GMDE GEatom 315/318KTL
Global Mainstream Dynamic Energy Technology Ltd.
19
2. The installation wall must be vertical and can carry the weight of the inverter.
3. For the assembly, it is necessary to choose a solid wall or metal construction, which comply the fire
protection class F30 and the load capacity of 60kg per unit. Relevant provisions of construction
regulations must be observed!
4. Mount the device at an appropriate distance from combustible materials.
5. We recommend that you mount the device at eye level to ensure optimum user comfort.
6. Owing to its protection type (IP65), the device can also be mounted in outside areas.
Figure 8 Installation patterns
3.3.2 Mounting the Inverter
There are only two steps to mount the inverter. The first step is fixing the wall bracket, and the second
step is mounting the inverter. All the steps are shown below by the form of illustration.
The wall bracket can be fixed to the wall by four expansion bolts (M8*12mm: thread diameter is 8mm,
nominal diameter is 12mm). Select the appropriate screw types and dimensions for the wall material
is very important.
Inverter weight and dimensions are listed as follows:
Description
GEatom 315/318KTL
3-phase transformerless grid-tied battery inverter (maximum battery power:
15/18kW; maximum output power: 18kW)
Dimension
540mm x 670mm x 275mm
Weight
48 kg