background image

 

GMDE        GEatom 306KTL                                                                         

 

Global Mainstream Dynamic Energy Technology Ltd. 

 

38 

5. Troubleshooting 

5.1Safety during Troubleshooting 

 

High electric voltage! Risk of death or personal injury by electric shock! 

Never work with live wires! It is prior to all connection and maintenance work. 

Make sure that the AC and DC wires are not charged. 

The connection area should only be opened by a licensed electrician. 

 

Warning! Danger from residual voltage out of capacitors. 

You must wait until the capacitors have fully discharged. Discharge takes around15 

minutes. 

 

Caution! Danger from inadequate grounding. 

An  inadequate  grounding  conductor  connection  can  cause  serious  injuries  to 

persons and damage to properties. 

 

5.2 Faults 

A fault can be divided into two catalogues: a permanent failure and a temporary failure. A ‘permanent 

failure’  is  defined  by  a  fault  having  been  present  for  more  than  15  minutes  and  cannot  be 

acknowledged  by  inverter’s  auto-restart.  Unlike  permanent  failure,  a  “transient  failure"  is 

automatically acknowledged by the inverter. The inverter attempts to restart once the error no longer 

exists. The fault is indicated on the control panel by the red "Alarm" LED emitting steady light. Most 

failures  are  transient;  therefore  the  system  should  be  monitored  for  a  while  before  contacting  the 

service as the transient failure may disappear itself. 

 

5.3 Fault Messages and Actions List 

Fault messages are stored in the fault memory even in the status of power failure. The fault data can 

be retrieved to display on the screen. The latest 100 fault logs are recorded in the fault memory. The 

latest fault is kept at memory location S0 while the earliest at S100.   

The transient failure is shown as “Warning” while the permanent failure as “Fault”. Check ‘Warnings 

and  actions’  table  when  a  transient  failure  occurs  and  check  the  ‘Faults  and  actions’  table  when  a 

permanent failure occurs. 

 

Содержание GEatom 306KTL

Страница 1: ...GMDE GEatom 306KTL Global Mainstream Dynamic Energy Technology Ltd 1 GEatom306KTL Three phase Grid Tied Battery Inverter Version 1 1...

Страница 2: ...2 1 General System Description 9 2 2 Description of the Device 10 2 3 Outside Dimension of the Device 11 2 4 Technical Data 12 2 4 1 DC Data 12 2 4 2 AC Data 12 2 4 3 General Data 13 3 Installation 14...

Страница 3: ...30 4 2 5 Setting Menu Display 30 4 2 6 Inv Info Menu Display 30 4 3Settings 31 4 3 1 Language Setting 32 4 3 2 Clock Setting 32 4 3 3 Password Setting 33 4 3 4 Battery Setting 34 4 3 5 Clear Data 36 4...

Страница 4: ...of GMDE Read this user manual before you start Thank you for purchasing our products this battery inverter is highly reliable and efficient due to its convenient design and excellent quality This thre...

Страница 5: ...is especially important to be familiar with the general safety rules for working with electrical equipment 1 2 Safety Rules General introduction These safety related guidelines use the following ANSI...

Страница 6: ...handling Personal injury by crushing shearing cutting or striking CAUTION Cancellation of the operating license If the GMDE inverter is operated with a wrong country code the electric supply company m...

Страница 7: ...at least 15 minutes before proceeding after disconnecting the battery inverter from AC grid and battery packs Operating the inverter Do not commission the device until the overall system complies wit...

Страница 8: ...o property any personal injury any damage or injury arising from or as a result of misuse or abuse or the incorrect installation integration or operation of the product We disclaim any liability for d...

Страница 9: ...r communicates with the power meter that is installed between the AC grid and the customer load With the power related information sent from the power meter the battery inverter can automatically deci...

Страница 10: ...ontact us at service global mde com Note Maximum Charging current Maximum Discharging current Discharging Stop Voltage and Charging Stop Voltage should be set before commissioning to maintain battery...

Страница 11: ...attery inverter is run please refer to Section 3 1 Operation Sequence for disconnecting the battery inverter The GMDE battery inverter provides multiple communication options RS485 D USB Heat is dissi...

Страница 12: ...mber of battery input packs 1 Maximum Discharging Power kW string 6 Discharging Current A string 20 Maximum Charging Power kW string 6 Charging Current A string 20 Table 1 Specifications of GMDE GEato...

Страница 13: ...erating Temperature Range C 25 to 60 45 derating Acoustic Noise dB 55 Enclosure Protection IP IP65 Heat dissipation Forced air cooling Altitude m 2000 no derating Weight kg 26 Dimensions W H D mm 408...

Страница 14: ...D1 or fuse is installed between battery packs and battery inverter Note A DC switch is already integrated into the battery inverter this DC switch cannot been used to directly switch off the inverter...

Страница 15: ...y for maintenance 3 2 Unpacking 3 2 1 Packing List The following items are included in the GMDE battery inverter package 1 GMDE GEatom 306KTLx 1 2 User Manual x 1 3 Certificate of Approval x 1 4 Cable...

Страница 16: ...GMDE GEatom 306KTL Global Mainstream Dynamic Energy Technology Ltd 16 Holding Grip Holding Grip Figure 6 Front panel of GMDE GEatom306KTL...

Страница 17: ...GMDE GEatom 306KTL Global Mainstream Dynamic Energy Technology Ltd 17 3 2 3 Identifying the Inverter Figure 7 Label of GMDE GEatom306KTL...

Страница 18: ...ns must be observed 4 Mount the device at an appropriate distance from combustible materials 5 We recommend that you mount the device at eye level to ensure optimum user comfort 6 Owing to its protect...

Страница 19: ...ll keep both sides vertical and mark screw position 2 Remove the wall bracket and then drill holes 3 Hold the wall bracket in marked position and insert all screws 4 Fix the wall bracket to the wall b...

Страница 20: ...ctrical Connection 3 4 1 Connectors The GMDE inverter is provided with the following connectors as shown below from left to right 1 One pair of battery input terminals 2 Integrated DC switch 3 Communi...

Страница 21: ...e check to ensure that the DC switch is turned off before your connection 2 Insert battery cables into the battery terminals Figure 12 DC connection battery input terminals 3 4 3 AC Connection There i...

Страница 22: ...inverter The male connector could be found in the packing box Please find the recommended AC output cable size Do not use cables of which losses exceed 1 L1 Line 1 L2 Line 2 L3 Line 3 N Neutral G PE...

Страница 23: ...ort GEatom306KTL inverter provides two types of communication ports RS485 and USB RS485 is for external communication and USB is mainly for firmware update Please refer to the following procedures of...

Страница 24: ...Technology Ltd 24 Figure 17 RJ45 plug pins allocation Pin No Illustration 1 2 3 Data 4 GND 5 GND 6 Data 7 5V 8 5V Table 4 RJ45 plug pins illustration B USB port Figure 18 Insert the USB cables Note T...

Страница 25: ...ect the AC grid to the power meter on the marked side Connect the load on the other side Pay attention to the Neutral line connection 2 Connect the RS485 cable to the power meter according to section...

Страница 26: ...tions of the navigating keys and indication lightings around the LCD screen are displayed in the following 1 2 3 4 5 Figure 20 LCD display Table 5 Function introduction Item Symbol Meaning Illustratio...

Страница 27: ...nu of LCD Table 6 Main menu illustration Press key on the Figure 21main menu and then enter into the following selection menu on which more detailed information could be found Item Description Operati...

Страница 28: ...u 4 2 2 Energy Menu Structure In the Energy submenu all the historical data information can be found By pressing on the Figure 22 main selection menu the screen enters into Energy menu In the Energy m...

Страница 29: ...ay The current operating status information could be found in the Run Info menu By pressing on the Figure 22 main selection menu the screen enters into Run Info menu as shown in Figure 24 Figure 24 Ru...

Страница 30: ...The fault and alarm information of the inverter operation is included in this menu Detailed description of the faults and warnings information can be found at section 5 3 Figure 26 Fault Alarm menu s...

Страница 31: ...o the main selection menu from main menu Figure 28 Main selection menu While selecting setting on the main selection menu and pressing to enter into the setting menu a message box will pop up the defa...

Страница 32: ...Press into the default Language setting page Use the navigating keys to select the language The default language is English Figure 31 Language setting Press OK button to finish the password input Pres...

Страница 33: ...the local time Figure 33 Clock setting Press OK button to finish the password input Press Back button to return 4 3 3 Password Setting While pressing key on the main setting window the screen enters...

Страница 34: ...e service center of GMDE who will help you to resume the initial password 4 3 4 Battery Setting While pressing key on the main setting window the screen enters into Bat Setting Figure 35 Selecting Bat...

Страница 35: ...etting not successful d Setting successfully e Not supported at solution 2 f Not supported during the inverter running Figure 36 Battery setting After setting the parameters of the battery packs shut...

Страница 36: ...ting Clear Data A confirmation message box as Figure 38will pop up Figure 38 Message box of Clear Data Press OK button to delete all the historical data Press Back button to cancel 4 4 Fault Warning a...

Страница 37: ...x will pop up Figure 40 Energy data deleting Press Yes button to delete the historical data in this page Press No button to cancel 2 On the Fault Alarm menu window by pressing keys at the same time th...

Страница 38: ...t having been present for more than 15 minutes and cannot be acknowledged by inverter s auto restart Unlike permanent failure a transient failure is automatically acknowledged by the inverter The inve...

Страница 39: ...e master frequency is out of tolerable range Check system frequency and line voltage Service if system frequency is within normal range No Utility Grid voltage 0 Re measure line voltage Service if lin...

Страница 40: ...Wait until the controller has re stabilized Boost Start Warning Time limit exceeded of DC bus soft start Acknowledge error Contact the service if the error occurs repeatedly DC Over Power DC power ov...

Страница 41: ...or Fault The Current sensor is abnormal Service Inverter Curr Fail Inverter current is over the tolerable value Service Bus Low Fail DC bus voltage is too low Service Bus High Fail DC bus voltage is t...

Страница 42: ...cknowledge the fault messages press the OK key or turn the GMDE inverter off with the DC switch Wait for a while and turn the device on again 5 5 Technical Service Back to Top GMDE Room 604 605 Tongpu...

Страница 43: ...3 1 Operation Sequence 6 2 Visual Inspection You should conduct visual inspection at least once a year The visual inspection includes checking the machine cover interface and screen 6 3 DC Switch Year...

Страница 44: ...ntact If you have any questions about our product please contact us GMDE Room 604 605 Tongpu Road No 1220 Putuo District Shanghai 200333 P R China TEL 86 021 60710809 818 FAX 86 021 61730300 E mail Se...

Отзывы: