0020107230_04 - 12/14 - Glow-worm
INSTALLATION
- 15 -
• Where possible keep the existing boiler/circulating pump in
place when
fl
ushing the system
5.6.2 Flushing the system
• Fill the system with cold water and check for leaks.
• Open all drain cocks and drain the system.
• Close drain cocks and add a suitable
fl
ushing agent (cleaner)
compatible with Aluminium
at the correct strength for the
system conditions in accordance with the manufacturer’s
instructions.
Examples of suitable
fl
ushing agents/cleansers are:
Sentinel X300, X400
Fernox F3
• Circulate
the
fl
ushing agent before the boiler is
fi
red up.
• Run the boiler/system at normal operating temperature as
directed by the manufacturer of the
fl
ushing agent.
• It is essential to drain and thoroughly
fl
ush the whole system
to remove the
fl
ushing agent and debris.
• It may be necessary to use a power
fl
ushing machine to aid
the cleansing procedure in some circumstances.
• Close the drain cocks and re
fi
ll with fresh water and a
suitable inhibitor.
• Vent any air from the boiler and system.
5.6.3 Inhibiting the system
Add a suitable inhibitor or combined inhibitor/anti-freeze, if the
system is exposed to freezing conditions, to the heating system
in accordance with the DWTA code of practice and inhibitor
manufacturer’s guidelines.
Examples of suitable inhibitors are:
Sentinel X100
Fernox protector F1
Artifi cially softened water must not be used to
fi ll the central heating system.
Sealing agents - The addition of sealing agents
to the system water is not permitted as this can
cause problems with deposits left in the heat
exchanger.
Содержание 12hx
Страница 7: ...0020107230_04 12 14 Glow worm TECHNICAL DATA 7 14730 1 Boiler Specification ...
Страница 23: ...0020107230_04 12 14 Glow worm INSTALLATION 23 15826 Diagram 9 2 ...
Страница 34: ...0020107230_04 12 14 Glow worm MAINTENANCE 34 13917 Diagram 13 4 ...
Страница 35: ...0020107230_04 12 14 Glow worm MAINTENANCE 35 13012 Diagram 13 5 ...
Страница 50: ......
Страница 51: ......