P
roduct
S
PecificationS
P
roduct
S
PecificationS
SS-CPG180-240
www.goodmanmfg.com
13
e
lectrical
e
ntrance
l
ocationS
u
nit
c
learanceS
36” minimum
roof overhang
Maintain an adequate clearance around the unit for safety, service, maintenance, and
proper unit operation. Leave a total clearance of 75” on the main control panel side
of the unit for possible removal of fan shaft, coil, electric heat, and gas furnace.
Leave a clearance of 48” on all other sides of the unit for possible compres-
sor removal or service access, and to ensure proper ventilation and
condenser airflow. Do not install the unit beneath any obstruction.
Install the unit away from all building exhausts to inhibit
Ingestion of exhaust air into the unit’s fresh-air intake.
12¹/₈”
3³/₅”
Low-
Voltage
Entrance
High-Voltage
Entrance
3⁴/₅”