STEP 6A: LEVELING THE PLAY SET AND LAGS
1: INSTALL LAG SCREWS ONLY IN THE FOUR 2 X 6 BOARDS AT DECK HEIGHT AT THIS TIME.
SQUARE EACH OF THESE FOUR BOARDS TO THE CORNER POSTS AND THEN INSTALL THE
LAG SCREWS. THIS IS TO MAKE THE STRUCTURE RIGID FOR THE LEVELING AND SQUARING
PROCESS.
2: PLACE THE FRAME IN ITS FINAL POSITION AND FOLLOW THE PROCEDURES AT THE FRONT
OF THE MANUAL TO LEVEL AND SQUARE THE STRUCTURE. HAVE AN ASSISTANT HELP YOU
LIFT THE FRAME AS REQUIRED. DO NOT INSTALL REMAINING LAG SCREWS UNTIL AFTER THE
FRAME HAS BEEN LEVELED AND SQUARED.
3: ONCE THE FRAME IS LEVEL, SQUARE AND SET INTO POSITION; GO BACK AND INSERT
THE 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS IN ALL THE REMAINING HOLES OF
THE 2 X 6 PARTS ON THE FRONT, SIDES AND REAR OF THE PLAY SET. NOTE: THERE WILL NOT
BE ANY PREDRILLED HOLES IN THE CORNER POSTS FOR THE LAG SCREWS.
FRAME
FRONT OF FORT
SIDE
RIGHT SIDE FRAME
LAG SCREW
***IMPORTANT***
SQUARE BOARDS TO POSTS; THEN
INSTALL LAG SCREWS AND WASHERS
ONLY IN THESE FOUR 2 X 6 BOARDS
FIRST. THEN LEVEL/SQUARE THE
FRAME. FINALLY, INSTALL LAG
SCREWS IN THE REMAINING 2 X 6
BOARDS.
LEFT
5/16" X 3-1/2"
5/16" WASHER
40
Содержание 1500AWCR
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 9: ......
Страница 15: ...DESCRIPTION PICTURE QTY 1 1 11 0054 WINDOW 07 0013 1518 HARDWARE NOT SHOWN ...
Страница 17: ...1 REMOVE THE TWO SANDBOX SEAT BOARDS TO ATTACH THE WALL BOARDS STEP 2 REMOVING SANDBOX SEATS SANDBOX SEAT ...
Страница 64: ...ROPE DUCTILE SWING TELESCOPE 07 0001 11 4012 HANGERS IRON 10 ROCK WALL 6 DESCRIPTION PICTURE QTY 1 1 30 ...
Страница 65: ...DESCRIPTION PICTURE QTY 07 0005 SPRING CLIP 6 11 5013 BRACKET GREEN 11 4003 4 PAIR 90 SAFETY HANDLES 1pr 31 ...
Страница 127: ...APPENDIX 93 ...