GMDE GEatom 306KTL
Global Mainstream Dynamic Energy Technology Ltd.
7
maintaining the inverter.
Before installation:
Check for damage to inverter and package. If you are in doubt, please contact us or the distributor
before installing the inverter.
Before connecting the battery packs to the inverter, check the voltages and ensure that they are
within the limits of the GMDE inverter specifications. Failure to observe these specifications could void
your warranty.
Installation:
Only trained and qualified personnel familiar with local electrical codes may work with the electrical
installations. For optimum safety, please follow the steps described in this manual.
Please keep in mind that the inverter has battery input and AC grid output.
Disconnecting the inverter:
Please refer to “Disconnecting for maintenance” in section 6.1. Note that wait at least 15 minutes
before proceeding, after disconnecting the battery inverter from AC grid and battery packs.
Operating the inverter:
Do not commission the device until the overall system complies with the application-specific national
rules and safety regulations.
The ambient conditions given in the product documentation must be observed.
The machine or installation manufacturer is responsible for compliance with the limit values as
prescribed in the national regulations.
Only persons who are trained and qualified for the use and operation of this device may work on the
device.
Maintenance and modification:
Only authorized personnel are allowed to repair or modify the inverter. To ensure optimum safety for
user and environment, only the original spare parts available from your supplier should be used.
Functional safety parameters:
Unauthorized changes of functional safety parameters may cause injury or accidents to people or
inverter. Additionally
,
it will lead to the cancellation of all inverter operating approval certificates.