
R
R
R
-
-
-
G
G
G
-
-
-
B
B
B
GLP
German Light Products GmbH
(Instruction version 1.0) / from software version 1.00/30)
6
2 Preparation and Installation
2.1 Mounting
The
I
I
M
M
P
P
R
R
E
E
S
S
S
S
I
I
O
O
N
N
is fully operational whether it hangs or is mounted to the
wall. It can also be operated while standing on the floor. Keep a safety distance
of 0.5 m towards any easily inflammable materials (decoration etc.).
Pay attention to the regulations of: BGV C1 (former VBG 70)
and DIN VDE 0711-217.
The installation shall be done by qualified staff only.
For the various mounting positions of the
I
I
M
M
P
P
R
R
E
E
S
S
S
S
I
I
O
O
N
N
(standing on the floor,
sideways or hanging) different accessories kits are available. Through this a
safe and firm installation is assured. You'll find special connectors on the
bottom side of the system which are put to use here. In addition the front side of
the system is marked with (FRONT) as this is important for a even orientation
during installation.