7. Position 2- 2’ lengths of 2” X 10” lumber under each side of back wall taking care to protect wiring
raceway on control module end.
1. Lower oven onto dollies.
2. Remove lifts and lifting pipe.
3. Roll oven into position in front of base assembly.
4. Reinsert lift pipe and lifts.
5. Lift oven off of dollies.
6. Rotate oven to the horizontal position and roll base under oven.
7.
Lower oven onto base assembly taking care that the flange overlaps the base as shown in Fig. 11
& 12.
Fig 11
Fig 12
8. Remove lifts and lift pipe.
9. Remove lift adapters. NOTE: Retain the thumbscrews used to mount the lift adapters, as they
will be needed to mount the eyebrows later.
16