STEP 5G - 1320 LB. AIR HOSE ASSEMBLY INSTALLATION (OPTIONAL)
5G.1
The air hose assembly comes attached to the wear ring and coil cord mounting plate. Once the
handle installation is complete, the air hose should be installed.
5G.2
Remove two of the screws and lockwashers holding the reinforcement plate to the underside of the
actuator (leaving the spacers in place) and insert them through the air hose bracket and reattach to
the underside of the actuator. Tighten all hardware.
5G.3
At the handle or G360™, insert the male swivel fitting at the end of the air hose into the female
end of the elbow in the footer and tighten.
5G.4
Connect the bulkhead fitting on the underside of the actuator to shop air and check for leaks.
17
Содержание G-Force iQ2 1320 lb
Страница 44: ...PROGRAM MODE CONTINUED 44...
Страница 46: ...PROGRAM MODE CONTINUED Diagram K Handle IO Detail Pendant Model 46...
Страница 85: ...Figure 9 VNC Viewer App 85...