DOOR PANEL INSTALLATION
mbedding box positioning.
E
1650
1850
1450
reparing the cables entry.
P
Break the bottom flange
to pass the cables through. In case of door panels
with more than one embedding box, break the side flanges and
attach the embedding boxes using UC junctions.
1
CE610
125
140
56
Compact
CE615
125
220
56
2
CE620
125
257
56
3
CE630
125 mm.
374 mm.
56 mm.
*
*
Compact size Stadio Plus (audio/video) panels, allow configurations up to 10 push buttons.
lace the embedding box.
P
ssembly the door panel modules.
A
DOOR PANEL INSTALLATION
The upper part of the door panel should be placed at 1,65m. height roughly. The hole dimensions
will depend on the number of door panel modules.
The door panel has been designed to be placed under most of the environmental conditions.
However it's recommended to take additional cautions like rainproof covers. To obtain a good
quality picture on video door entry systems, avoid direct incidence from light sources.
Pass the wiring through the hole made in the bottom part of the
embedding box. Level and flush the embedding box. Once
the embedding box is placed, remove the protective labels
from the attaching door panel holes.
Insert the header DOWN marked in the lower module and fix it by screwing the module shafts.
Place the module spacer between lower and next modules, assuring that the spacer adjustment
notches are inside the panel. Fix the module by screwing the shafts. Repeat this procedure in
case of door panels with one more module (the maximum number of modules placed vertically
is three).
Insert the header UP marked in the last module and fix it by screwing the supplied screws.