8
Operating
33 / 86
8.3
Preparations for launch
To use the machine safely and for its intended purpose, the following requirements must be met:
The machine stands securely
The water tray is filled with clean, clear water
The machine was checked for damage, loose screw connections and for completeness
The water supply is functional
The direction of rotation arrow on the cut-off wheel and the cut-off wheel protective cover must
correspond
A suitable blade, which meets the optimum conditions, must be fitted
8.4
Switch on
The machine is switched on via the main switch. To do this, open the emergency stop function flap
and press the green button.
NOTE!
Check after start:
The cooling water must be conveyed in sufficient quantity from the water pump to the
cut-off wheel and discharged on both sides.Ist dies nicht der Fall, Maschine sofort
stoppen!
The motor is equipped with a thermal protection which is activated in case of a too high
temperature rise.
Before restarting the machine, wait about 30 minutes until the motor has cooled down.
Содержание Bridge Saw
Страница 2: ...2 86 ...
Страница 31: ...7 Installation and initial commissioning 31 86 ...
Страница 51: ...12 Spare parts list 51 86 12 3 3 Frame cpl ...
Страница 53: ...12 Spare parts list 53 86 ...
Страница 55: ...12 Spare parts list 55 86 12 3 4 Water sump cpl ...
Страница 57: ...12 Spare parts list 57 86 12 3 5 Guide bridge cpl ...
Страница 59: ...12 Spare parts list 59 86 ...
Страница 63: ...12 Spare parts list 63 86 12 3 8 Cutting head mounting cpl ...
Страница 65: ...12 Spare parts list 65 86 12 3 9 Cutting head cpl ...
Страница 67: ...12 Spare parts list 67 86 12 3 10 Protection cover cpl ...
Страница 69: ...12 Spare parts list 69 86 ...
Страница 85: ...13 Wiring diagram 85 86 13 Wiring diagram ...