global lift corp COMMERCIAL SERIES Скачать руководство пользователя страница 7

RETRO-FIT/COMMERCIAL SERIES 

STEP 4: 

Cementing the anchor in the concrete. 

 You will need 20lbs of Quick dry Anchoring Cement (Commercial Grade Quikrete Exterior 

Use Anchoring Cement) to complete the installation. You can purchase at any hardware 
store in your area. Read the label and follow manufacturer’s instructions. 

 Start pouring into the 3 holes evenly until you fill them up, make sure not to overfill the 

Holes so that it does not create more work to scrap excess concrete off.  

 Let the concrete set for 24hrs, Remove the template then sand the area with a  

sand stone to smooth the finish. Make sure the anchor’s are flush with the concrete 
(picture B) 

 You are now ready to install your Commercial Series lift. 

Picture A 

Picture B 

Feb 2012 

Содержание COMMERCIAL SERIES

Страница 1: ...COMMERCIAL SERIES LIFTS C 375 C 450 RETRO FIT ANCHORING METHOD INSTALLATION MANUAL RETRO FIT COMMERCIAL SERIES Feb 2012...

Страница 2: ...CIAL SERIES RETRO FIT ANCHORING METHOD C 375 C 450 COMMERCIAL SERIES LIFTS PACKING LIST 3 Threaded Anchor s with base 3 5 8 Nuts 3 5 8 x 1 Bolts 3 Bonding lugs w nut bolts 3 Plastic Caps 1 T Shaped Te...

Страница 3: ...and the pool edge shall have a slope not steeper than 1 48 Clear Deck Space On the side of the seat opposite the water a clear deck space shall be provided parallel with the seat The space shall be 36...

Страница 4: ...he dimensions are as follows Front of the Template must be 12 to 17 from the water s edge also make sure that the front holes are parallel to the pools edge Distance must be 12 to 17 From water s edge...

Страница 5: ...rilling Your holes they must be 6 deep and flat on the bottom of the hole shown above Clean Out the debris and make the holes are free from concrete Double check your measurements they should be Front...

Страница 6: ...bolts provided refer to picture A Place the assembly in your drilled holes as shown in picture B make sure that the top Of the anchor rods are flush and level with the existing concrete also with con...

Страница 7: ...e label and follow manufacturer s instructions Start pouring into the 3 holes evenly until you fill them up make sure not to overfill the Holes so that it does not create more work to scrap excess con...

Отзывы: