Supplied By www.heating spares.co Tel. 0161 620 6677
8
221100C
5 I n s t a l l a t i o n
Diagram 5.2
Diagram 5.3
2458
BACK
BOILER
AIR
DUCT
FLUE
COLLECTOR
ASSEMBLY
MOUNTING BRACKETS
SECURING SCREWS
POSITION
ANCHOR
NUT
Enlarged view of
mounting bracket
MOUNTING BRACKET
SECURING
SCREW
(2)
FLUE
COLLECTOR
ASSEMBLY
2450
1561
Diagram 5.1
5.1 Positioning the Fire Front
Remove the fire front from the base tray.
Place the fire front onto the back boiler air duct, check
that the fire front spigot is central in the flue collector
assembly, push into contact with the fire front fixing
face, see diagram 5.1.
Mark the fire front fixing points through the mounting
bracket holes at the top, see diagram 5.2.
Pull the fire front forward and remove.
Drill the fire front fixing face using a 10mm masonry
drill to a minimum depth of 40mm to accept the anchor
nuts and screws provided.
Place the anchor nuts and screws into holes, screw up
but leave sufficient screw thread proud to accept the fire
front.
Note, if the fire front fixing wall face is not of a solid
construction to a minimum depth of 40mm, for example,
hollow brick or metal an alternative and rigid form of
fastening for the fire front must be used and extra care
taken.
Refer to diagram 5.3.
Offer fire front up at a slight angle to engage fire spigot
and position mounting bracket holes over screws in fire
front fixing wall face.
Lower fire front to locate fire front flue spigot into flue
collector assembly and onto back boiler air duct, push
back onto fire front fixing wall face and tighten up
securing screws.
SECURING
SCREW
(2)
GAS SERVICE
COCK
FIRE FIXING
WALL FACE