HARDWARE NEEDED (ACTUAL SIZE)
12
DETAIL A
15
3/8-16 X 7 Hex Head Bolt Grade 5 - Zinc
QTY. 1
The installation clip
MUST
remain in place until pole is
raised in Goal Alignment,
page 18
.
Two or three people in good physical condition and capable of
lifting at least 90-100 lbs. (40-45 kg) each are recommended for
safe installation and assembly.
16
QTY. 1
Hex nut
ASSEMBLY TIP
The following pages will have a picture of the
Hardware Needed
along with the Quantity,
Part Number and Description. You can lay the
hardware on the picture to identify the hardware.
Step 1:
Align pole hinge with anchor plate hinge
, then
insert
Bolt (#15)
and hand tighten
Hex Nut (#16
).
15
16
2
2
14
14
Step 2: Lift pole to approximately 30 degrees and attach
installation clip
(#14)
to ground anchor
(#13)
and pole
(#2)
to
maintain the installation angle. See picture below and
Detail A
.
13
13
NOTE: BOLT AND NUT ARE LOCATED ON ANCHOR
NOTICE
WARNING
Содержание Escalade Sports RK060
Страница 3: ...3 ...
Страница 26: ...26 1 800 362 4625 ...