9

221764B

Under Car Port etc.

H,I

J

D

F

K

A

A

F

G

E

A

G

G

B,C

B,C

F

F

K

K

K

C

L

L

G

G

3  Flue  and  Ventilation

1112

A

DIRECTLY BELOW AN OPENABLE

mm

WINDOW, AIR VENT, OR ANY
OTHER VENTILATION OPENING

300

B

BELOW GUTTER,DRAIN/SOIL PIPE

300

C

BELOW EAVES

300

D

BELOW A BALCONY OR CAR PORT

600

E

FROM VERTICAL DRAIN PIPES
AND SOIL PIPES

75

F

FROM INTERNAL OR EXTERNAL
CORNERS

600

G

ABOVE ADJACENT GROUND OR
BALCONY LEVEL

300

H

FROM A SURFACE FACING
THE TERMINAL

600

I

FACING TERMINALS

600

J

FROM OPENING (DOOR/WINDOW)
IN CARPORT INTO DWELLING

1200

K

VERTICAL FROM A TERMINAL

1500

L

HORIZONTALLY FROM A TERMINAL  300

 MINIMUM SITING DIMENSIONS FOR
 BALANCED FLUE TERMINALS

Diagram 3.1

FROM
OUTSIDE

COMPARTMENT AIR VENT TABLE

COMPARTMENT
VENTILATION
REQUIREMENTS

169cm

2

  26in

2

169cm

2

26in

2

VENTILATION
FROM ROOM
OR SPACE

338cm

2

52in

2

338cm

2

52in

2

HIGH LEVEL

LOW LEVEL

VENT AREA

VENT AREA

4  Installation

POSITION

  MINIMUM
  SPACING

3.7 Cupboard/Compartment Ventilation

Where the boiler is fitted in a cupboard or compartment, the high
and low level permanent air vents must have effective areas in
accordance with the Compartment Air Vent Table.

Both the high level and the low level air vents must communicate
with the same room, or must both be on the same wall to outside
air.

Before fixing the boiler make sure that the location selected is
in accordance with the requirements of Section 1.8.

4.1 Unpacking

Remove the packaging and then the boiler from its pallet by
removing the screws.

The boiler casing panels are packed separately within the main
carton.  They are designed to enable gas and water connections
to be made before fitting the casing.

The casing brackets, distributor tube and loose items, in a
plastic bag, are packed in the corner fitment.

4.2 Casing Brackets

Fit the two upper and two front casing brackets as shown in
diagram 4.1 using eight of the No.8 screws.

Push the captive nuts, supplied loose, on to the casing brackets
as shown in diagram 4.1.

4.3 Planning Water Connections - Gravity
Domestic and Pumped Heating.

It is important that all connections are made as shown in
diagram 4.2.

Heating flow, either one of the two upper front connections may
be used.

Domestic gravity flow, any one of the three remaining upper
connections may be used.

Heating return, the water distributor tube MUST be fitted into
either one of the front lower connections on all installations, see
diagram 4.3.  The distributor tube is packed in the top fitment.

Содержание Hideaway 100B

Страница 1: ...the Heatcall Customer Service number 01773 828100 Our Guarantee gives you peace of mind plus valuable protection against breakdown by covering the cost of Guarantee Registration Balanced Flue Boiler...

Страница 2: ...certifiedby Notified body 0086 The CE mark on this appliance shows compliance with 1 Directive 90 396 EEC on the approximation of the laws of the Member States relating to appliances burning gaseous f...

Страница 3: ...obtain service please call your installer or Heatcall Glow worm s own service organisation using the telephone number given on the front panel Please be advised that the Benchmark logbook should be co...

Страница 4: ...To Turn the Boiler Off For short periods turn the boiler thermostat control knob B anticlockwise to O The pilot will stay alight To relight the main burner turn thermostat control knob B clockwise to...

Страница 5: ...millimetres except as noted The Seasonal Efficiency Domestic Boilers UK SEDBUK is 73 0 ThevalueisusedintheUKGovernment sStandardAssessment Procedure SAP for energy rating of dwellings The test data f...

Страница 6: ...ast 0 75mm2 24 0 20mm to BS6500 Table 16 must be used for all connections within the boiler casing 1 8 Boiler Location This boiler is not suitable for outside installation The boiler may be installed...

Страница 7: ...be connected to a cistern supply with a minimum head of 1 metre 3ft and a maximum of 27 metres 90ft and having an open vent in the system The boiler must not be connected to a sealed water system 2 2...

Страница 8: ...plasticguttering or within 450mm 18in of painted eaves or gutter an aluminium shield 1 5 metres 5ft long should be fitted to the underside and immediately beneath the guttering The air inlet products...

Страница 9: ...accordance with the Compartment Air Vent Table Boththehighlevelandthelowlevelairventsmustcommunicate with the same room or must both be on the same wall to outside air Before fixing the boiler make s...

Страница 10: ...loose items pack see diagram 4 5 4 6 Pump Within Boiler Casing If the pump is to be fitted inside the boiler casing see diagram 6 2 ensure that a heat shield kit is obtained and fitted Kit No 425839...

Страница 11: ...tioned with the balanced flue duct sticking out into the prepared hole in the wall and pipework connected make good to the inside of the wall face around the boiler flue assembly 4 8 Balanced Flue Ter...

Страница 12: ...ent grille is supplied with the boiler and can be fitted at the rear of the left or right hand side casing The grille is fitted on the opposite side to any pipework connections If required fit the gri...

Страница 13: ...AX MIN MID MAX SIDE CASING L H MAX MID MIN MIN BOILER PLINTH FRONT CASING BRACKET MID No 8 SCREW 4 UPPER CASING BRACKET LOCATING LUG AND SLOTS 0886 5 3 Top Casing The top casing can be fitted in four...

Страница 14: ...the cable does not touch any hot surfaces 6 2 Pump Cable Connection Heat resistant cable as above must be used if the pump is to be fitted inside the casing SupportthecableinasimilarmannertoControlBo...

Страница 15: ...alight repeat the lighting procedure only now keep the control knob pushed for a little longer If the gas control knob A is turned to a safety lock prevents it being turned on again until 3 minutes ha...

Страница 16: ...ration screw Relight the main burner and check for gas soundness with a suitable leak detection fluid 7 4 Completion and User Information Instruct and demonstrate the efficient and safe operation of t...

Страница 17: ...e and burners to be withdrawn forwards Remove graphite coated nut to release baffle tray and remove from combustion chamber taking care not or damage the insulation material in the sides of the chambe...

Страница 18: ...Section 8 1 Disconnect the gas valve plug thermocouple nut and pilot tube connections at the gas valve see diagram 9 1 Support the valve and remove the four right hand flange screws to disconnect the...

Страница 19: ...Thermostat Follow the relevant instructions in Section 8 1 Remove the mains inlet connector by pulling downwards see diagram 8 1 Remove the retaining split pin from the phial pocket then withdraw the...

Страница 20: ...ntrol box and unhooking at the bottom see diagram 9 4 Pull the ignition lead off piezo unit see diagram 9 4 When refitting control box make sure the thermostat capillary is positioned so that it passe...

Страница 21: ...N in inlet connector and gas valve plug terminal N Is there continuity Disconnect ohmmeter and reconnect gas valve plug Restore power to unit Does burner light Boiler in order Isolate electricity sup...

Страница 22: ...re the OPEN CIRCUIT voltage Is voltage greater than 15mV Faulty thermocouple Replace Note the open circuit reading then measure the CLOSED CIRCUIT voltage Note this voltage Referring to the diagnosis...

Страница 23: ...ACTORY Does pilot flame envelop thermocouple Check aeration If necessary Clean pilot rectify blockage in pilot injector or replace Check thermocouple circuit using Thermocouple and Boiler Overheat Cut...

Страница 24: ...British Gas also quote the GC number of the part and appliance 9014 3 5 8 9 10 4 7 6 12 1 2 11 Diagram 11 1 Key No Part No Description GC No 1 203377 Gas control valve 394 151 2 205748 Injector 2 3 2...