6 Installation Preparation
6.1 Appliance Pack
Please check the contents of packs as shown in diagram 6.1.
The packs are located in the top polystyrene packing.
Remove the carton sleeve and top pack then lift the boiler and
its polystyrene base support out of the lower pack.
6.2 Site Requirements
The boiler mounting wall should be suitable for the weight of the
appliance and be true and
fl
at.
NOTE:
Due to the varied site conditions we do not supply
fi
xings and advise that the installer should supply those which
are suitable.
6.3 Wall Template
Take the wall template from the document pack located within
the top polystyrene packing
and place in the desired position
on the wall, giving due consideration to the required boiler
clearances,
see section 3
, and the
fl
ue you are
fi
tting.
Mark the position of the
fl
ue centre, if
fi
tting a side
fl
ue, extend
the
fl
ue centre line into the corner then 149mm along the
adjacent wall, see diagram 6.2.
For extended side
fl
ues, the
fl
ue hole centre should be
determined by extending the dashed inclined line on the
template to the side wall, then 149mm along the adjacent wall,
see diagram 6.2. This dashed line is drawn at 44mm/metre
(2.5°) rise from the boiler.
To allow for the
fl
ue passing through the wall at this angle a
125mm hole should be drilled irrespective of internal or external
installation.
Remove the wall template whilst drilling the
fl
ue hole.
6.4 Flue Hole Cutting
External access
fl
ue installation can use a 105mm diameter
core drill.
Internal access only
fl
ue installation will need a 125mm
diameter core drill.
NOTE:
The
fl
ue is designed with an internal fall of 44mm/metre
(2.5°), therefore the hole can be drilled horizontally.
If
fl
ue extension pipes are to be used then a core drill size of
125mm is required. This will allow the extension pieces to
slope at 44mm/metre (2.5°) towards the boiler.
14020
Diagram 6.2
Diagram 6.1
14805
Documentation Pack
(not illustrated)
Wall Template, User Instructions,
Installation and Servicing Instructions,
Flue Installation Instructions.
Содержание 12hx
Страница 7: ...0020107230_04 12 14 Glow worm TECHNICAL DATA 7 14730 1 Boiler Specification ...
Страница 23: ...0020107230_04 12 14 Glow worm INSTALLATION 23 15826 Diagram 9 2 ...
Страница 34: ...0020107230_04 12 14 Glow worm MAINTENANCE 34 13917 Diagram 13 4 ...
Страница 35: ...0020107230_04 12 14 Glow worm MAINTENANCE 35 13012 Diagram 13 5 ...
Страница 50: ......
Страница 51: ......