90CS
CEA90C
99
143
40
Door panel
Model
An
Al
P
90C
CEV90C
99
250
56
90
CEV90
99 mm.
328 mm.
56 mm.
1650
1850
1450
111
DOOR PANEL INSTALLATION
mbedding box positioning.
E
The upper part of the door panel should be placed at 1,65m. height roughly. The hole dimensions
will depend on the type of door panel.
The door panel has been designed to be placed under most of the environmental conditions.
However it's recommended to take additional cautions like rainproof covers. To obtain a good
quality picture on video door entry systems, avoid direct incidence from light sources.
reparing the cables entry.
P
Break the bottom flange
to pass the cables through. In case of door panels
with more than one embedding box, break the side flanges and
attach the embedding boxes using UC junctions.