Glow-worm Hideaway 100B Скачать руководство пользователя страница 8

Supplied By www.heating spares.co  Tel. 0161 620 6677

8

221764B

2  Water  Systems

3 Flue and  Ventilation

PRESSURE LOSS OF BOILER

Diagram 2.3

1370

1.0

0.8

0.6

0.4

0.2

0

30

20

10

0

0

10

20

30

40

50

FLOW RATE (LITRES/MINUTE)

WATER PRESSURE LOSS

(metre HEAD OF WATER)

WATER PRESSURE LOSS

(INCHES HEAD OF WATER)

1.2

40

0 1 2 3 4 5 6 7 8

10

9

FLOW RATE (GALLON/MINUTE)

2.6 Cylinder

For all systems supplying domestic hot water the cylinder must
be indirect and to the appropriate British Standard.

2.7 Safety Valve

A safety valve need not be fitted to an open vented system.

2.8 Draining Tap

A drain tap must be provided at the lowest points of the system
which will allow the entire system, including the boiler and
domestic hot water cylinder to be drained.  Drain taps shall
comply with the current issue of BS2879.

3.1 Flue

Detailed recommendations for flues are given in the current
issue of BS5440 Part 1.

The boiler must be installed so that the flue terminal is exposed
to the external air.  It is important that the position allows the free
passage of air across it at all times.

3.2 Terminal Positioning

The minimum acceptable spacings for the terminal to
obstructions, other terminals and ventilation openings are given
in diagram 3.1.

Car port or similar extensions of a roof only, or roof and one wall,
require special action with regard to openings, doors and
windows under the roof.  Care is required in protecting plastic
roofs.  If the car port consists of a roof and two or more walls
seek advice form the local gas undertaking.

Where the terminal is within 850mm (34in) below plastic guttering,
or within 450mm (18in) of painted eaves or gutter an aluminium
shield 1.5 metres (5ft) long should be fitted to the underside and
immediately beneath the guttering.

The air inlet/products outlet duct and the terminal of the boiler
must not be closer than 25mm (1in) to combustible material.

3.3 Timber Frame Buildings

If the boiler is to be installed in a timber frame building it should
be fitted in accordance with the Institute of Gas Engineers
document IGE/UP/7/1998.  If in doubt seek advice from the local
gas undertaking or Hepworth Heating Ltd.

3.4 Terminal Guard

A terminal guard is required if persons could come into contact
with the terminal or the terminal could be subject to damage.

If a terminal guard is required, it must be positioned to provide
a minimum of 50mm clearance from any part of the terminal and
be central over the terminal.

A suitable guard is available from

Tower Flue Components Ltd.,
Morley Road,
Tonbridge,
Kent.
TN9 1RA

   reference type “F”

3.5 Flue Duct Length

The flue lengths quoted below allow the minimum rear clearance
of 3mm (

1

/

8

inch) behind the boiler, although the boiler can be

installed further away from the inside wall.  In such cases any
extra clearance behind the boiler must be added to the wall
thickness to obtain the flue duct length.

Check the wall thickness/flue duct length where the boiler is
fitted.   Flues available are:
Standard pack - 280 to 410mm (11 to 16inches).
Short pack -    150 to 280mm (6 to 11inches)
Extension Kit   (+standard pack) 410 to 610mm

(16 to 24inches)

The short flue pack, part No.425504 and the extension kit, part
No.424873 are available to order.           Standard pack is part
No.424886.

3.6 Room Ventilation

The boiler is room sealed and does not require the room or
space containing it to have permanent air vents.

Содержание Hideaway 100B

Страница 1: ...the Heatcall Customer Service number 01773 828100 Our Guarantee gives you peace of mind plus valuable protection against breakdown by covering the cost of Guarantee Registration Balanced Flue Boiler...

Страница 2: ...certifiedby Notified body 0086 The CE mark on this appliance shows compliance with 1 Directive 90 396 EEC on the approximation of the laws of the Member States relating to appliances burning gaseous f...

Страница 3: ...obtain service please call your installer or Heatcall Glow worm s own service organisation using the telephone number given on the front panel Please be advised that the Benchmark logbook should be co...

Страница 4: ...To Turn the Boiler Off For short periods turn the boiler thermostat control knob B anticlockwise to O The pilot will stay alight To relight the main burner turn thermostat control knob B clockwise to...

Страница 5: ...millimetres except as noted The Seasonal Efficiency Domestic Boilers UK SEDBUK is 73 0 ThevalueisusedintheUKGovernment sStandardAssessment Procedure SAP for energy rating of dwellings The test data f...

Страница 6: ...ast 0 75mm2 24 0 20mm to BS6500 Table 16 must be used for all connections within the boiler casing 1 8 Boiler Location This boiler is not suitable for outside installation The boiler may be installed...

Страница 7: ...be connected to a cistern supply with a minimum head of 1 metre 3ft and a maximum of 27 metres 90ft and having an open vent in the system The boiler must not be connected to a sealed water system 2 2...

Страница 8: ...plasticguttering or within 450mm 18in of painted eaves or gutter an aluminium shield 1 5 metres 5ft long should be fitted to the underside and immediately beneath the guttering The air inlet products...

Страница 9: ...accordance with the Compartment Air Vent Table Boththehighlevelandthelowlevelairventsmustcommunicate with the same room or must both be on the same wall to outside air Before fixing the boiler make s...

Страница 10: ...loose items pack see diagram 4 5 4 6 Pump Within Boiler Casing If the pump is to be fitted inside the boiler casing see diagram 6 2 ensure that a heat shield kit is obtained and fitted Kit No 425839...

Страница 11: ...tioned with the balanced flue duct sticking out into the prepared hole in the wall and pipework connected make good to the inside of the wall face around the boiler flue assembly 4 8 Balanced Flue Ter...

Страница 12: ...ent grille is supplied with the boiler and can be fitted at the rear of the left or right hand side casing The grille is fitted on the opposite side to any pipework connections If required fit the gri...

Страница 13: ...AX MIN MID MAX SIDE CASING L H MAX MID MIN MIN BOILER PLINTH FRONT CASING BRACKET MID No 8 SCREW 4 UPPER CASING BRACKET LOCATING LUG AND SLOTS 0886 5 3 Top Casing The top casing can be fitted in four...

Страница 14: ...the cable does not touch any hot surfaces 6 2 Pump Cable Connection Heat resistant cable as above must be used if the pump is to be fitted inside the casing SupportthecableinasimilarmannertoControlBo...

Страница 15: ...alight repeat the lighting procedure only now keep the control knob pushed for a little longer If the gas control knob A is turned to a safety lock prevents it being turned on again until 3 minutes ha...

Страница 16: ...ration screw Relight the main burner and check for gas soundness with a suitable leak detection fluid 7 4 Completion and User Information Instruct and demonstrate the efficient and safe operation of t...

Страница 17: ...e and burners to be withdrawn forwards Remove graphite coated nut to release baffle tray and remove from combustion chamber taking care not or damage the insulation material in the sides of the chambe...

Страница 18: ...Section 8 1 Disconnect the gas valve plug thermocouple nut and pilot tube connections at the gas valve see diagram 9 1 Support the valve and remove the four right hand flange screws to disconnect the...

Страница 19: ...Thermostat Follow the relevant instructions in Section 8 1 Remove the mains inlet connector by pulling downwards see diagram 8 1 Remove the retaining split pin from the phial pocket then withdraw the...

Страница 20: ...ntrol box and unhooking at the bottom see diagram 9 4 Pull the ignition lead off piezo unit see diagram 9 4 When refitting control box make sure the thermostat capillary is positioned so that it passe...

Страница 21: ...N in inlet connector and gas valve plug terminal N Is there continuity Disconnect ohmmeter and reconnect gas valve plug Restore power to unit Does burner light Boiler in order Isolate electricity sup...

Страница 22: ...re the OPEN CIRCUIT voltage Is voltage greater than 15mV Faulty thermocouple Replace Note the open circuit reading then measure the CLOSED CIRCUIT voltage Note this voltage Referring to the diagnosis...

Страница 23: ...ACTORY Does pilot flame envelop thermocouple Check aeration If necessary Clean pilot rectify blockage in pilot injector or replace Check thermocouple circuit using Thermocouple and Boiler Overheat Cut...

Страница 24: ...British Gas also quote the GC number of the part and appliance 9014 3 5 8 9 10 4 7 6 12 1 2 11 Diagram 11 1 Key No Part No Description GC No 1 203377 Gas control valve 394 151 2 205748 Injector 2 3 2...

Отзывы: