Goodman GCH9 Скачать руководство пользователя страница 16

16

12 " Min To

Roof Or 

Highest Anticipated 

Snow Level

TEE

Vertical Termination (Single Pipe)

12" MIN.

TO ROOF OR

HIGHEST

ANTICIPATED
 SNOW LEVEL

90º

MEDIUM RADIUS

ELBOWS

Alternate Vertical Termination (Single Pipe)

MIN.

12"

FROM

WALL

12"

      TO GROUND OR

 HIGHEST ANTICIPATED

SNOW LEVEL

WALL

INSIDE

OUTSIDE

TEE

or

 90°ELBOW

TURNED

DOWN

COUPLING

ELBOW OR
COUPLING

Horizontal Termination (Single Pipe)

VENT/FLUE TEE

or

90° ELBOW TURNED

DOWN

12" MIN.

Horizontal Termination (Single Pipe)

Above Highest Anticipated Snow Level

D

IRECT

 V

ENT

 (D

UAL

 P

IPE

) P

IPING

The inlet air screens provided in the installation instruction packet
are available for the installer to use in the inlet of the combustion
air pipe to prevent animals from building nests in the combustion
air pipe.  Installation of screens, while strongly recommended, is
not required and will not affect performance of the unit.

Direct vent

 installations require both a combustion air intake and

a vent/flue pipe.  The pipes may be run horizontally and exit through
the side of the building or run vertically and exit through the roof of
the building.  The pipes may be run through an existing 

unused

chimney; however, they  must extend a minimum of 12 inches
above the top of the chimney.  The space between the pipes and
the chimney must be closed with a weather tight, corrosion resis-
tant flashing.  Both the combustion air intake and a vent/flue pipe
terminations must be in the same atmospheric pressure zone.

Although 

non-direct

 

vent

 installations do not require a combus-

tion air intake

 pipe

, a minimum of one 90° elbow should be at-

tached to the furnace’s combustion air intake 

if

: an upright instal-

lation uses the standard intake location.  This elbow will guard
against inadvertent blockage of the air intake.

V

ENT

/F

LUE

 P

IPE

 L

ENGTHS

 

AND

 D

IAMETERS

Refer to the following table for applicable length, elbows, and
pipe diameter for construction of the vent/flue pipe system of a
non-direct vent installation.  In addition to the vent/flue pipe, a
single 90° elbow should be secured to the combustion air intake
to prevent inadvertent blockage.  The tee used in the vent/flue
termination must be included when determining the number of
elbows in the piping system.

Pipe    

Siz e 

(4)

(inc .)

2

3

4

5

6

7

8

045_3

2

68

65

62

59

56

53

50

070_3

2

68

65

62

59

56

53

50

070_4

2

46

43

40

2

16

13

10

3

68

65

62

59

56

53

50

090_5

3

68

65

62

59

56

53

50

115_5

3

68

65

62

59

56

53

50

Non-Dire ct V e nt (Single  Pipe )

Maximum A llow able Length of  V ent/Flue Pipe (f t)

 

(1) (2)

Number of  Elbow s 

(3) (5)

Models

(kBtu_Tons)

090_4

Not Recommended

1) One 90° elbow should be secured to the combustion air intake con-

nection.

2) Minimum requirement for each vent pipe is five (5) feet in length and

one elbow/tee.

3) Tees and/or elbows used in the vent/flue termination must be included

when determining the number of elbows in the piping system.

4) 3” diameter pipe can be used in place of 2” diameter pipe.
5) Increased Clearance Configurations using (2) 45 deg.  Long Sweep

elbows should be considered equivalent to one 90 deg. elbow.

V

ENT

/F

LUE

 P

IPE

 T

ERMINATIONS

The vent/flue pipe may terminate vertically, as through a roof, or
horizontally, as through an outside wall.
Vertical vent/flue pipe terminations should be as shown in the
following figure.  Refer to 

Section IX, Vent/Flue Pipe and Com-

bustion Air Pipe - Termination Locations

 for details concerning

location restrictions.  The penetration of the vent through the roof
must be sealed tight with proper flashing such as is used with a
plastic plumbing vent.
Horizontal vent/flue pipe terminations should be as shown in the
following figure. Refer to 

Section IX, Vent/Flue Pipe and Combus-

tion Air Pipe - Termination Locations

 for details concerning loca-

tion restrictions.  A 2 3/8” diameter  wall penetration is required for
2” diameter pipe while a 3 1/2” diameter hole is required for 3”
diameter pipe.  To secure the pipe passing through the wall and
prohibit damage to piping connections, a coupling should be in-
stalled on either side of the wall and solvent cemented to a length
of pipe connecting the two couplings.  The length of pipe should
be the wall thickness plus the depth of the socket fittings to be
installed on the inside and outside of the wall.  The wall penetra-
tion should be sealed with silicone caulking material.
In a basement installation, the vent/flue pipe can be run between
joist spaces.  If the vent pipe must go below a joist and then up
into the last joist space to penetrate the header, two 45° elbows
should be used to reach the header rather than two 90° elbows.

Содержание GCH9

Страница 1: ...tall the product safely and to know it well enough to be able to instruct a customer in its safe use Safety is a matter of common sense a matter of thinking before acting Most dealers have a list of s...

Страница 2: ...ER VENT FLUE AND COMBUSTION AIR PIPING PRACTICES 13 TERMINATION LOCATIONS 13 CANADIAN VENTING REQUIREMENTS 14 STANDARD FURNACE CONNECTIONS 14 ALTERNATE FURNACE CONNECTIONS 14 NON DIRECT VENT SINGLE PI...

Страница 3: ...XVIII Troubleshooting 32 ELECTROSTATIC DISCHARGE ESD PRECAUTIONS 32 DIAGNOSTIC CHART 32 FAULT RECALL 32 RESETTING FROM LOCKOUT 32 XIX Maintenance 32 ANNUAL INSPECTION 32 FILTERS 32 BURNERS 33 INDUCED...

Страница 4: ...warranty certificate is also supplied with the unit Read the warranty carefully and note what is covered Keep the warranty cer tificate in a safe location for future reference If additional informatio...

Страница 5: ...e Pipe Connection Alternate 15 Rubber Elbow 16 Induced Draft Blower 17 Electrical Connection Inlets Alternate 18 Coil Front Cover Pressure Tap 19 Coil Front Cover Drain Port 20 Drain Line Penetrations...

Страница 6: ...The input rate and temperature rise are set per the furnace rating plate 100 outside air is provided for combustion air requirements during construction Temporary ducting can be used II SAFETY II SAF...

Страница 7: ...ly air opening and the combustible floor Exposure to contaminated combustion air will result in safety and performance related problems Do not install the furnace where the combustion air is exposed t...

Страница 8: ...tions of use g If improper venting is observed during any of the above tests the common venting system must be corrected halogen type refrigerants cleaning solutions such as perchloroethylene printing...

Страница 9: ...ipping heavily insulated caulked vapor barrier etc addi tional air may need to be provided using the methods described in 5 3 3 b or 5 3 4 Space Unconfined For purposes of this Code a space whose volu...

Страница 10: ...directly with an additional room s of sufficient volume so that the combined volume of all spaces meets the criteria for an unconfined space The total input of all gas utilization equipment installed...

Страница 11: ...ropriate in stallation positions ductwork connections and resulting airflow arrangements VII HO VII HO VII HO VII HO VII HORIZO RIZO RIZO RIZO RIZONT NT NT NT NTAL APPLI AL APPLI AL APPLI AL APPLI AL...

Страница 12: ...s require an orifice change to compensate for the energy content difference between natural and propane gas High altitude installations may require both a pressure switch and an orifice change These c...

Страница 13: ...nt flue pipe and a combustion air intake pipe Refer to the appropriate section for details concerning piping size length number of elbows furnace connections and terminations MATERIALS AND JOINING MET...

Страница 14: ...rd against inadvertent blockage COMBUSTION AIR PIPE DIRECT VENT INSTALLATIONS On upflow units secure the combustion air intake pipe directly to the air intake coupling On counterflow units secure the...

Страница 15: ...LT IN LEAKS CAUSING BODILY INJURY OR DEATH DUE TO EXPOSURE TO FLUE GASES INCLUDING CARBON MONOXIDE 7 Upflow and Counterflow units For upright installations externally mount the rubber elbow to the ven...

Страница 16: ...r of elbows in the piping system Pipe Size 4 inc 2 3 4 5 6 7 8 045_3 2 68 65 62 59 56 53 50 070_3 2 68 65 62 59 56 53 50 070_4 2 46 43 40 2 16 13 10 3 68 65 62 59 56 53 50 090_5 3 68 65 62 59 56 53 50...

Страница 17: ...ter pipe can be used in place of 2 diameter pipe 4 Increased Clearance Configurations using 2 45 deg Long Sweep elbows should be considered equivalent to one 90 deg elbow VENT FLUE AND COMBUSTION AIR...

Страница 18: ...furnace NOTE If the alternate vent flue outlet is utilized in an upright installation the drain trap and drain connections must be located on the same side as the alternate vent flue outlet In horizon...

Страница 19: ...Hose B with green hose clamps Ensure hoses and tubes maintain a downward slope for proper drainage and that they are not kinked or binding For details concerning mounting of the drain trap refer to S...

Страница 20: ...ht down side panel grommet holes Secure tubes to Hose A and Hose B using green hose clamps Ensure hoses and tubes maintain a downward slope for proper drainage and are not kinked or bound For details...

Страница 21: ...must be sized in accordance with the maximum overcurrent pro tection specified on the unit rating plate An electrical disconnect must be provided at the furnace location NOTE Line polarity must be ob...

Страница 22: ...Blower pressure switch is powered anytime the pressure switch is closed and provides 24 VAC humidifier control Remove the yellow wire and connect the supplied brown jumper wire to the pressure switch...

Страница 23: ...plying the furnace must be properly sized based on the gas flow required specific gravity of the gas and length of the run The gas line installation must comply with local codes or in their absence wi...

Страница 24: ...ctors and semi rigid tubing against physical and thermal damage when installed Ensure aluminum alloy tubing and connectors are coated to protect against external corrosion when in contact with masonry...

Страница 25: ...ne gas leak Rust can reduce the level of odorant in propane gas Do not rely on your sense of smell Contact a local propane gas supplier about installing a gas detecting warning system If the presence...

Страница 26: ...uipped with means to prevent operation of either unit unless the damper is in the full heat or cool position When the furnace is installed without a cooling coil it is recom mended that a removable ac...

Страница 27: ...bility of flue gases escaping through the drain system FURNACE OPERATION Purge gas lines of air prior to startup Be sure not to purge lines into an enclosed burner compartment Check for leaks using an...

Страница 28: ...NT UNRELIABLE OPERATION OR EQUIPMENT DAMAGE THE GAS MANIFOLD PRESSURE MUST BE AS SPECIFIED ON THE UNIT RATING PLATE ONLY MINOR ADJUSTMENTS SHOULD BE MADE BY ADJUSTING THE GAS VALVE PRESSURE REGULATOR...

Страница 29: ...rtially open position 2 Place thermometers in the return and supply ducts as close to the furnace as possible Thermometers must not be influenced by radiant heat by being able to see the heat exchange...

Страница 30: ...MODE DIP SWITCH IS SET TO 2 STG POSITION The normal operational sequence in sequence is as follows R and W thermostat contacts close initiating a call for heat Integrated control module performs safet...

Страница 31: ...Y CIRCUIT DESCRIPTION XVII SAFETY CIRCUIT DESCRIPTION XVII SAFETY CIRCUIT DESCRIPTION XVII SAFETY CIRCUIT DESCRIPTION GENERAL A number of safety circuits are employed to ensure safe and proper furnace...

Страница 32: ...e least recent fault RESETTING FROM LOCKOUT Furnace lockout results when a furnace is unable to achieve igni tion after three attempts during a single call for heat It is character ized by a non funct...

Страница 33: ...AME SENSOR QUALIFIED SERVICER ONLY Under some conditions the fuel or air supply can create a nearly invisible coating on the flame sensor This coating acts as an insulator causing a drop in the flame...

Страница 34: ...E LEA RE LEA RE LEAVIN VIN VIN VIN VING AN INST G AN INST G AN INST G AN INST G AN INSTALL ALL ALL ALL ALLA A A A ATI TI TI TI TIO O O O ON N N N N Cycle the furnace with the thermostat at least three...

Страница 35: ...kage proper length elbows and termination Check drain system Correct as necessary Correct pressure switch setpoint or contact motion Tighten or correct wiring connection Pressure switch hose blocked p...

Страница 36: ...e due to improper gas pressure or combustion air Induced draft blower and circulator blower runs continuously No furnace operation Integrated control module diagnostic LED is flashing FIVE 5 flashes F...

Страница 37: ...NT COVER PRESSURE SWITCH N O C GY BK PLUG CONNECTION FIELD SPLICE SWITCH TEMP OR 24V THERMOSTAT CONNECTIONS GR GND 115 VAC 24 VAC BLOWER COMPARTMENT DOOR SWITCH OPEN WHEN DOOR OPEN DOOR SWITCH BK GND...

Отзывы: