Glow-worm Hideaway 100B Скачать руководство пользователя страница 2

Supplied By www.heating spares.co  Tel. 0161 620 6677

2

221764B

Important Information

Introduction

3

Lighting the Boiler

4

General Data

1

5

Water Systems

2

7

Flue and Ventilation

3

8

Installation

4

9

Casing Location / Fitting

5

12

Electrical Wiring

6

14

Commissioning

7

15

Servicing

8

17

Replacement Parts

9

18

Fault Finding

10

21

Spare Parts

11

24

     CONTENTS

   DESCRIPTION                                         SECTION

  PAGE No.

INSTRUCTIONS

FOR USE

INSTALLATION

INSTRUCTIONS

SERVICING

INSTRUCTIONS

Testing and Certification

This boiler is tested and certificated for safety and performance.  It is therefore important that no alteration is made to the boiler, without
permission, in writing, from Hepworth Heating Ltd.

Any alteration not approved by Hepworth Heating Ltd., could invalidate the certification, boiler warranty and may also infringe the
current issue of the Statutory Requirements, see Section 1.4.

CE Mark

This boiler meets the requirements of Statutory Instrument No. 3083 The boiler (Efficiency) Regulations, and therefore is deemed
to meet the requirements of Directive 92/42/EEC on the efficiency requirements for new hot water boilers fired with liquid or gaseous
fuels.

Type test for purposes of Regulation 5 certified by: Notified body 0086.

Product/productioncertifiedby: Notified body 0086.

The CE mark on this appliance shows compliance with:

1. Directive 90/396/EEC on the approximation of the laws of the Member States relating to appliances burning gaseous fuels.

2. Directive 73/23/EEC on the harmonization of the Laws of the Member States relating to the electrical equipment designed
    for use within certain voltage limits.

3. Directive 89/336/EEC on the approximation of the Laws of the Member States relating to electromagnetic compatibility.

INFORMATION FOR THE INSTALLER AND SERVICE ENGINEER.

Under Section 6 of The Health and Safety at Work Act 1974, we are required to provide  information on substances hazardous to
health.

CERAMIC FIBRE/INSULATION PADS, GLASSYARN.

These can cause irritation to skin, eyes and the respiratory tract. If you have a history of skin complaint you may be susceptible to
irritation. High dust levels are usual only if the material is broken. Normal handling should not cause discomfort, but follow normal
good hygiene and wash your hands before eating, drinking or going to the lavatory. If you do suffer irritation of the eyes or severe
irritation to the skin seek medical attention.

THERMOSTATS

These contain very small amounts of xylene in the sealed phial and capillary. If broken, under normal circumstances the fluid does
not cause a problem, but in case of skin contact, wash with cold water. If swallowed drink plenty of water and  seek medical attention.

Содержание Hideaway 100B

Страница 1: ...the Heatcall Customer Service number 01773 828100 Our Guarantee gives you peace of mind plus valuable protection against breakdown by covering the cost of Guarantee Registration Balanced Flue Boiler...

Страница 2: ...certifiedby Notified body 0086 The CE mark on this appliance shows compliance with 1 Directive 90 396 EEC on the approximation of the laws of the Member States relating to appliances burning gaseous f...

Страница 3: ...obtain service please call your installer or Heatcall Glow worm s own service organisation using the telephone number given on the front panel Please be advised that the Benchmark logbook should be co...

Страница 4: ...To Turn the Boiler Off For short periods turn the boiler thermostat control knob B anticlockwise to O The pilot will stay alight To relight the main burner turn thermostat control knob B clockwise to...

Страница 5: ...millimetres except as noted The Seasonal Efficiency Domestic Boilers UK SEDBUK is 73 0 ThevalueisusedintheUKGovernment sStandardAssessment Procedure SAP for energy rating of dwellings The test data f...

Страница 6: ...ast 0 75mm2 24 0 20mm to BS6500 Table 16 must be used for all connections within the boiler casing 1 8 Boiler Location This boiler is not suitable for outside installation The boiler may be installed...

Страница 7: ...be connected to a cistern supply with a minimum head of 1 metre 3ft and a maximum of 27 metres 90ft and having an open vent in the system The boiler must not be connected to a sealed water system 2 2...

Страница 8: ...plasticguttering or within 450mm 18in of painted eaves or gutter an aluminium shield 1 5 metres 5ft long should be fitted to the underside and immediately beneath the guttering The air inlet products...

Страница 9: ...accordance with the Compartment Air Vent Table Boththehighlevelandthelowlevelairventsmustcommunicate with the same room or must both be on the same wall to outside air Before fixing the boiler make s...

Страница 10: ...loose items pack see diagram 4 5 4 6 Pump Within Boiler Casing If the pump is to be fitted inside the boiler casing see diagram 6 2 ensure that a heat shield kit is obtained and fitted Kit No 425839...

Страница 11: ...tioned with the balanced flue duct sticking out into the prepared hole in the wall and pipework connected make good to the inside of the wall face around the boiler flue assembly 4 8 Balanced Flue Ter...

Страница 12: ...ent grille is supplied with the boiler and can be fitted at the rear of the left or right hand side casing The grille is fitted on the opposite side to any pipework connections If required fit the gri...

Страница 13: ...AX MIN MID MAX SIDE CASING L H MAX MID MIN MIN BOILER PLINTH FRONT CASING BRACKET MID No 8 SCREW 4 UPPER CASING BRACKET LOCATING LUG AND SLOTS 0886 5 3 Top Casing The top casing can be fitted in four...

Страница 14: ...the cable does not touch any hot surfaces 6 2 Pump Cable Connection Heat resistant cable as above must be used if the pump is to be fitted inside the casing SupportthecableinasimilarmannertoControlBo...

Страница 15: ...alight repeat the lighting procedure only now keep the control knob pushed for a little longer If the gas control knob A is turned to a safety lock prevents it being turned on again until 3 minutes ha...

Страница 16: ...ration screw Relight the main burner and check for gas soundness with a suitable leak detection fluid 7 4 Completion and User Information Instruct and demonstrate the efficient and safe operation of t...

Страница 17: ...e and burners to be withdrawn forwards Remove graphite coated nut to release baffle tray and remove from combustion chamber taking care not or damage the insulation material in the sides of the chambe...

Страница 18: ...Section 8 1 Disconnect the gas valve plug thermocouple nut and pilot tube connections at the gas valve see diagram 9 1 Support the valve and remove the four right hand flange screws to disconnect the...

Страница 19: ...Thermostat Follow the relevant instructions in Section 8 1 Remove the mains inlet connector by pulling downwards see diagram 8 1 Remove the retaining split pin from the phial pocket then withdraw the...

Страница 20: ...ntrol box and unhooking at the bottom see diagram 9 4 Pull the ignition lead off piezo unit see diagram 9 4 When refitting control box make sure the thermostat capillary is positioned so that it passe...

Страница 21: ...N in inlet connector and gas valve plug terminal N Is there continuity Disconnect ohmmeter and reconnect gas valve plug Restore power to unit Does burner light Boiler in order Isolate electricity sup...

Страница 22: ...re the OPEN CIRCUIT voltage Is voltage greater than 15mV Faulty thermocouple Replace Note the open circuit reading then measure the CLOSED CIRCUIT voltage Note this voltage Referring to the diagnosis...

Страница 23: ...ACTORY Does pilot flame envelop thermocouple Check aeration If necessary Clean pilot rectify blockage in pilot injector or replace Check thermocouple circuit using Thermocouple and Boiler Overheat Cut...

Страница 24: ...British Gas also quote the GC number of the part and appliance 9014 3 5 8 9 10 4 7 6 12 1 2 11 Diagram 11 1 Key No Part No Description GC No 1 203377 Gas control valve 394 151 2 205748 Injector 2 3 2...

Отзывы: