background image

RETRO-FIT/COMMERCIAL SERIES 

STEP 1

: Locate the retro-fit anchoring system template (included and shown above) 

 Once you determine where your  lift is going to be located place the template down 

   so you can mark on the concrete where you will need to drill the holes. 

 The dimensions are as follows: Front  of the Template must be 12” to 17”  

   from the water’s edge,  also make sure that the front holes are parallel to the pools edge. 

 Distance must be 12” to 17”  

From water’s edge 

Front Holes 

Hole’s parallel with pool’s edge 

***NOTE: The installation of Global Lift Corp’s anchor system’s are a 

guideline of minimum requirements. In some states or municipalities they 

may require additional steps due to their local codes or ordinances.***  

Feb 2012 

Содержание COMMERCIAL SERIES

Страница 1: ...COMMERCIAL SERIES LIFTS C 375 C 450 RETRO FIT ANCHORING METHOD INSTALLATION MANUAL RETRO FIT COMMERCIAL SERIES Feb 2012...

Страница 2: ...CIAL SERIES RETRO FIT ANCHORING METHOD C 375 C 450 COMMERCIAL SERIES LIFTS PACKING LIST 3 Threaded Anchor s with base 3 5 8 Nuts 3 5 8 x 1 Bolts 3 Bonding lugs w nut bolts 3 Plastic Caps 1 T Shaped Te...

Страница 3: ...and the pool edge shall have a slope not steeper than 1 48 Clear Deck Space On the side of the seat opposite the water a clear deck space shall be provided parallel with the seat The space shall be 36...

Страница 4: ...he dimensions are as follows Front of the Template must be 12 to 17 from the water s edge also make sure that the front holes are parallel to the pools edge Distance must be 12 to 17 From water s edge...

Страница 5: ...rilling Your holes they must be 6 deep and flat on the bottom of the hole shown above Clean Out the debris and make the holes are free from concrete Double check your measurements they should be Front...

Страница 6: ...bolts provided refer to picture A Place the assembly in your drilled holes as shown in picture B make sure that the top Of the anchor rods are flush and level with the existing concrete also with con...

Страница 7: ...e label and follow manufacturer s instructions Start pouring into the 3 holes evenly until you fill them up make sure not to overfill the Holes so that it does not create more work to scrap excess con...

Отзывы: