumber in our structures however you should inspect each part for splinters or rough spots and sand them smooth to prevent injury After familiarizing yourself with all of the components read all instructions thoroughly Reading instructions after you have studied the parts will help you understand the installation process and help to elim...

Страница 19: ...ts EXAMPLE OF OFFSET HOLES UP EXAMPLE OF OFFSET HOLES DOWN Counter sunk holes Many of the parts that will be used have counter sunk holes A counter sunk hole is one that surrounds one side of a through hole but does not extend through the wood it s self When using a counter sunk hole the bolt will be inserted through the through hole and either the head of the bolt and washer or nut and washer wil...

Страница 20: ...T nut until the face of the T nut is flush to the wood This picture shows the T nut inserted and installed flush to the wood This picture shows an end view of the T nut installed flush to the wood WARNING DO NOT EMBED THE TOP OF THE T NUT INTO THE FACE OF THE WOOD Cross Section end view you are looking at an X ray view of the post and T nut The barrel of the T nut is in the corner post the line is...

Страница 21: ...IRST STEP IN OUR ASSEMBLY INSTRUCTIONS IS TO INSERT T NUTS INTO THE CORNER POSTS A T NUT IS A FASTENER WHICH IS THREADED ON THE INSIDE AND IT FUNCTIONS JUST LIKE A STANDARD HEX NUT YOU INSERT THE T NUTS INTO THE PREDRILLED HOLES IN THE CORNER POSTS THE T NUT HAS A BARREL SHAPED END WHICH GOES INTO THE HOLE IN THE CORNER POST THE T NUT ALSO HAS AN FLANGE SHAPED END WITH TEETH THE TEETH PENETRATE IN...

Страница 22: ...art to fit into a certain area of the play set B We need the designation to be simple The 3600 is the length of the board It means the board is 36 inches long If the code were 3625 then the board is 36 1 4 in length The BPB abbreviation stands for Bottom Panel Board The wood part bill of materials in the instructions has a description which will match the abbreviation closely In the event that the...

Страница 23: ...e 2 x 4 board installation shown below Place the board into position Spot Drill through the holes in the 2 x 4 board into the corner posts with an 11 64 drill bit Remove the 2 x 4 board Continue Example 3 8 diameter x 5 lag screw This would be like the 4 x 4 board installation shown below Place the LAG SCREW DIAMETER DRILL BIT SIZE 5 16 DIAMETER 9 64 3 8 DIAMETER 11 64 Pre drilling holes for lag s...

Страница 24: ...ar is 125 lbs Maximum Allowable swinging weight for a three position swing 1 The maximum allowable swinging weight at each Swing Belt position is 150 lbs 2 The maximum allowable swinging weight at the Trapeze position is 125 lbs 3 The MAXIMUM SWING BEAM LOAD IS 425 lbs SWINGING WEIGHT TRAPEZE BAR REV A 8 29 2012 125 LBS MAX 150 LBS MAX SWINGING WEIGHT 150 LBS MAX SWINGING WEIGHT SWING BELT SWING B...

Страница 25: ...onents and general construction process of your new playset before getting started SITE PLAN Playset height 11 feet 2 inches Swing Beam height 7 feet 7 1 2 inches Deck height 5 feet Approximate assembly time 8 10 hours 6 foot unobstructed safety perimeter around playset recommended Trapeze Arm 1 Wave Slide Ramp Swing Belts 2 Rock Wall Rope Ladder Tire Swing 14 ...

Страница 26: ...se Grips ___ Shovel ___ Tape or Marker See step 48 KIT CONTENTS Swings Slides Accessories ___ Qty Description ___ 2 Swingbelts w Chains ___ 1 Trapeze Swing w Chains ___ 1 Wave Slide ___ 10 Rock Wall Grips assorted colors ___ 1 Telescope ___ 4 Safety Handles ___ 2 Flag Kit ___ 2 Plastic Sunburst 07 0028 G ___ 1 Logo Plate ___ 1 Ground Stakes pair ___ 1 Tic Tac Toe ___ 1 Steering Wheel ___ 1 Tire Sw...

Страница 27: ... WASHER QTY 34 3 8 WASHER QTY 31 5 16 X 1 1 2 HEX BOLT QTY 8 5 16 X 4 1 2 HEX BOLT QTY 14 9 1 4 3 2 5 6 7 8 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES 14 X 1 1 4 PAN HEAD SCREW QTY 4 TORQUE WASHER QTY 17 8 X 2 1 2 WOOD SCREW QTY 52 5 16 TEE NUT QTY 22 8 X 2 WOOD SCREW QTY 189 16 ...

Страница 28: ...AN BE USED TO MATCH BOLT AND SCREW SIZES 5 16 X 3 1 2 3 8 x 9 CARRIAGE BOLT QTY 1 QTY 12 SCREW HEX LAG QTY 1 DRIVE BIT 2 SQUARE 1501 HARDWARE PAGE 2 OF 2 REV A 9 10 2014 JH 3 8 x 6 1 2 CARRIAGE BOLT QTY 2 3 8 x 3 1 2 CARRIAGE BOLT QTY 2 3 8 X 3 1 2 HEX LAG SCREW QTY 12 PLASTIC BOLT CAP QTY 19 3 8 x 7 CARRIAGE BOLT QTY 14 17 ...

Страница 29: ... 3 2 5 6 7 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES QTY 6 WOOD SCREW 8 X 1 1 4 5 16 WASHER QTY 6 1503N HARDWARE PAGE 1 OF 1 REV C 8 10 2015 JH 8 X 1 1 2 WOOD SCREW QTY 104 5 16 X 2 1 2 HEX BOLT QTY 2 5 16 TEE NUT QTY 6 18 ...

Страница 30: ... CAN BE USED TO MATCH BOLT AND SCREW SIZES 3 8 LOCK NUT QTY 4 1 2 WASHER QTY 2 3 8 WASHER QTY 17 TORQUE WASHER QTY 4 1510 HARDWARE PAGE 1 OF 1 REV B 8 19 2014 JH 5 16 PLASTIC BOLT CAP QTY 2 3 8 PLASTIC BOLT CAP QTY 4 3 8 x 7 CARRIAGE BOLT QTY 4 3 8 X 3 1 2 HEX LAG SCREW QTY 11 5 16 TEE NUT QTY 2 5 16 X 7 HEX BOLT QTY 2 19 ...

Страница 31: ...3 J H 5 16 WASHER QTY 26 8 X 2 WOOD SCREW QTY 20 9 1 4 3 2 5 6 7 8 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES 5 16 X 3 1 2 HEX LAG SCREW QTY 14 5 16 TEE NUT QTY 10 20 ...

Страница 32: ...5 16 X 2 1 2 QTY 6 QTY 10 5 16 18 x 5 8 L T NUT 8 X 3 1 2 QTY 4 WOOD SCREW HEX BOLT QTY 2 3 8 16 x 5 8 L T NUT QTY 4 LAG SCREW 5 16 X 2 1 2 2 1 2 L QTY 16 SQUARE DRIVE PAN HEAD SCREW 8 X 1 1 4 QTY 2 EYE BOLT QTY 2 3 8 WASHER QTY 10 5 16 WASHER 3 8 16 X 3 4 DIA I D X 5 16 X 1 1 2 HEX BOLT QTY 4 1523 HARDWARE PAGE 1 OF 1 9 10 2014 JH 8 X 2 1 2 WOOD SCREW QTY 124 21 ...

Страница 33: ...00 AS 2 X 4 X 18 ANGLE SUPPORT 2 4 1800 AS 2 X 4 X 14 BOTTOM PANEL BOARD 2 4 1400 BPB 2 X 4 X 14 3 4 PICNIC TABLE TOP SUPPORT 2 4 1475 PTTS 2 X 4 X 27 1 2 PICNIC TABLE SEAT SUPPORT 2 4 2750 PTSS 2 X 4 X 24 ROPE LADDER 2 4 2400 RLST 4 2 2 6 2 2 4 2856 CPFR STEP CENTER POST NOTE THIS ITEM WILL NOT BE USED FOR THIS PLAY SET 22 ...

Страница 34: ...ON CENTER 2 4 6600 RWS 2 1 LEFT 1 RIGHT 2 X 4 X 66 LADDER SIDE 2 4 6600 LLS 2 4 6600 LRS 2 X 4 X 58 SWING BEAM CROSS MEMBER 2 HOLES ON CENTER 2 4 5800 CM 1 2 X 4 X 47 1 2 SAFETY BOARD END PANEL BOARD 2 4 4750 SBEP 2 2 X 4 X 51 1 8 ROOF SUPPORT 1 HOLE OFFSET 2 4 5113 RSL 2 4 5113 RSR 2 LEFT 2 RIGHT NOTE THIS ITEM WILL NOT BE USED FOR THIS PLAY SET 23 ...

Страница 35: ... 2 X 6 X 70 BOTTOM PANEL SANDBOX BOARD 4 HOLES OFFSET 2 6 7000 SB 2 2 X 6 X 70 FRONT FACE BOARD 4 HOLES OFFSET 2 6 7000 FFB 1 1 2 X 6 X 47 1 2 TOP PANEL BOARD 2 6 4750 TPB 2 X 4 X 70 REAR TOP PANEL BOARD 2 HOLES OFFSET 1 CENTERED 2 4 7000 RTPB 1 1 2 X 6 X 102 ROPE LADDER SUPPORT FRONT RIGHT 2 6 10200 RLSFR PICTURE DESCRIPTION QTY 24 ...

Страница 36: ...4 4750 SBM 1 2 5 4 X 2 5 8 X 13 1 4 PICNIC TABLE SLAT 125 3 1325 PTS 5 4 X 2 5 8 X 17 1 2 TIC TAC TOE MOUNT 125 3 1750 TTTM 2 5 4 X 3 X 23 7 8 ROCK WALL CAP 125 3 2387 RWC 1 5 4 X 2 5 8 X 28 1 4 PANEL SLAT 125 3 2825 PS 24 1 5 4 X 3 X 18 3 4 LADDER BACK 125 3 1875 LB NOTE THIS ITEM WILL NOT BE USED FOR THIS PLAY SET 25 ...

Страница 37: ...OOF PEAK SUPPORT 125 6 1000 RPS 5 4 X 6 X 22 SANDBOX SEAT 125 6 2200 SS 2 4 5 4 X 6 X 43 PICNIC TABLE TOP AND SEATS 125 6 4300 PTTS 11 5 4 X 6 X 23 7 8 ROCK WALL BOARD 125 6 2387 RWB 1 5 4 X 6 X 23 7 8 BOTTOM ROCK WALL BOARD 125 6 2387 BRW 5 4 X 6 X 47 3 8 DECK BOARD 125 6 4737 DB 11 26 ...

Страница 38: ...LY ROOF STARTER 1 4 4750 RS 2 1 X 4 X 47 1 2 TONGUE ONLY ROOF FINISHER 1 4 4750 RF 1 X 5 X 47 1 2 TONGUE GROOVE ROOF BOARD 1 5 4750 RB 22 1 2 X 4 X 47 1 2 TIRE SWING CROSS MEMBER 2 4 4750 CM 4 X 4 X 72 TIRE SWING LEG 4 4 7200 AFL 2 PICTURE DESCRIPTION QTY 27 ...

Страница 39: ...EFERRED TO AS PLASTIC COATED WILL BE AMBER STAINED WOOD FOR THE SOLID CEDAR WOOD OPTION 4 X 6 X 108 PLASTIC COATED TIRE SWING BEAM 1 4 X 4 X 96 PLASTIC COATED CORNER POST 4 4 X 4 X 108 PLASTIC COATED SWING LEG 2 4 X 6 X 120 PLASTIC COATED SWING BEAM 1 28 ...

Страница 40: ...BOARD ROPE MOUNT 2 4 4 0800 RM 2 4 X 4 X 8 7 3 2 4 3300 RP 2 2 1600 FS 2 4 1800 RPB 4 2 X 4 X 18 3 4 RAMP SUPPORT RAMP POST BRACE 2 2 4 1875 RS 2 X 4 X 18 2 4 9550 MFB 2 X 2 X 16 RAMP FLOOR SUPPORT 2 X 4 X 95 1 2 2 X 4 X 96 SIDE BOARD 2 4 9600 SB DESCRIPTION QTY PICTURE 1523 29 ...

Страница 41: ...2 04 0006 1 1 SLIDE W CHAINS 04 0002 BAR 13 3 ROPE LADDER ROPE WIKI WAVE 1 10 ROCK WALL ROPE 12 or 13 RAMP HANDRAIL ROPES TRAPEZE SWING W CHAINS 2 PICTURE DESCRIPTION QTY 30 ...

Страница 42: ...IPTION PICTURE QTY ROCK 5 ROCKS ARE IN ONE 11 5002 1 PLATE rocks 2 10 EA 1 SWING BAG 07 0008 CLIMBING A FRAME SWING LEG BRACKET 11 5010 HARDWARE BOXES 1501 1503N 1523 1510 1511 HARDWARE BOXES INSTRUCTIONS 31 ...

Страница 43: ...MANUFACTURER 2 NOT SHOWN LOGO PLATE TELESCOPE 11 4012 HANGER 07 0001 6 1 IRON DUCTILE SWING BRACKET 28 0001 DESCRIPTION PICTURE QTY 1 32 ...

Страница 44: ...DESCRIPTION PICTURE QTY PAIR CLIP 07 0005 SPRING 11 5013 BRACKET GREEN 11 4003 4 9 90 SAFETY HANDLE 2pr 33 ...

Страница 45: ...09 1014 2 CHIMNEY 1530 BOX 1530 BOX 1 DORMER UNASSEMBLED UNASSEMBLED FLAG KIT 2 DESCRIPTION PICTURE QTY 34 ...

Страница 46: ...7 0028 G STAKE 04 0014 PLASTIC SUNBURST 1 TIC TAC TOE TIRE SWING SWIVEL 11 4010 07 0010 UNASSEMBLED 07 0004 1 1 STEERING WHEEL GROUND TIRE SWING W CHAINS 1 2 PLASTIC DORMER SUNBURST 07 0031 1PR PICTURE DESCRIPTION QTY 35 ...

Страница 47: ...AND THEN RE ASSEMBLE TO MAKE YOUR CORRECTIONS 2 MAKE SURE HOLES ARE FREE OF ANY OBSTRUCTIONS USE A BOLT TO CLEAN OUT ANY DEBRIS 3 LAY OUT EACH OF THE 4 X 4 X 96 CORNER POSTS IN THE AREA YOU INTEND ON BUILDING THE FORT SIDE OF THE PLAYSET 4 USE THE DIAGRAM BELOW TO CORRECTLY IDENTIFY AND ORIENT THE NECESSARY DIRECTION THE POSTS SHOULD FACE 5 USE A HAMMER TO SEAT THE T NUTS AFTER INSERTING THEM INTO...

Страница 48: ...RS TO ATTACH THE BOTTOM HOLES OF THE BOTTOM PANEL BOARD TO THE T NUTS INSTALLED ON THE CORNER POSTS THE TOP HOLES WILL BE USED LATER 5 LAY THE 2 X 6 X 47 1 2 TOP PANEL BOARD ON TOP OF THE RIGHT SIDE CORNER POSTS THE HOLES IN THE TOP PANEL BOARD MUST BE OFFSET DOWN 6 USE 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS TO ATTACH THE TOP HOLES OF THE TOP PANEL BOARD TO THE T NUTS INSTALLED ON THE CORNER POST...

Страница 49: ...ST BE OFFSET DOWN 5 USE 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS TO ATTACH THE BOTTOM HOLES OF THE BOTTOM PANEL BOARD TO THE T NUTS INSTALLED ON THE CORNER POSTS THE TOP HOLES WILL BE USED LATER 6 LAY THE 4 X 4 X 47 1 2 SWING BEAM SUPPORT ON TOP OF THE LEFT SIDE CORNER POSTS THE THREE COUNTER SUNK HOLES IN THE MIDDLE OF THE SWING BEAM SUPPORT MUST FACE DOWNWARD 7 FIND TWO TORQUE WASHERS PLACE A 6 1...

Страница 50: ...HOLES ON CENTER STEP 4 DECK SUPPORTS YOU WILL NEED AN EXTRA PERSON FOR THIS STEP 1 WITH HELP STAND UP THE LEFT AND RIGHT SIDE ASSEMBLIES 2 FASTEN THE 2 X 4 X 70 DECK SUPPORTS TO THE HOLES AT 54 3 4 WITH 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS FROM THE INSIDE OF THE FORT 39 ...

Страница 51: ...OLES IN THE FRONT FACE BOARD SHOULD BE OFFSET UP 4 USE 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS TO ATTACH THE TOP HOLES OF THE FRONT FACE BOARD TO THE T NUTS INSTALLED ON THE CORNER POSTS THE BOTTOM HOLES WILL BE USED LATER 5 PLACE THE 2 X 6 X 102 ROPE LADDER SUPPORT ON THE FRONT OF THE CORNER POSTS THE HOLES IN THE ROPE LADDER SUPPORT SHOULD BE OFFSET UP 6 USE 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHE...

Страница 52: ...UST BE OFFSET UP 4 USE 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS TO ATTACH THE TOP HOLES OF THE BOTTOM PANEL BOARD TO THE T NUTS INSTALLED ON THE CORNER POSTS THE BOTTOM HOLES WILL BE USED LATER 5 PLACE THE 2 X 4 X 70 REAR TOP PANEL BOARD NEAR THE TOP OF THE REAR CORNER POSTS THE HOLES IN THE TOP PANEL BOARD MUST BE OFFSET UP 6 USE 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS TO ATTACH THE HOLES OF THE T...

Страница 53: ...TALL THE LAG SCREWS THIS IS TO MAKE THE STRUCTURE RIDGID FOR THE LEVELING AND SQUARING PROCESS 2 PLACE THE FRAME IN ITS FINAL POSITION AND FOLLOW THE PROCEDURES AT THE FRONT OF THE MANUAL TO LEVEL AND SQUARE THE STRUCTURE HAVE AN ASSISTANT HELP YOUR LIFT THE FRAME AS REQUIRED DO NOT INSTALL REMAINING LAG SCREWS UNTIL AFTER THE FRAME HAS BEEN LEVELED AND SQUARED 3 ONCE THE FRAME IS LEVEL SQUARE AND...

Страница 54: ... 2 LAG SCREW 5 16 WASHER STEP 7 BOTTOM PANEL BOARDS 1 PLACE THE 2 X 4 X 47 1 2 END PANEL BOARD ON TOP OF THE 2 X 6 PANEL BOARD WITH OFFSET HOLES UP AND FASTEN TO THE CORNER POSTS WITH 5 16 X 3 1 2 LAG SCREWS WITH 5 16 WASHERS 2 PLACE THE 2 X 4 X 14 BOTTOM PANEL BOARD ON TOP OF THE 2 X 6 PANEL BOARD AND FASTEN TO THE CORNER POSTS WITH 5 16 X 3 1 2 LAG SCREWS WITH 5 16 WASHERS 43 ...

Страница 55: ...EEN THE FRONT FACE BOARD AND BOTTOM PANEL BOARD DO THE FOLLOWING 1 LOOSEN UP THE BOARDS ON THE LEFT AND RIGHT SIDES OF THE PLAY SET REMOVE THE SCREWS ON ONE SIDE OF EACH DECK SPACER 2 ALLOW THE DECK BOARDS TO DROP DOWN IN BETWEEN THE FRONT FACE BOARD AND BOTTOM PANEL BOARD 3 TIGHTEN UP THE BOARDS ON THE LEFT AND RIGHT SIDES OF THE PLAY SET 4 RE INSTALL THE SCREWS IN THE DECK SPACERS THEN INSTALL T...

Страница 56: ...CK SPACERS BOARD AND ONLY NEEDS TO BE DRILLED ONCE THIS HOLE IS TO ATTACH THE CENTER DECK SUPPORT TO THE DECK SPACER THE FOLLOWING STEP IS RECOMMENDED TO PREVENT POSSIBLE SPLITS IN THE WOOD 1 PRE DRILL THE ENDS OF THE 5 4 X 4 X 40 3 8 DECK SPACERS TO PREVENT INSTALLATION DAMAGE PRE DRILL 2 PLACE THE 5 4 X 4 X 40 3 8 DECK SPACER AT ONE END OF THE FORT CENTER THE BOARD BETWEEN THE CORNER POSTS AND A...

Страница 57: ...ER LINE 3 USE 2 WOOD SCREWS TO ATTACH THE DECK SPACERS TO THE CENTER DECK SUPPORT 4 CENTER THE 2 X 4 X 70 CENTER DECK SUPPORT ON THESE MARKS AND PUSH THE CENTER DECK SUPPORT FLUSH TO THE BOTTOM SIDE OF THE DECK BOARDS 5 USING TWO 2 1 2 WOOD SCREWS INSTALL THE 2 X 4 X 70 CENTER DECK SUPPORT THROUGH THE OUTSIDE OF THE 2 X 6 AND INTO THE END OF THE CENTER DECK SUPPORT REPEAT THIS STEP ON THE OPPOSITE...

Страница 58: ...THE SCREW HEAD SHOULD BE FLUSH TO THE TOP OF THE DECK BOARDS 5 4 X 6 X 47 3 8 2 WOOD SCREW LAY ALL DECK BOARDS ACROSS THE DECK SUPPORTS BEFORE SECURING THEM TO THE FORT THIS WILL ENSURE THAT YOU HAVE EQUAL SPACING ACROSS THE DECK STEP 10 DECK BOARDS THE FOLLOWING STEP IS RECOMMENDED TO PREVENT POSSIBLE SPLITS IN THE WOOD 1 PRE DRILL THE ENDS OF THE DECK BOARDS TO PREVENT INSTALLATION DAMAGE PRE DR...

Страница 59: ...TEP 11 ROCK WALL 1 FIND TWO 2 X 4 X 66 ROCK WALL SIDES 2 POSITION THE ROCK WALL SIDES SO THAT THE HOLES IN THE BOARDS ARE BOTH FACING THE SAME WAY 3 INSERT T NUTS INTO THE INSIDE OF THE ROCK WALL SIDES AND SET WITH A HAMMER T NUT 48 ...

Страница 60: ...STENING EACH BOARD WITH TWO 2 WOOD SCREWS ON EACH END 4 THE FINAL BOARD WILL BE THE BOTTOM ROCK WALL BOARD WITH ONE HOLE ATTACH WITH TWO 2 WOOD SCREWS PER SIDE 5 IN SOME CASES THERE WILL BE EXCESS LENGTH ON THE ROCK WALL SIDES THIS IS DUE TO MILLING VARIATIONS AND IS ALSO USED TO HELP LEVEL THE ROCK WALL SIDES ON UNEVEN GROUND 6 ROCK WALL SIDES MAY NOT BE EVEN WITH THE BOTTOM ROCK WALL BOARD DUE T...

Страница 61: ...L 1 FASTEN THE 90 GREEN BRACKET TO THE ROCK WALL SIDES WITH 5 16 X 1 1 2 HEX BOLTS AND 5 16 WASHERS 2 DO NOT FULLY TIGHTEN THE HEX BOLTS INTO THE T NUTS AT THIS TIME 5 16 WASHER GREEN BRACKET 90 5 16 X 1 1 2 HEX BOLT 50 ...

Страница 62: ...4 PAN HEAD SCREWS WITH WASHERS 2 MOUNT THE ROCKS IN A STAGGERED MANNER ON THE ROCK WALL BOARDS THREE PAN HEAD SCREWS AND WASHERS WILL SECURE EACH ROCK TO THE WALL NOTE THE IMAGE SHOWN BELOW IS A GENERIC ARRANGEMENT OF ROCKS ON THE ROCK WALL YOUR ACTUAL 3 PLACE THE 5 4 X 3 X 23 7 8 ROCK WALL TOP CAP ON TOP OF THE ROCK WALL SIDES FASTEN THE ROCK WALL TOP CAP TO THE ROCK WALL SIDES WITH 2 WOOD SCREWS...

Страница 63: ...ARD 2 GO UNDERNEATH THE DECK TO INSERT A T NUT INTO THE BACKSIDE OF THE 3 8 HOLES IN THE BOTTOM PANEL BOARD 3 ATTACH THE ROCK WALL WITH 5 16 X 1 1 2 BOLTS AND 5 16 WASHERS 4 WHEN THE BRACKETS ARE SECURE AND THE ROCK WALL IS IN ITS FINAL POSITION TIGHTEN THE 5 16 X 1 1 2 BOLTS ON THE ROCK WALL SIDES 5 16 X 1 1 2 5 16 WASHER HEX BOLTS INSERT T NUT BEHIND THE 2 X 6 ON BOTH SIDES RIGHT SIDE OF FORT 52...

Страница 64: ...SUPPORT BOARD AT THE SQUARE END OF THE 2 X 4 X 96 RAMP SIDE BOARDS OFFSET THE BOARD 1 FROM THE END FASTEN THE RAMP SUPPORT BOARD TO THE RAMP SIDE BOARDS WITH TWO 2 1 2 WOOD SCREWS PER SIDE 3 SECOND PLACE ONE 2 X 4 X 18 3 4 RAMP SUPPORT BOARD AT THE ROUND END OF THE 2 X 4 X 96 RAMP SIDE BOARDS OFFSET THE BOARD 4 FROM THE ROUND END FASTEN THE RAMP SUPPORT BOARD TO THE RAMP SIDE BOARDS WITH TWO 2 1 2...

Страница 65: ...SIDE ON A FIRM SURFACE THEN HAMMER IN THE 5 16 T NUTS REPEAT FOR THE OTHER 5 16 T NUT STEP 16A CLIMBING RAMP 1 PLACE THE RAMP SIDE ON A FIRM LEVEL SURFACE HAMMER A 5 16 T NUT INTO EACH HOLE ON THE INSIDE OF THE RAMP SIDE 2 REPEAT FOR THE OTHER RAMP SIDE 54 ...

Страница 66: ... 2 1 2 WOOD SCREWS PER RAMP SUPPORT 3 ABOVE EACH OF THE RAMP SUPPORTS PLACE ONE 2 1 2 WOOD SCREW THROUGH THE RAMP SIDE BOARDS INTO THE 2 X 6 FLOOR BOARDS BETWEEN EACH RAMP SUPPORT INSTALL TWO MORE 2 1 2 WOOD SCREWS THROUGH THE RAMP SIDE INTO THE FLOOR BOARD 2 1 2 WOOD SCREW PLACE ONE 2 1 2 WOOD SCREW ABOVE EACH OF THE THREE RAMP SUPPORTS INTO THE 2 X 6 FLOOR BOARDS NOW GO BACK AND ADD 2 1 2 SCREWS...

Страница 67: ...THAT DOES NOT HAVE THE COUNTERBORED HOLE 2 SCREW A 3 8 EYE BOLT WITH A WASHER INTO THE T NUT SO IT LOOKS LIKE THE BOTTOM PICTURE DO NOT TIGHTEN THE EYE BOLT SO TIGHTLY THAT IT CRACKS THE WOOD JUST SNUG IT UP 3 8 T NUT 3 8 EYE BOLT RAMP POST 3 8 WASHER 2 X 4 X 33 COUNTERBORED HOLE OUTSIDE FACE INSIDE FACE 56 ...

Страница 68: ...ND OF THE FLOOR SUPPORT BOARDS STEP 18 CLIMBING RAMP 1 ATTACH THE 2 X 2 X 16 FLOOR SUPPORT BOARDS TO THE FLOOR BOARDS WITH 2 1 2 WOOD SCREWS SEE DETAIL VIEW BELOW 2 FASTEN THE 90 GREEN BRACKET TO THE RAMP SIDES WITH 5 16 X 1 1 2 HEX BOLTS AND 5 16 WASHERS FLOOR SUPPORT BOARD 2 X 2 X 16 2 1 2 WOOD SCREW A 57 ...

Страница 69: ...S THE EYE BOLTS SHOULD BE ON THE OUTSIDE OF THE RAMP POSTS 2 SQUARE THE RAMP POST TO THE RAMP SIDE AND DRIVE IN TWO 2 1 2 WOOD SCREWS TO SECURE IT RAMP POST EYE BOLTS ON OUTSIDE OF RAMP POSTS RAMP SIDE A 5 16 X 2 1 2 5 16 WASHER SCALE 1 4 DETAIL A HEX BOLT 8 X 2 1 2 WOOD SCREWS RAMP POST RAMP SIDE 90 00 58 ...

Страница 70: ...AN HEAD SQUARE DRIVE SCREWS STEP 18B CLIMBING RAMP 1 FASTEN A BRACKET AS SHOWN UNDERNEATH THE RAMP TO THE RAMP POST AND THE RAMP SUPPORT 2 USE 8 X 1 1 4 PAN HEAD SQUARE DRIVE SCREWS TO ATTACH THE BRACKET 3 REPEAT FOR THE RAMP POST ON THE OTHER SIDE 59 ...

Страница 71: ...ST 4 ATTACH THE TOP OF THE RAMP POST SUPPORT TO THE RAMP POST WITH ONE 8 X 2 1 2 WOOD SCREW AND ONE 8 X 3 1 2 WOOD SCREW 5 ATTACH THE BOTTOM OF THE RAMP POST SUPPORT TO THE RAMP SIDE WITH FOUR 8 X 2 1 2 WOOD SCREWS 6 REPEAT SUBSTEPS 2 TO 5 FOR THE REMAINING RAMP POST SUPPORTS RAMP POST RAMP SIDE RAMP POST SUPPORT SUPPORT RAMP POST SUPPORT RAMP POST SUPPORT RAMP POST RAMP POST A 8 X 2 1 2 WOOD SCRE...

Страница 72: ...A T NUT INTO THE BACKSIDE OF THE 3 8 HOLES IN THE FRONT FACE BOARD 3 ATTACH THE CLIMBING RAMP WITH 5 16 X 1 1 2 HEX BOLTS AND 5 16 WASHERS 4 WHEN THE 90 BRACKETS ARE SECURE AND THE RAMP IS IN ITS FINAL POSITION TIGHTEN THE 5 16 X 1 1 2 BOLTS ON THE RAMP SIDES THE BACK SIDE OF HEX BOLT CENTER RAMP IN FRONT 5 16 WASHER IN THE HOLES ON RIGHT OPENING 5 16 X 1 1 2 THE FRONT FACE BOARD PLACE A T NUT ROC...

Страница 73: ...TTACH THE MOUNTS WITH 5 16 X 2 1 2 LAG SCREWS WITH WASHERS DO NOT OVER TIGHTEN 2 USE THE HOLES AS A GUIDE TO DRILL 3 8 DIAMETER HOLES THROUGH THE ROPE LADDER SUPPORT DRILL CAREFULLY SO YOU DO NOT SPLINTER THE WOOD AS THE DRILL BIT EXITS THE OTHER SIDE YOU MAY PLACE A SCRAP BLOCK OF WOOD ON THE BACK SIDE OF WHERE YOU ARE DRILLING TO PREVENT SPLINTERING BUT DO NOT PLACE YOUR HAND NEAR THE DRILLING A...

Страница 74: ...D BE ON THE GROUND IF THE RAMP IS ELEVATED OFF THE GROUND THEN YOU SHOULD PUT A SMALLER BLOCK UNDER THE END OF THE RAMP AND THEN RETIE THE ENDS NEAR THE ROPE MOUNTS 4 IF THERE IS ANY EXTRA LENGTH OF ROPE AT THE ROPE MOUNTS THEN TIE AN ADDITIONAL KNOT IN THE EXTRA LENGTH IF POSSIBLE SAFETY CHECK STAND ON THE END OF THE RAMP AT GROUND LEVEL WITH YOUR WEIGHT ON THE RAMP GRAB EACH ROPE AND ATTEMPT TO ...

Страница 75: ...H OR LOWER THAN THE TOP OF THE DECK SUPPORT 2 AT THE TOP USE 2 1 2 WOOD SCREWS THROUGH THE ANGLE SUPPORT INTO THE BOTTOM PANEL BOARD AT THE BOTTOM USE ONE 2 WOOD SCREW AND ONE 3 WOOD SCREW TO FASTEN THE ANGLE SUPPORT TO THE CORNER POST 3 FOUR 2 X 4 X 13 ANGLE SUPPORTS ARE MOUNTED UNDER THE DECK ON THE FRONT AND REAR OF THE PLAY SET TO THE 2 X 4 DECK SUPPORTS THE TOP OF THE ANGLE SUPPORT SHOULD BE ...

Страница 76: ...A T NUT INTO THE HOLE OF EACH 2 X 4 X 28 9 16 CENTER POST FRONT REAR 2 PLACE THE CENTER POSTS INSIDE THE RAILINGS AT THE FRONT AND REAR OF THE PLAYSET LINE UP THE HOLES IN THE CENTER POSTS WITH THE HOLES IN THE RAILINGS 3 FASTEN THE CENTER POSTS TO THE RAILINGS WITH 5 16 X 2 1 2 HEX BOLTS AND 5 16 WASHERS AT THE TOP 4 SQUARE EACH CENTER POST TO THE DECK AND SECURE THE BOTTOM OF THE CENTER POST TO ...

Страница 77: ...PRE DRILL THE SLATS 1 FROM EACH END ON CENTER WITH A 1 8 DRILL BIT 1 FIND TWENTY TWO 5 4 X 2 5 8 X 28 1 4 PANEL SLATS 3 INSTALL THE PANEL SLATS AT EQUAL LENGTHS SEE DETAIL BELOW FOR MEASUREMENTS ROCK WALL SIDE PANEL 4 ATTACH THE PANEL SLATS TO THE FORT WITH 2 WOOD SCREWS IN THE PRE DRILLED HOLES STEP 22 PANEL SLATS SWING BEAM PANEL SLAT DIMENSIONS VIEW FROM OUTSIDE THE PLAY SET 8 2 2 1 16 9 11 17 ...

Страница 78: ... HOLES 2 FASTEN THE SWING BEAM PLATE TO THE SWING BEAM SUPPORT USING 3 1 2 CARRIAGE BOLTS ON TOP AND 3 8 LOCK NUTS WITH 3 8 WASHERS FROM UNDERNEATH IN THE COUNTER SUNK HOLESOF THE SWING BEAM SUPPORT USE BOLT CAPS TO COVER ANY EXPOSED THREADS 3 LEAVE THE MIDDLE HOLE EMPTY IT WILL BE USED LATER 4 IF NECESSARY USE LOCKING PLIERS TO HOLE CARRIAGE BOLTS IN PLACE WHEN INSTALLING 67 ...

Страница 79: ...IS BOWED SLIGHTLY PLACE THE BOW SIDE UP THE SWING HANGERS WILL BE ON THE BOTTOM 2 FASTEN EACH SWING HANGER TO THE SWING BEAM USING 7 CARRIAGE BOLTS WITH TORQUE WASHERS AND 3 8 WASHERS WITH 3 8 LOCK NUTS 3 PLACE BOLT CAPS OVER EXPOSED THREADS L BOLT CAPS 7 CARRIAGE BOLT TORQUE WASHER 3 8 WASHER 3 8 LOCK NUT IRON DUCTILE SWING HANGER 68 ...

Страница 80: ...CH SWING LEGS TO BRACKET 2 FASTEN THE SWING LEGS TO THE SWING LEG BRACKET WITH 3 8 X 3 1 2 LAG SCREWS AND 3 8 WASHERS 1 PLACE THE 4 X 4 X 108 SWING LEGS FLUSH TO THE TOP OF THE SWING LEG BRACKET 4 X 4 X 108 SWING LEG SWING LEGS FLUSH TO TOP OF SWING LEG BRACKET 69 ...

Страница 81: ...OF THE SWING BEAM WITH TWO EMPTY HOLES SHOULD OVERHANG THE SIDE OF THE FORT WITH THE TRIANGULAR SWING BEAM PLATE 2 SIT THE SWING BEAM LEGS UPRIGHT UNDER THE TWO EMPTY HOLES IN THE END OF THE SWING BEAM THESE TWO HOLE LOCATIONS WILL BE EMPTY ON YOUR SWING BEAM LINE THEM UP WITH THE HOLES IN THE SWING LEG BRACKET UNDER THE SWING BEAM 70 ...

Страница 82: ... 3 8 LOCK NUTS WITH 3 8 WASHERS FROM UNDERNEATH 2 USE A 3 8 X 3 1 2 LAG SCREW WITH 3 8 WASHER FOR THE HOLE IN THE CENTER OF THE SWING BEAM BRACKET 3 PLACE A BOLT CAP OVER ANY EXPOSED THREADS STEP 27 MOUNT SWING BEAM TO SWING BEAM LEGS TORQUE WASHER 3 8 WASHER 3 8 LOCK NUT BOLT CAP 7 CARRIAGE BOLT 3 8 X 3 1 2 LAG SCREW 71 ...

Страница 83: ... FASTEN THE SWING BEAM TO THE SWING BEAM PLATE AND THE SWING BEAM SUPPORT USING A 9 CARRIAGE BOLT WITH A TORQUE WASHER AND A 3 8 LOCK NUT WITH A 3 8 WASHER ON THE BOTTOM PLACE GREEN BOLT CAPS OVER EXPOSED THREADS AFTER SECURING 4 FASTEN THE SWING BEAM TO THE SWING BEAM PLATE FROM UNDERNEATH WITH A 3 8 X 3 1 2 LAG SCREW AND 3 8 WASHER 5 IF NECESSARY USE VISE GRIPS TO HOLD CARRIAGE BOLTS IN PLACE WH...

Страница 84: ...EVEL STEP 29 LEVEL SWING BEAM IMPORTANT NOTE THE LEGS ARE DESIGNED TO ACCOMODATE SWING BEAMS ON UNEVEN GROUND DOWN SLOPE THE LEGS ARE LONGER THAN REQUIRED IF YOUR GROUND IS RELATIVELY LEVEL YOU MAY EITHER A DIG IN BOTH LEGS WHERE THEY MEET THE GROUND OR B BEND THE LEGS OUT SLIGHTLY TO MATCH YOUR GRADE IN OUT 73 ...

Страница 85: ...X 58 SWING LEG CROSS MEMBER AGAINST THE SWING BEAM LEGS 2 LEVEL CROSS MEMBER AND MARK THE LOCATION OF THE SECURING HOLES INSIDE THE CROSS MEMBER HOLES 3 USE 3 8 X 3 1 2 LAG SCREWS WITH 3 8 WASHERS TO SECURE THE CROSS MEMBER TO THE SWING BEAM LEGS STEP 30 SWING LEG CROSS MEMBER 74 ...

Страница 86: ... 51 1 8 ROOF SUPPORT RIGHT AND TWO 5 4 X 6 X 10 ROOF PEAK SUPPORT PIECES 2 FIND A FLAT SURFACE TO WORK ON LAY THE ROOF SUPPORTS DOWN ON THE FLAT SURFACE WITH THE COUNTERSUNK HOLES FACING UP ALIGN THE ANGLED ENDS OF THE ROOF SUPPORTS FLUSH WITH ONE ANOTHER PLACE A ROOF PEAK SUPPORT ON TOP OF THE ROOF SUPPORTS AS SHOWN THE EDGES SHOULD BE FLUSH WHERE SHOWN BELOW 3 USE FOUR 8 X 2 WOOD SCREWS TO ATTAC...

Страница 87: ...A INSTALLING ROOF SUPPORT ASSEMBLIES 1 PLACE THE ROOF SUPPORT ASSEMBLIES ON TOP OF THE DECK OF THE PLAY SET CLIMB ONTO THE DECK TO INSTALL THE ROOF SUPPORT ASSEMBLIES 2 ATTACH THE ROOF SUPPORT ASSEMBLIES TO THE CORNER POSTS WITH 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS 76 ...

Страница 88: ... BOARDS OVERLAPPING 2 FASTEN THE ROOF STARTER BOARDS TO THE ROOF SUPPORTS WITH 8 X 1 1 2 WOOD SCREWS MEASURE DIM A ACROSS THE BOTTOM OF THE ROOF SUPPORTS NEAR THE CORNER POSTS WHEN ATTACHING THE ROOF STARTERS DIM B AT THE ROOF PEAK SHOULD MATCH DIM A THIS WILL MAKE THE ROOF SUPPORTS PARALLEL TO EACH OTHER DUE TO WOOD MILLING VARIATIONS YOUR HOLES IN THE ROOF STARTERS WILL EITHER BE CENTERED ON THE...

Страница 89: ...47 1 2 ROOF PEAK 8 X 1 1 4 WOOD SCREW STEP 33 ROOF PEAK 1 PLACE THE 47 1 2 ROOF PEAK ON TOP OF THE ROOF STARTER BOARDS 2 FASTEN THE ROOF PEAK TO THE ROOF STARTER BOARDS WITH 8 X 1 1 4 WOOD SCREWS 78 ...

Страница 90: ...OF BOARDS ON TOP OF THE ROOF SUPPORTS FITTING THE TONGUE END INTO THE GROOVE END OF THE ROOF STARTERS EACH SIDE OF THE ROOF GETS 11 ROOF BOARDS 2 FASTEN THE ROOF BOARDS TO THE ROOF SUPPORTS WITH 1 1 2 WOOD SCREWS 3 FIT THE TONGUE END OF THE 1 X 4 X 47 1 2 ROOF FINISHER INTO THE GROOVE END OF THE LAST ROOF BOARD FASTEN IT TO THE ROOF SUPPORT WITH FOUR 1 1 2 WOOD SCREWS TIP INSTALL FOUR ROOF BOARDS ...

Страница 91: ...ING CLIP SWING CHAIN STEP 35 HANGING THE SWINGS 1 START BY ATTACHING ONE SPRING CLIP TO EACH IRON DUCTILE ON THE SWING BEAM 2 ATTACH ONE CHAIN PER ACCESSORY TO EACH SPRING CLIP 3 ADJUST HEIGHT AS NEEDED 80 ...

Страница 92: ...M THE BOTTOM OF THE CORNER POSTS ON THE LEFT SIDE OF THE FORT MARK THESE POSITIONS ON THE OUTSIDE OF THE CORNER POSTS ATTACH THE 2 X 4 X 47 1 2 SAFETY BOARD WITH OFFSET HOLES ON THE CORNER POSTS WITH 5 16 X 3 1 2 LAG SCREWS AND 5 16 WASHERS NOTE THE OFFSET HOLES CAN BE PLACED UP OR DOWN IN THIS STEP 81 ...

Страница 93: ...ER PLACE A 2 X 4 X 32 1 2 PT LEG ON TOP AT THE 7 1 2 DIMENSION THE TOP OF THE PT LEG SHOULD BE FLUSH TO THE TOP OF THE PT TOP SUPPORT ATTACH THE PT LEG TO THE SUPPORTS WITH 8 X 2 1 2 WOOD SCREWS 4 PLACE THE PICNIC TABLE SLAT NEXT TO THE PICNIC TABLE LEG FOR EACH ASSEMBLY BELOW LEAVE A 3 16 GAP BETWEEN THE TOP OF THE SLAT AND THE LEG USE THE 6 15 16 DIMENSION TO LOCATE THE BOTTOM END OF THE SLAT FA...

Страница 94: ...E MARK ON THE RIGHT FRONT CORNER POST ATTACH THE RIGHT SIDE ASSEMBLY TO THE INSIDE OF THE CORNER POST WITH 8 X 3 WOOD SCREWS 3 PLACE THE TOP OF THE LEFT SIDE ASSEMBLY FLUSH TO THE MARK ON THE RIGHT REAR CORNER POST ATTACH THE LEFT SIDE ASSEMBLY TO THE INSIDE OF THE CORNER POST WITH 8 X 3 WOOD SCREWS NOTE RAMP AND ROCK WALL REMOVED FOR CLARITY 26 3 8 LEFT SIDE ASSEMBLY LEG ON INSIDE RIGHT SIDE ASSE...

Страница 95: ... 6 X 43 PT TOP AND SEAT BOARDS 2 CENTER THE HOLES IN THE BOARDS OVER THE TOP OR SEAT SUPPORTS 3 FASTEN THE PT TOP AND SEAT BOARDS TO THE TOP OR SEAT SUPPORTS WITH 8 X 2 1 2 WOOD SCREWS 8 X 2 1 2 WOOD SCREWS 5 4 X 6 X 43 PT TOP SEAT BOARDS 84 ...

Страница 96: ... TO THE TOP OF THE SWING LEG BRACKET 2 FASTEN THE TIRE SWING LEGS TO THE SWING LEG BRACKET WITH 3 8 X 3 1 2 LAG SCREWS AND 3 8 WASHERS 3 8 WASHER LAG SCREW SWING LEG BRACKET 3 8 X 3 1 2 4 X 4 X 72 TIRE SWING LEG TIRE SWING LEGS FLUSH TO TOP OF SWING LEG BRACKET 85 ...

Страница 97: ...E BOLT 1 LINE UP THE HOLES OF THE TIRE SWIVEL WITH THE HOLES IN THE TIRE SWING BEAM 2 FASTEN THE TIRE SWIVEL TO THE TIRE SWING BEAM USING 3 8 X 7 CARRIAGE BOLTS WITH TORQUE WASHERS AND 3 8 WASHERS WITH 3 8 LOCK NUTS 3 PLACE BOLT CAPS OVER EXPOSED THREADS STEP 41 TIRE SWING 86 ...

Страница 98: ...WASHERS ON TOP OF THE TIRE SWING BEAM AND 3 8 LOCK NUTS WITH 3 8 WASHERS FROM UNDERNEATH PLACE A BOLT CAP OVER ANY EXPOSED THREADS 2 USE A 3 8 X 3 1 2 LAG SCREW WITH 3 8 WASHER FOR THE HOLE IN THE CENTER OF THE SWING BEAM BRACKET 3 8 LOCK NUT BOLT CAP 7 CARRIAGE BOLT TORQUE WASHER 3 8 WASHER 3 8 X 3 1 2 LAG SCREW 87 ...

Страница 99: ...UR GRADE ALSO SEE STEP 48 AN EXTRA PERSON IS NEEDED FOR THIS STEP 1 SIT THE SWING BEAM LEGS UPRIGHT 2 TAKE THE ASSEMBLED TIRE SWING BEAM AND LEGS AND INSERT THE SWING BEAM INTO THE GAP BETWEEN THE BACK RIGHT CORNER POST AND THE PANEL SLAT PLACE A SMALL LEVEL ON TOP OF THE BEAM IN ORDER TO LEVEL CORRECTLY 3 WITH A 3 8 DRILL BIT USE THE PRE DRILLED HOLES IN THE END OF THE TIRE SWING BEAM AS A TEMPLA...

Страница 100: ...BEAM TO THE CORNER POST USING 5 16 X 7 HEX BOLTS WITH 5 16 AND 1 2 WASHERS THROUGH THE TIRE SWING BEAM AND CORNER POST INTO THE T NUTS 4 AFTER THE TIRE SWING BEAM HAS BEEN SECURED INSTALL THE 5 4 X 3 X 28 1 4 PANEL SLAT FLUSH TO THE SIDE OF THE TIRE SWING BEAM WITH 2 WOOD SCREWS 5 THE END OF THE 7 HEX BOLTS SHOULD NOT EXTEND PAST THE FLANGED SIDE OF THE T NUT IF IT DOES THEN PUT 5 16 BOLT CAPS OVE...

Страница 101: ...AM LEVEL STEP 45 LEVEL TIRE SWING BEAM IMPORTANT NOTE THE LEGS ARE DESIGNED TO ACCOMODATE SWING BEAMS ON UNEVEN GROUND DOWN SLOPE THEY ARE LONGER THAN REQUIRED IF YOUR GROUND IS RELATIVELY LEVEL YOU MAY NEED TO EITHER A DIG IN BOTH LEGS WHERE THEY MEET THE GROUND OR B BEND THE LEGS OUT SLIGHTLY TO MATCH YOUR GRADE 90 ...

Страница 102: ...TION THE 2 X 4 X 47 1 2 TIRE SWING LEG CROSS MEMBER AGAINST THE SWING LEGS 2 LEVEL THE TIRE SWING CROSS MEMBER AND MARK THE LOCATION OF THE SECURING HOLES INSIDE THE CROSS MEMBER HOLES ONTO THE SWING LEGS 3 USE 3 8 X 3 1 2 LAG SCREWS WITH 3 8 WASHERS TO SECURE THE TIRE SWING CROSS MEMBER TO THE SWING BEAM LEGS 91 ...

Страница 103: ...7 HANGING THE TIRE SWING 1 START BY ATTACHING THREE SPRING CLIPS TO THE TIRE SWIVEL ON THE SWING BEAM 2 ATTACH ONE CHAIN AT A TIME TO ONE SPRING CLIP 3 ADJUST HEIGHT AS NEEDED SPRING CLIP TIRE SWING CHAIN 92 ...

Страница 104: ...OPE THROUGH THE HOLES IN THE ROPE LADDER RUNNER AND TIE THEM OFF GRAB EACH ROPE AND ATTEMPT TO WRAP IT AROUND YOUR HAND IF THE ROPE WRAPS AROUND YOUR HAND IT IS TOO LOOSE IF THE ROPE IS TOO LOOSE UNTIE THE KNOT BEHIND THE ROPE LADDER RUNNER AND RETIE IT UNTIL YOU CAN NO LONGER WRAP THE ROPE AROUND YOUR HAND ROPE LADDER RUNNER LADDER SUPPORT AND TIE 3 KNOTS THE BOTTOM OF EACH 2 MEASURE DOWN 6 BELOW...

Страница 105: ...ACE THE SLIDE IN THE OPENING AT THE FRONT LEFT OF THE FORT LAY THE SLIDE ON THE DECK WITH THE LIP EXTENDING ONTO THE DECK 2 PREDRILL 1 8 HOLES INTO THE DECK BOARDS AT THE SCREW LOCATIONS 3 ATTACH THE SLIDE TO THE DECK BOARDS WITH 1 1 4 PAN HEAD SCREWS DO NOT OVERTIGHTEN 94 ...

Страница 106: ... BAG FASTEN ONE OF THE SQUARE TELESCOPE BRACKETS TO THE FRONT TOP PANEL BOARD ON THE SLIDE SIDE OF THE CENTER POST 2 PLACE THE TELESCOPE STAND AND TELESCOPE INTO THE SLOT OF THE TELESCOPE BRACKET 3 FASTEN THE REMAINING TELESCOPE BRACKET TO THE OPPOSITE SIDE THAT THE FIRST TELESCOPE BRACKET WAS INSTALLED ON WITH 1 1 4 WOOD SCREWS PROVIDED WITH THE TELESCOPE 95 ...

Страница 107: ... 3 LOCATE TWO 5 4 X 3 X 17 1 2 TIC TAC TOE MOUNTS 4 USE THE SCREWS INCLUDED WITH THE TIC TAC TOE TO ATTACH THE GREEN BRACKETS TO THE TIC TAC TOE MOUNTS EACH GREEN BRACKET SHOULD BE CENTERED OVER THE TIC TAC TOE MOUNT TIC TAC TOE MOUNT GREEN BRACKET GREEN BRACKET 5 4 X 3 X 17 1 2 TIC TAC TOE MOUNT 5 4 X 3 X 17 1 2 TIC TAC TOE AFTER ASSEMBLING 96 ...

Страница 108: ... ATTACH THE TIC TAC TOE MOUNTS TO THE PANEL SLATS WITH 8 X 1 3 4 WOOD SCREWS 1 PLACE THE TIC TAC TOE AGAINST THE PANEL SLATS AT THE LEFT SIDE OF THE PLAY SET ON THE STEP 52 TIC TAC TOE INSTALLATION SWING BEAM TIC TAC TOE WITH BOARDS ATTACHED 8 X 1 3 4 WOOD SCREWS 4 00 97 ...

Страница 109: ... BAG 2 ADJUST THE SAFETY HANDLES UP OR DOWN TO SUIT THE NEEDS OF YOUR CHILD 3 ATTACH EACH SAFETY HANDLE TO THE PANEL SLATS WITH TWO PAN HEAD SCREWS AND TWO WASHERS PROVIDED WITH THE SAFETY HANDLES 14 X 1 1 4 PAN HEAD SCREW SAFETY HANDLES 1 4 WASHER 98 ...

Страница 110: ...FETY HANDLES RAMP 1 LOCATE THE SECOND SAFETY HANDLE BAG 2 ADJUST THE SAFETY HANDLES UP OR DOWN TO SUIT THE NEEDS OF YOUR CHILD 3 ATTACH EACH SAFETY HANDLE TO THE CENTER POST AND PANEL SLAT WITH TWO PAN HEAD SCREWS AND TWO WASHERS PROVIDED WITH THE SAFETY HANDLES 99 ...

Страница 111: ...PE IS TIGHT AND WILL NOT WRAP AROUND YOUR HAND HINT TO REDUCE THE AMOUNT OF SLACK IN THE ROPE LIFT THE ROCK WALL ASSEMBLY SLIGHTLY WHEN TYING THE KNOT IN THE BOTTOM ROCK WALL BOARD WHEN YOU LOWER THE ASSEMBLY THE ROPE WILL TIGHTEN IF THERE IS A LARGE AMOUNT OF EXCESS ROPE ON ROCK WALL YOU CAN TIE THREE KNOTS APPROXIMATELY 18 APART ON THE ROCK WALL TO AID YOUR CHILD IN CLIMBING STEP 55 INSTALLING C...

Страница 112: ...STEP 56 FLAG KIT 1 PLACE A FLAGON THE CORNER POSTS AT THE FRONT OF THE FORT 2 ATTACH THE BASE OF THE FLAG WITH THE 1 2 PHILLIPS HEAD SCREWS PROVIDED DO NOT OVER TIGHTEN FLAG 1 2 PHILLIPS HEAD SCREW 101 ...

Страница 113: ...STEP 57 SANDBOX SEATS AND NAMEPLATE 1 PLACE THE 5 4 X 6 X 22 SANDBOX SEATS ONTO THE TOP OF THE SANDBOX BOARDS AS SHOWN BELOW 2 ATTACH THE SANDBOX SEATS TO THE SANDBOX BOARDS WITH 8 X 2 WOOD SCREWS 3 LOCATE THE NAME PLATE FOR YOUR PLAY SET ATTACH THE NAME PLATE TO THE FRONT OF THE SWING BEAM WITH 8 X 1 WOOD SCREWS 102 ...

Страница 114: ...AGAINST THE ROOF SUPPORTS 3 ATTACH THE PLASTIC SUNBURST WITH SIX 8 X 2 WOOD SCREWS ALONG THE SIDES ATTACH THE TRIANGLE PORTION OF THE SUNBURST PIECE WITH 8 X 2 1 2 WOOD SCREWS 4 REPEAT SUBTEPS 2 AND 3 ON THE OTHER SIDE OF THE PLAY SET PLASTIC SUNBURST 8 X 2 1 2 WOOD SCREWS 8 X 2 WOOD SCREWS 6 IN THE SIDES 2 IN TRIANGLE PORTION PLASTIC SUNBURST ROOF SUPPORTS 103 ...

Страница 115: ...AGAINST YOUR HAND IF THE TOP PART OF THE STAKE TWISTS WHEN IT ENCOUNTERS A ROCK OR ROOT YOU MAY HAVE TO BEND THE TOP PORTION OF THE STAKE AGAINST THE SWING LEG FINALLY INSTALL THE SCREW AND WASHER 2 ATTACH EACH GROUND STAKE TO THE SWING LEG WITH A 14 X 2 PAN HEAD SCREW AND A 1 4 FENDER WASHER PROVIDED WITH THE GROUND STAKE DETAIL A SCALE 1 6 STAKE PAN HEAD SCREW 14 x 2 GROUND 1 4 FENDER WASHER 104...

Страница 116: ...PILOT HOLE 1 BELOW THE CENTER OF THE T NUT DRILL THE HOLE 2 DEEP 3 PLACE THE STEERING WHEEL INSERT INSIDE THE STEERING WHEEL 4 USE THE 2 1 2 LAG SCREW AND WASHER TO FASTEN THE STEERING WHEEL TO THE REAR CENTER POST DO NOT OVER TIGHTEN THE LAG SCREW OR THE STEERING WHEEL WILL NOT TURN 5 PLACE THE STEERING WHEEL CAP OVER THE CENTER OF THE STEERING WHEEL AND SNAP IT INTO THE STEERING WHEEL INSERT 105...

Страница 117: ...APPENDIX 106 ...

Страница 118: ... SCREW QTY 2 8 X 2 WOOD SCREW QTY 4 2 SQUARE DRIVE BIT QTY 1 Chimney and Dormers Hardware Kit 8 10 2015 JH 8 9 1 4 3 2 5 6 7 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES ...

Страница 119: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY ...

Страница 120: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY ...

Страница 121: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...

Страница 122: ...KE SURE THE FRONT ROOF EDGES ARE FLUSH TO ONE ANOTHER 3 FASTEN THE LEFT DORMER SIDE TO THE PEAK SUPPORT WITH 8 X 1 1 2 WOOD SCREWS REPEAT SUBSTEPS 1 3 TO CONSTRUCT ANOTHER ROOF ASSEMBLY BOTTOM VIEW FRONT ROOF EDGES FLUSH TO ONE ANOTHER HERE FRONT FACE SUPPORTS THE BACK OF THE PLASTIC DORMER SUNBURST WILL SIT AGAINST THESE IN THE NEXT STEP COMPLETED ROOF ASSEMBLY ...

Страница 123: ...T INSTALL A 8 X 1 2 PAN HEAD SCREW AT EACH HOLE LOCATION STEP 2 DORMER 1 PLACE THE PLASTIC DORMER SUNBURST AGAINST THE FRONT FACE SUPPORT ON THE LEFT AND RIGHT ROOF SIDES 2 PREDRILL 7 64 PILOT HOLES BY 1 2 DEEP INTO THE ROOF SIDES AT EACH HOLE LOCATION 3 INSTALL 8 X 1 2 PAN HEAD SCREWS TO FASTEN THE SUNBURST TO THE ROOF SIDES REPEAT SUBSTEPS 1 THROUGH 3 TO CONSTRUCT THE SECOND DORMER A ...

Страница 124: ... TO SIDE ON TOP OF THE ROOF 4 ATTACH THE DORMER TO THE ROOF WITH ONE 8 X 2 1 2 WOOD SCREW AT THE REAR PEAK OF THE ROOF ATTACH THE DORMER SUNBURST TO THE ROOF WITH TWO 8 X 1 1 2 WOOD SCREWS REPEAT SUBSTEPS 1 THROUGH 4 FOR THE DORMER ON THE OTHER SIDE OF THE ROOF 8 x 2 1 2 WOOD SCREW DORMER 8 x 1 1 2 WOOD SCREWS DORMER THE UNIT SHOWN ABOVE MAY NOT BE YOUR EXACT PLAY SET SHOWN FOR ILLUSTRATION PURPOS...

Страница 125: ...SIDES OF THE CHIMNEY WITH A 2 WOOD SCREW 1 FIND THE REAR AND RIGHT SIDE OF THE CHIMNEY 2 ATTACH THE REAR AND RIGHT SIDES OF THE CHIMNEY WITH A 2 WOOD SCREW CHIMNEY REAR USE A 2 WOOD SCREW IN THIS LOCATION CHIMNEY RIGHT SIDE CHIMNEY LEFT SIDE USE A 2 WOOD SCREW IN THIS LOCATION CHIMNEY FRONT ...

Страница 126: ... 5 CHIMNEY 1 ATTACH THE CHIMNEY SIDES FROM THE PREVIOUS SIDES TO FORM THE CHIMNEY WITH 2 AND 1 1 4 WOOD SCREWS USE A 2 WOOD SCREW IN THIS LOCATION EACH SIDE USE 1 1 4 WOOD SCREWS IN THIS LOCATION EACH SIDE ...

Страница 127: ...ROOF USE THE DIAGRAM BELOW AS A GUIDE FOR A SUGGESTED PLACE TO MOUNT THE CHIMNEY 2 AFTER INSTALLING THE CHIMNEY MOUNTING BLOCK PLACE THE CHIMNEY ASSEMBLY ON THE ROOF SO THAT THE INSIDE OF THE BACK WALL RESTS AGAINST THE BLOCK 3 FASTEN THE CHIMNEY TO THE CHIMNEY MOUNTING BLOCK WITH A 8 X 1 1 2 WOOD SCREW IN EACH SIDE 1 ON EACH SIDE WOOD SCREWS BACK WALL OF CHIMNEY CHIMNEY MOUNTING BLOCK 5 4 X 3 X 6...

Страница 128: ...Model 1525 BOXES 1525 wood box 1525 Hardware box 2 Windows REV 11 12 2015 Note Plastic Sunburst and Flags shown come with your playset These items are not included with the 1525 kit Treehouse Add On Kit ...

Страница 129: ...Add On Kit Wood Accessory and Hardware Lists These lists for the Treehouse Add On Kit are in the Appendix at the end of your play set instruction manual or they are included with this sheet Steps to complete the Treehouse Add On Kit The instruction steps for the Treehouse Add On Kit are in the Appendix at the end of your play set instruction manual or they are included with this sheet If you are a...

Страница 130: ...9 12 Assembling The Roof Panels Step 1 Roof Peak Support Step 2 Mounting Roof Sections to Play Set Step 3 Roof Peak Step 4 Sun Support Step 5 Plastic Sunburst Step 6 Wall Panel Boards Step 7 Plastic Windows Step 8 Wall Panel Boards Step 9 Flag Kit Step 10 Telescope Instructions to relocate Pages 23 24 PLEASE READ OWNER S MANUAL CAREFULLY BEFORE STARTING ASSEMBLY TABLE OF CONTENTS 3 ...

Страница 131: ... time and familiarize you with all the different pieces in the hardware bag Important note Wood has some natural defects such as knots surface cracks etc We reject parts that are structurally defective We use a high quality lumber in our structures however you should inspect each part for splinters or rough spots and sand them smooth to prevent injury After familiarizing yourself with all of the c...

Страница 132: ...ts EXAMPLE OF OFFSET HOLES UP EXAMPLE OF OFFSET HOLES DOWN Counter sunk holes Many of the parts that will be used have counter sunk holes A counter sunk hole is one that surrounds one side of a through hole but does not extend through the wood it s self When using a counter sunk hole the bolt will be inserted through the through hole and either the head of the bolt and washer or nut and washer wil...

Страница 133: ...art to fit into a certain area of the play set B We need the designation to be simple The 3600 is the length of the board It means the board is 36 inches long If the code were 3625 then the board is 36 1 4 in length The BPB abbreviation stands for Bottom Panel Board The wood part bill of materials in the instructions has a description which will match the abbreviation closely In the event that the...

Страница 134: ...e 2 x 4 board installation shown below Place the board into position Spot Drill through the holes in the 2 x 4 board into the corner posts with an 11 64 drill bit Remove the 2 x 4 board Continue Example 3 8 diameter x 5 lag screw This would be like the 4 x 4 board installation shown below Place the LAG SCREW DIAMETER DRILL BIT SIZE 5 16 DIAMETER 9 64 3 8 DIAMETER 11 64 Pre drilling holes for lag s...

Страница 135: ...its 1 8 3 8 9 64 ___ Wrench and Socket ___ Deep Well Socket ___ Level ___ Tape Measure ___ Extension Cord if using standard drill ___ Hammer ___ Pencil KIT CONTENTS Swings Slides Accessories ___ Qty Description ___ 2 Plastic Windows Hardware see following pages Wood Components see following pages 8 ...

Страница 136: ...5 16 X 3 1 2 5 16 WASHER QTY 2 8 X 1 1 4 WOOD SCREW QTY 32 1525 HARDWARE PAGE 1 OF 1 11 18 2014 S O 8 X 1 1 2 WOOD SCREW QTY 92 8 9 1 4 3 2 5 6 7 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES 9 ...

Страница 137: ... 1000 WPB 1 BOARD WALL PANEL 1 X 4 X 10 00 1 3 1150 WTB 4 TOP BOTTOM WINDOW 1 X 3 X 11 50 1 3 1406 WPB 2 BOARD WALL PANEL 1 X 3 X 14 06 1 4 2175 WPB 2 BOARD WALL PANEL 1 X 4 X 21 75 1 2 0988 WPB 3 2 BOARD WALL PANEL 1 X 2 X 9 88 1 X 4 X 20 50 WALL PANEL BOARD 1 4 2050 WPB 10 ...

Страница 138: ...PANEL BOARD 1 4 1825 WPB 2 4 5113 RSR 1 RIGHT ROOF SUPPORT 1 5 0688 RP 1 1 ROOF PEAK 1 X 5 X 6 88 2 3 3570 SS 2 SUN SUPPORT 2 X 3 X 35 70 2 X 4 X 51 13 2 X 4 X 51 13 ROOF SUPPORT LEFT 2 4 5113 RSL DESCRIPTION PICTURE QTY 11 ...

Страница 139: ...DESCRIPTION PICTURE QTY 2 BOX PANEL 1525 HARDWARE BOX 07 0013 4 10 4350 RPLA ROOF PANEL 4 10 4350 RPRA 1 RIGHT ASSEMBLY ROOF PANEL LEFT ASSEMBLY 1 4 X 10 X 43 50 4 X 10 X 43 50 WINDOW HARDWARE 1 12 ...

Страница 140: ...NT VIEW FLUSH 3 ATTACH USING 8 X 1 1 2 WOOD SCREWS THROUGH THE PRE DRILLED HOLES INTO THE ROOF SUPPORT 1 3 FOR THE ROOF SECTION RIGHT ROOF SECTION LEFT 4 X 10 X 43 50 ROOF PANEL RIGHT ASSEMBLY REPEAT SUB STEP 4 FIND THE 2 X 4 X 51 13 ROOF SUPPORT RIGHT AND THE ROOF SUPPORT LEFT COUNTERBORED HOLE 8 X 1 1 2 WOOD SCREW ANGLED END TOP ANGLED END TOP 4 X 10 X 43 50 ROOF PANEL LEFT 2 MAKE SURE THE ANGLE...

Страница 141: ... ANOTHER 2 PLACE THE ROOF PEAK SUPPORT ON TOP OF THE ROOF SUPPORTS MAKE SURE THE ROOF PEAK SUPPORT TOP EDGES ARE FLUSH AGAINST THE BOTTOM FACE OF THE ROOF SECTION BOTTOM BATTEN FASTEN USING FOUR 8 X 2 WOOD SCREWS THROUGH THE PRE DRILLED HOLES INTO THE ROOF SUPPORTS FROM 1503 BOX ROOF SECTION RIGHT 5 4 X 6 X 10 ROOF PEAK SUPPORT ROOF SECTION LEFT 8 X 2 WOOD SCREW ROOF SECTION BOTTOM BATTEN 14 ...

Страница 142: ...RE THERE ARE NO GAPS IN BETWEEN ROOF BOARDS REMOVED FOR CLARITY ROOF SECTION ASSEMBLY 5 16 X 3 1 2 LAG SCREW FRONT OF PLAY SET PLAY SET ROOF SUPPORT ROOF SUPPORT 5 16 WASHER PLAY SET CORNER POST 3 FASTEN THE ROOF SECTION TO THE PLAY SET ROOF SUPPORTS USING SIX 8 X 2 1 2 WOOD SCREWS THROUGH THE TOP BATTEN PRE DRILLED HOLES CORNER POST SIDE INSIDE VIEW LAG SCREW PLAY SET ROOF SUPPORT ROOF SECTION AS...

Страница 143: ... 5 X 6 88 ROOF PEAK PLAY SET ROOF SUPPORT STEP 4 ROOF PEAK 1 MOUNT THE 1 X 5 X 6 88 ROOF PEAK ON TOP OF THE ROOF SECTION ASSEMBLY FLUSH WITH THE PLAY SET ROOF SUPPORTS FASTEN USING TWO 8 X 1 1 4 WOOD SCREWS GENERIC PLAY SET 16 ...

Страница 144: ...UN SUPPORT STEP 5 SUN SUPPORT 1 PLACE THE 2 X 3 X 35 70 SUN SUPPORT IN BETWEEN THE ROOF SUPPORTS FASTEN USING 8 X 2 1 2 WOOD SCREWS THROUGH THE PRE DRILLED HOLES ON EACH END MAKE SURE THERE ARE NO GAPS IN BETWEEN THE SUN SUPPORT AND THE ROOF SUPPORT 17 ...

Страница 145: ...LASTIC SUNBURST 1 MOUNT THE PLASTIC SUNBURST TO THE ROOF SUPPORTS ON THE ROOF SECTION ASSEMBLY THE PLASTIC SUNBURST MUST BE UP AGAINST THE OVERHANGING ROOF BOARDS FASTEN THE PLASTIC SUNBURST TO THE ROOF SUPPORTS USING TWO 8 X 2 1 2 WOOD SCREWS ON THE TOP AND SIX 8 X 2 WOOD SCREWS ON THE REMAINING HOLES 18 ...

Страница 146: ...ST CENTERED BETWEEN THE WALL PANEL BOARDS PREVIOUSLY INSTALLED FASTEN USING SIX 8 X 1 1 4 WOOD SCREWS 4 MOUNT THE 1 X 3 X 11 50 WINDOW TOP BOTTOM USING THE DIMENSIONS SHOWN IN THE DIAGRAM MAKE SURE THE PRE DRILLED HOLES ARE OFFSET UP ON THE TOP BOARDS AND OFFSET DOWN ON THE BOTTOM BOARDS FASTEN USING TWO 8 X 1 1 2 WOOD SCREWS PER BOARD 5 MOUNT THE 1 X 4 X 21 75 WALL PANEL BOARD NEXT TO THE WINDOW ...

Страница 147: ...WN OVER THE SUN PIECE ON THE FRONT OF THE PLAY SET ABOVE THE PLASTIC WINDOWS 3 ATTACH THE CROWN TO THE SUN WITH 8 X 1 1 4 WOOD SCREWS FRONT OF PLAY SET PLASTIC WINDOW 1 2 1 2 1 PLASTIC WINDOW SUN SUPPORT WOOD SCREW 8 X 1 1 4 2 1 X 4 X 21 75 WALL PANEL BOARD 1 X 4 X 20 50 WALL PANEL BOARD 1 X 3 X 11 50 WINDOW TOP BOTTOM BOARD 1 X 3 X 11 50 WINDOW TOP BOTTOM BOARD PLAY SET FRONT TOP PANEL BOARD 20 ...

Страница 148: ...AVING A 1 4 2 MOUNT THE 1 X 3 X 14 06 WALL PANEL BOARD NEXT SUPPORT USING TWO 8 X 1 1 2 WOOD SCREWS 3 MOUNT THE 1 X 4 X 10 00 WALL PANEL 4 MOUNT THE 1 X 2 X 9 88 WALL PANEL BOARD CENTERED ON TOP OF THE PREVIOUS WALL PANEL BOARDS IT SHOULD BE ABOVE THE PLAY SET PANEL SLAT AS SHOWN IN THE DIAGRAM MAKE SURE THE HOLES ARE CENTERED ON EACH OF THE BOARDS AND FASTEN IT USING SIX 8 X 1 1 4 WOOD SCREWS REP...

Страница 149: ...ENTERED ON THE WALL PANEL BOARD NEXT TO THE CORNER POST AT THE FRONT OF THE FORT 2 ATTACH THE BASE OF THE FLAG WITH THE 1 2 PHILLIPS HEAD SCREWS PROVIDED DO NOT OVER TIGHTEN FLAG HEAD SCREW CORNER POST 1 2 PHILLIPS WALL PANEL BOARD 22 ...

Страница 150: ...from the other Telescope Bracket Fasten the Telescope Bracket to the 2 x 4 with the 1 1 4 phillips countersunk head screws provided See Mounting to 4 x 4 Board on the other side of this sheet if you wish to mount the Telescope on the top of a 4 x 4 Board WARNING DO NOT LOOK INTO SUN OR OTHER BRIGHT LIGHTS WITH TELESCOPE Please note Telescope does not magnify objects Telescope is intended for make ...

Страница 151: ... of 1 Center the Telescope Stand on top of the 4 x 4 board 2 Place the notched area of one of the half circle shaped Telescope Brackets over the top WARNING DO NOT LOOK INTO SUN OR OTHER BRIGHT LIGHTS WITH TELESCOPE Please note Telescope does not magnify objects Telescope is intended for make believe play by children FOR RESIDENTIAL USE ONLY FOR CHILDREN AGES 3 11 4 x 4 board Telescope Stand Half ...

Страница 152: ...hen those items should be left off until the Fort Add On is installed Example Steering Wheel Telescope etcetera Panel Slats section of main manual The two panel slats at the front of the play set may be installed The panel slat arrangement in the main manual should not be followed on the sides or in the rear Follow Step 10 or 10A in the Fort Add On instructions For some play sets slight deviations...

Страница 153: ...Model 1531 BOXES 1531 wood box 1531 Hardware box 2 Windows REV 3 1 2016 FORT ADD ON KIT Note Plastic Sunburst shown comes with your playset This item is not included with the 1531 kit ...

Страница 154: ... manual outline how to arrange the panel slats around where the Tire Swing Beam is attached Some playsets have a Tube Slide here along with a rear mounted Ladder If the playset has a Tube Slide here then this kit does not have extra slats to fill up the spaces between the existing slats REAR OF FORT REAR OF FORT rear mounted Ladder Plastic Sunburst included with playset NOT with 1531 kit Plastic S...

Страница 155: ...sembling the Roof Panels Step 1 Roof Peak Support Step 2 Rear Panel Support Step 2A Mounting Roof Sections to Playset Step 3 Roof Peak Step 4 Sun Support Step 5 Plastic Sunburst Step 6 Wall Panel Boards Step 7 Rear Plastic Windows Step 8 Wall Panel Boards Step 9 Panel Slats Step 10 Panel Slats Step 10A PLEASE READ OWNER S MANUAL CAREFULLY BEFORE STARTING ASSEMBLY TABLE OF CONTENTS 4 ...

Страница 156: ... parts that are structurally defective We use a high quality lumber in our structures however you should inspect each part for splinters or rough spots and sand them smooth to prevent injury After familiarizing yourself with all of the components read all instructions thoroughly Reading instructions after you have studied the parts will help you understand the installation process and help to elim...

Страница 157: ...ts EXAMPLE OF OFFSET HOLES UP EXAMPLE OF OFFSET HOLES DOWN Counter sunk holes Many of the parts that will be used have counter sunk holes A counter sunk hole is one that surrounds one side of a through hole but does not extend through the wood it s self When using a counter sunk hole the bolt will be inserted through the through hole and either the head of the bolt and washer or nut and washer wil...

Страница 158: ...7 ...

Страница 159: ...e 2 x 4 board installation shown below Place the board into position Spot Drill through the holes in the 2 x 4 board into the corner posts with an 11 64 drill bit Remove the 2 x 4 board Continue Example 3 8 diameter x 5 lag screw This would be like the 4 x 4 board installation shown below Place the LAG SCREW DIAMETER DRILL BIT SIZE 5 16 DIAMETER 9 64 3 8 DIAMETER 11 64 Pre drilling holes for lag s...

Страница 160: ...3 8 9 64 ___ Wrench and Socket ___ Deep Well Socket ___ Level ___ Tape Measure ___ Extension Cord if using standard drill ___ Hammer ___ Pencil KIT CONTENTS Swings Slides Accessories ___ Qty Description ___ 2 Plastic Dormer Window 07 0029 G Hardware see following pages Wood Components see following pages 9 ...

Страница 161: ... 16 X 3 1 2 5 16 WASHER QTY 2 8 X 1 1 4 WOOD SCREW QTY 32 1525 HARDWARE PAGE 1 OF 1 11 18 2014 S O 8 X 1 1 2 WOOD SCREW QTY 92 8 9 1 4 3 2 5 6 7 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES 10 ...

Страница 162: ...MEASURE YOUR BOLTS AND SCREWS PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES QTY 2 HEX BOLT 1531 Rear Treehouse HARDWARE rev A PAGE 1 OF 1 7 16 2015 S O 5 16 X 4 1 2 5 16 WASHER QTY 2 8 X 2 WOOD SCREW QTY 48 11 ...

Страница 163: ...BOTTOM 1 3 1150 WTB 4 1 X 3 X 14 06 WALL PANEL BOARD 1 3 1406 WPB 2 1 X 4 X 21 75 WALL PANEL BOARD 1 4 2175 WPB 2 1 X 2 X 9 88 WALL PANEL BOARD 1 2 0988 WPB 3 2 1 X 4 X 20 25 WALL PANEL BOARD 1 4 2025 WPB 1 X 4 X 20 50 WALL PANEL BOARD 1 4 2050 WPB PICTURE DESCRIPTION QTY 12 ...

Страница 164: ...TY 1 2 X 4 X 51 13 ROOF SUPPORT RIGHT 2 4 5113 RSR 1 1 X 5 X 6 88 ROOF PEAK 1 5 0688 RP 1 1 2 X 3 X 35 70 SUN SUPPORT 2 3 3570 SS 2 1 X 4 X 18 25 WALL PANEL BOARD 1 4 1825 WPB 2 X 4 X 51 13 ROOF SUPPORT LEFT 2 4 5113 RSL 13 ...

Страница 165: ... PANEL SLAT 1 6 2825 PS 1 12 1 2 X 6 X 70 00 REAR PANEL SUPPORT 2 6 7000 RPS 4 X 10 X 43 50 ROOF PANEL RIGHT ASSEMBLY 4 10 4350 RPRA 1 4 X 10 X 43 50 ROOF PANEL LEFT ASSEMBLY 4 10 4350 RPLA PICTURE DESCRIPTION QTY 14 ...

Страница 166: ...PICTURE DESCRIPTION QTY WINDOW PANEL 07 0029 G 1 HARDWARE BOXES 1525 1531 HARDWARE BOXES 1 PLASTIC SUNBURST 07 0028 G 2 THIS PIECE IS INCLUDED WITH PLAYSET PARTS NOT THIS ADD ON KIT 15 ...

Страница 167: ...NT VIEW FLUSH 3 ATTACH USING 8 X 1 1 2 WOOD SCREWS THROUGH THE PRE DRILLED HOLES INTO THE ROOF SUPPORT 1 3 FOR THE ROOF SECTION RIGHT ROOF SECTION LEFT 4 X 10 X 43 50 ROOF PANEL RIGHT ASSEMBLY REPEAT SUB STEP 4 FIND THE 2 X 4 X 51 13 ROOF SUPPORT RIGHT AND THE ROOF SUPPORT LEFT COUNTERBORED HOLE 8 X 1 1 2 WOOD SCREW ANGLED END TOP ANGLED END TOP 4 X 10 X 43 50 ROOF PANEL LEFT 2 MAKE SURE THE ANGLE...

Страница 168: ... FROM THE 1503 BOX LAY THE ROOF SECTION LEFT AND THE ROOF SECTION RIGHT ON A FLAT SURFACE ALIGN THE ANGLED ENDS FLUSH WITH ONE ANOTHER 2 PLACE THE ROOF PEAK SUPPORT ON TOP OF THE ROOF SUPPORTS MAKE SURE THE ROOF PEAK SUPPORT TOP EDGES ARE FLUSH AGAINST THE BOTTOM FACE OF THE ROOF SECTION BOTTOM BATTEN FASTEN USING FOUR 8 X 2 WOOD SCREWS THROUGH THE PRE DRILLED HOLES INTO THE ROOF SUPPORTS 17 ...

Страница 169: ...N 2 USE 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS TO ATTACH THE HOLES OF THE REAR PANEL SUPPORT TO THE T NUTS INSTALLED ON THE CORNER POSTS 3 PLACE THE CENTER POST INSIDE THE REAR PANEL SUPPORT AT THE REAR OF THE PLAYSET LINE UP THE HOLE IN THE CENTER POST WITH THE CENTER HOLE IN THE REAR PANEL SUPPORT 4 FASTEN THE CENTER POST TO THE RAILINGS WITH 5 16 X 2 1 2 HEX BOLTS AND 5 16 WASHERS AT THE TOP 5...

Страница 170: ...T 5 16 X 3 1 2 LAG SCREW 2 SECURE THE ROOF SECTION TO THE CORNER POSTS USING TWO 5 16 X 3 1 2 LAG SCREWS STEP 3 MOUNTING ROOF SECTIONS TO PLAYSET THE ROOF SECTION ASSEMBLY ROOF SUPPORTS AND 5 16 WASHER THROUGH THE COUNTER SUNK HOLES LOCATED ON THE BOTTOM ENDS OF 1 MOUNT THE ROOF SECTION ASSEMBLY TO THE REAR OF THE PLAY SET SLIDE THE ROOF SECTION UNTIL IT IS FLUSH UP AGAINST THE BOTTOM OF THE PLAY ...

Страница 171: ...4 WOOD SCREW PLAYSET ROOF SUPPORT GENERIC PLAYSET REAR OF PLAYSET STEP 4 ROOF PEAK 1 MOUNT THE 1 X 5 X 6 88 ROOF PEAK ON TOP OF THE ROOF SECTION ASSEMBLY FLUSH WITH THE PLAY SET ROOF SUPPORTS FASTEN USING TWO 8 X 1 1 4 WOOD SCREWS 20 ...

Страница 172: ...OF SUPPORT STEP 5 SUN SUPPORT 1 PLACE THE 2 X 3 X 35 70 SUN SUPPORT IN BETWEEN THE ROOF SUPPORTS FASTEN USING 8 X 2 1 2 WOOD SCREWS THROUGH THE PRE DRILLED HOLES ON EACH END MAKE SURE THERE ARE NO GAPS IN BETWEEN THE SUN SUPPORT AND THE ROOF SUPPORT 21 ...

Страница 173: ...LY THE PLASTIC SUNBURST MUST BE UP AGAINST THE OVERHANGING ROOF BOARDS FASTEN THE PLASTIC SUNBURST TO THE ROOF SUPPORTS USING TWO 8 X 2 1 2 WOOD SCREWS ON THE TOP AND SIX 8 X 2 WOOD SCREWS ON THE REMAINING HOLES 2 1 2 WOOD SCREW X2 PLASTIC SUNBURST ROOF SECTION ASSEMBLY ROOF SUPPORT 2 WOOD SCREW X6 22 ...

Страница 174: ...S PREVIOUSLY INSTALLED FASTEN USING SIX 8 X 1 1 4 WOOD SCREWS 4 MOUNT THE 1 X 3 X 11 50 WINDOW TOP BOTTOM USING THE DIMENSIONS SHOWN IN THE DIAGRAM MAKE SURE THE PRE DRILLED HOLES ARE OFFSET UP ON THE TOP BOARDS AND OFFSET DOWN ON THE BOTTOM BOARDS FASTEN USING TWO 8 X 1 1 2 WOOD SCREWS PER BOARD 5 MOUNT THE 1 X 4 X 21 75 WALL PANEL BOARD NEXT TO THE WINDOW TOP BOTTOM BOARDS FOLLOW THE DIMENSIONS ...

Страница 175: ...OOD SCREWS 1 PLACE EACH PLASTIC WINDOW INTO THE REAR OPENINGS WITH THE ARCHED SECTION REAR PLASTIC WINDOW REAR OF PLAYSET WOOD SCREW 8 X 1 1 4 1 X 3 X 11 50 WINDOW TOP BOTTOM BOARD 1 X 4 X 20 50 WALL PANEL BOARD 1 X 3 X 11 50 WINDOW TOP BOTTOM BOARD REAR PLASTIC WINDOW REAR PANEL SUPPORT SUN SUPPORT 24 ...

Страница 176: ...OARDS AND FASTEN IT USING SIX 8 X 1 1 4 WOOD SCREWS REPEAT SUB STEPS 1 TO 4 FOR THE OTHER SIDE 8 X 1 1 4 WOOD SCREW 1 X 2 X 9 88 WALL PANEL BOARD 3 MOUNT THE 1 X 4 X 10 00 WALL PANEL BOARD NEXT TO THE PREVIOUS WALL PANEL BOARD LEAVING A 1 4 GAP BETWEEN THEM FASTEN IT TO THE ROOF SUPPORT USING TWO 8 X 1 1 2 WOOD SCREWS THE BOTTOM END WITH NO PRE DRILLED HOLES SHOULD BE RESTING AGAINST THE REAR PANE...

Страница 177: ... 4 X 2 5 8 X 28 1 4 SWING BEAM SIDE 12 1 4 VIEW FROM OUTSIDE LADDER SIDE THE PLAYSET 5 4 X 2 5 8 X 28 1 4 PANEL SLAT 5 4 X 6 X 28 1 4 PANEL SLAT 19 3 8 2 X 4 X 28 9 16 5 4 X 6 X 28 1 4 PANEL SLAT CENTER POST VIEW FROM INSIDE THE PLAYSET 5 4 X 2 5 8 X 28 1 4 PANEL SLAT THIS PANEL WERE REMOVED FOR A TIRE SWING BEAM CLARITY TIRESWING NOTE SOME BOARDS FRONT OF PLAYSET IF YOU HAVE THEN LEAVE SLAT OFF A...

Страница 178: ... 5 8 X 28 1 4 PANEL SLAT 5 4 X 6 X 28 1 4 PANEL SLAT 19 3 8 STEP 10A PANEL SLATS 2 WOOD SCREWS IN THE PRE DRILLED HOLES 1 INSTALL THE PANEL SLATS AT EQUAL LENGTHS SEE DETAIL BELOW FOR MEASUREMENTS 2 ATTACH THE PANEL SLATS TO THE FORT WITH ATTENTION USE THIS STEP ONLY IF YOUR LADDER IS INSTALLED ON THE REAR OF THE PLAYSET VIEW FROM INSIDE THE PLAYSET 5 4 X 6 X 28 1 4 PANEL SLAT 5 4 X 2 5 8 X 28 1 4...

Отзывы: