USER HANDBOOK
5-10
5.3 STANDARD OPERATION
When the GDU
net
is connected to a mains power supply, the
green
POWER ON
LED will illuminate on the front panel, as
shown in Fig. 5-12.
Fig. 5-12 Power On
The following start up sequence will begin:
1. The PASS and FAIL test LEDs will illuminate. The LCD back
light will be on but no messages are present.
2. After approximately 30 seconds the buzzer will sound and
the 6 test LEDs will illuminate in sequence.
3. For the keypad version of the GDU
net
, the display will show
‘Enter ID then #’, enter the user ID to continue.
4. The ‘INSERT INSTRUMENT’ test LED will be illuminated and
the LCD only now will display the message ‘GDUnet #010001
INSERT GMI’.
(#010001 - example serial number of a GDU
net
.)
5. The GDU
net
is now ready to test / calibrate instruments.
Keypad users have 10 seconds to test / calibrate an instrument
before the GDU
net
reverts back to ‘Enter ID then #’.
Note: The start-up sequence gives the opportunity to
observe the test LEDs and buzzer are functioning
correctly.
Содержание GDUnet
Страница 1: ...User Handbook Gas Measurement Instruments Ltd...
Страница 6: ...USER HANDBOOK iv...
Страница 14: ...USER HANDBOOK xii...
Страница 96: ...USER HANDBOOK 5 14...
Страница 106: ...6 10 USER HANDBOOK...
Страница 115: ...7 9 STANDALONE MODE Fig 7 13 Calibration Certificate...
Страница 121: ......